最大水深線 的英文怎麼說

中文拼音 [zuìshuǐshēnxiàn]
最大水深線 英文
line of maximum depth
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 水深 : depth of water水深計 water gage; 水深圖 fathogram; bathygram; 水深儀 fathometer
  1. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌、巖爆和變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸剖面的地應力分佈規律:地應力量級在附近達到值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  2. Based on nonlinear finite element theory, stress and deformation behaviors are analyzed after ground stabilization and foundation pit reinforcement with deep mixing method. by comparison of the conditions of treatment and non - treatment of two examples respectively, the results indicate that the match ratio scheme used for deep mixing method is more ideal when soft clay is stabilized in this area of fuzhou in the thesis. this scheme not only can fully utilize industrial waste material, but also can economize construction cost

    對于加固土的工程特性,本文以非性有限元理論為基礎,模擬分析泥攪拌樁加固地基和基坑支護加固的應力和變形情況;通過兩個例子分別在有處理和無處理情況下的對比,利用固化劑佳摻入比來設計地基處理方案,並運用非性有限元方法計算出土體內小主應力的分佈情況以及變形情況,結果表明本文所得出的配合比方案用於層攪拌樁法來對福州地區軟粘土進行地基加固時還是比較理想的,這樣不僅充分利用工業廢料,還可節約工程造價。
  3. Through the physical model experiment, the wave forces over submerged dyke and transmission coefficient are analyzed under the action of regular wave. in the test of wave forces, the rectangle - type submerged dyke is used as research object, and when analyzing the total wave forces, the effect of water depth before the dyke and that of the wave parameters is considered. based on the test, through the methods of multi - element linear regression, experimental formulae are given to calculate maximum total wave forces in horizontal direction, its relative vertical wave forces and maximum wave forces before and after the dyke, which are compared with the present formulae

    在潛堤波力的研究中,選取矩型潛堤作為研究對象,在分析各個影響因素對潛堤波力影響的基礎上,選取兩個主要的影響因素,即相對波高和相對作為研究重點,在物理模型試驗結果的基礎上,定性地研究分析了潛堤所受的總波力隨相對波高和相對的變化規律,並在此基礎上,利用多元性回歸的方法,分別給出了在本文試驗條件下計算潛堤平總波力及其相對應的垂向總波力的經驗公式以及計算堤前堤后總波力的經驗公式,並與已存在的計算公式進行了對比。
  4. Through the excel program, and combining the inside and outside environment of the excavation and stress field and displace field, the data of stress and displacement of points are analyzed in variable depth and load grade and terminal state. the spss software has been applied to the statistics of geometry parameter of failure surface, and the failure surface criterion is created by the linearity regression from d ( the longest horizontal distance between the failure surface and the side face of the slope ), ho ( the depth

    此外,應用spss軟體對試驗破壞滑弧的幾何參數進行統計分析,並對滑弧的入距離d及d處至坑底的高度h _ 0結合各理指標進行多元性回歸,建立滑面的判據,並對此判據進行修正,且用實際工程對其進行評價,通過反算已知滑面的c 、值,表明邊界條件對破壞形式有極的干擾作用,所直接看到的破壞類型土體不是發生整體滑移破壞,而是剝落式的潰屈破壞。
  5. Based on the data on scour around large diameter cylinders exposed to waves and currents, effects of every kind of sea enviromental parameters on maximum scour depth are analyzed and guided by dimensional analysis and multidimensional linear regression, an equation is given to compute maximum scour depth around large diameter cylinders in combined waves and currents. compared with some other equations, this equation is more accrete, simpler and clearer and the compute d results are in good agreement with experimental ones

    本論文主要是在總結國內外研究成果基礎上,從波浪與流共同作用下海床上直立直徑圓柱建築物周圍的局部沖刷機理出發,研究和探討了圓柱周圍的沖淤形態;分析各種海洋環境參數對沖刷度的影響,並利用已取得的實驗資料,採用量綱分析原理和多元性回歸分析方法,建立一個波流共同作用下海床上直立直徑圓柱建築物周圍的沖刷度計算公式。
  6. Firstly, this issue analyzed the external environment of the coal transport in qin port, explained the ability of the " three west " coal rails passageway, the trains near the port, and the turnoff of the surrounding ports, then emphasized on the computation and analysis of the rails which connect qin port with the places of coal origin. secondly, it analyzed the rails and surrounding ports developing trend, coal demands, the tendency of large - size of ship, and the port adaptability. finally, based on those analysises, i put forward a plan of the construction of specialized deep - water coal berth for foreign trade coal in the coal fourth phrase of qin huangdao port

    本文首先,從分析秦皇島港煤炭運輸的外部環境入手,通過對「三西」煤炭鐵路運輸通路、港口所在地區的鐵路以及周邊港口概況的敘述,著重對秦皇島港鐵路(主要路:、京山、京秦)的運輸通過能力進行了計算與分析;其次,對鐵路及周邊港口發展趨勢、煤炭市場需求、船舶型化趨勢和港口適應性進行了分析;後,在以上諸多分析的基礎上,提出建設外貿煤炭專用碼頭的可行性方案,從而改善秦皇島港型船舶的裝卸條件,形成在外貿煤炭船舶裝卸的比較優勢,提高秦皇島港在外煤運輸市場的競爭力,並對方案未來的實施效果進行了分析。
  7. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基敏感的部位,設計方案是否安全、科學和合理,對壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地利樞紐工程厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基平鋪蓋防滲方案,分別按竣工期和蓄運行期的不同工作情況進行了有限元非性計算分析;對左岸高陡邊坡的壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區小的確定提供了重要依據。
  8. Based on analysis of the characteristics of the composite soil nailed wall, simulating the soil nail, concrete layer, deep mixing pile and step excavation, a model is established to calculate the deformation of the wall, compiled simple and applied program of one dimension fem ; according to the field test data and the calculated data by the fem software this paper has developed, the design method and deformation of the wall in xi ' an area is discussed. the shape of destructive sliding surface of the wall in loess strata in xi ' an area with deep groundwater is gotten. finally the lateral deformation distribution and the experiential formula to predict maximal horizontal displacement of the composite soil nailed wall are given

    針對復合土釘墻構造的特點,建立了模擬復合土釘墻受力變形的一種計算模型,該計算模型可對土釘、面層、層攪拌樁以及分層開挖等進行簡化模擬;編寫了簡單實用的桿系有限元程序;結合工程實測資料及有限元法分析的結果,探討了西安地區的土釘設計以及復合土釘墻的變形規律,得出了西安地區一般黃土在無地下時的破壞滑動面形狀,復合土釘墻的側向變形曲以及計算復合土釘墻平位移的經驗公式。
  9. Qqct is one of the largest container terminals in china with the longest quay line and deepest draft to accommodate super large container vessels and provide efficient and economic service to the shipping lines

    規模優勢:中國集裝箱碼頭,碼頭岸長,吃,堆場廣闊,便於型船舶作業,有利於船公司降低成本,實現規模效益化。
  10. The company is located in the baima harbor, which is the first class national opening port its position is 1194018 " e 264816 " n the harbor, which is more than 2, 000 meters wide, 11 - 18 mrters deep, has its biggest tidal range of 9. 37 meters it has a milder less extreme climate with the average temperature of 19. 3 so its called as the natural excellent harbour, the transportation is convenient with sea routes reaching shanghai on thenorth hongkong on the south and keelung separated by taiwan strait its only 1. 5 hours drive from the corporation to the changle international airport by the fuzhou wenzhou expressway

    公司地處國家一級開放口岸白馬港內,坐標為東經1194018 ,北緯264816 ,這裏海域寬2000多米,1118米,潮差9 . 37米左右年均氣溫19 . 3 ,是夏無酷暑冬無嚴寒的天然良港。這里交通便利,交通網發達。北至上海南達香港都有航相通,與基隆也只有一之隔。
  11. The four diversion tunnels of jinping cascade 2 hydroelectric power station is 16. 625 km long averagely and 2525m deep in maximal bury - depth. in the construction region the maximum of principal geostress reached 54mpa

    錦屏二級電站四條引隧洞平均長度16 . 625km ,達2525m左右,洞高程處地應力主應力值達54mpa ,工程區屬高地應力區。
分享友人