最小站 的英文怎麼說

中文拼音 [zuìxiǎozhàn]
最小站 英文
minimum station
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ形容詞1 (體積、面積、數量、強度等不大) small; little; petty; minor 2 (年紀小的; 年幼的) youn...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. The minimum income is the electricity reducing of draft fan and the minimum cost is the electricity cost of sootblower drive. also it is gathered that sootblowing reasonably can bring about several decuple profit compared with the sootblowing cost

    其中的收益和成本分別是降低引風機電耗和驅動裝置電耗成本,後得出電鍋爐合理吹灰可以獲得數十倍利潤。
  2. Three steps of the method are, first, genetic algorithm is adopted in the whole planning area to hunt the possible traverse sequence of the substations ; second, the least weight match algorithm in graph theory is adopted to optimize the tie lines between each substation and its neighbors according to the traverse sequence determined in the first step ; finally, the scheme which has the least cost of investment in tie lines will be taken as the ultimate scheme

    第一層優化是在整個規劃區域內,應用遺傳演算法搜索可能的變電的遍歷順序;第二層優化是按照第一層優化確定的遍歷順序,應用綱絡圖論中的權匹配演算法分別對每一個變電與其相鄰之間的聯絡線進行優化。
  3. The disposition of everything in the rooms, from the largest object to the least ; the arrangement of colours, the elegant variety and contrast obtained by thrift in trifles, by delicate hands, clear eyes, and good sense ; were at once so pleasant in themselves, and so expressive of their originator, that, as mr. lorry stood looking about him, the very chairs and tables seemed to ask him, with something of that peculiar expression which he knew so well by this time, whether he approved

    室內諸物的安排從大件到件,它們的色調搭配,高雅的變化和對比那是通過節約筆的開支,再加上巧妙的手敏銳的目光和良好的鑒賞力所取得的都令人賞心悅目,體現了設計者的雅趣。因此,當羅瑞先生在屋裡四面打量的時候,就連桌子椅子都似乎帶著一種他現在已頗為熟悉的特殊表情在徵求他的意見:是否滿意?
  4. This paper analyzes the character of the transformer load and presents the control means to reduce the comprehensive power loss to minimum by controlling the transformer operation status, which forecasts the daily load of transformer by periodical auto - regression model ( par ) and divides the daily flow line automatically into two typical phases. then, this paper simulates the par by matlab. at last, a real intelligent control device based on the ti ’ s tms320lf2407 dsp has been completed

    論文分析了配電變壓器的負載特點;提出採用周期自回歸模型預測配電用電日負荷,根據負荷預測結果和用電時段,以綜合功率損耗為目的變壓器經濟運行控制方法;以ti公司的tms320lf2407dsp為基礎,完成了配電變壓器經濟運行智能監控裝置的研製。
  5. A lot of papers about the report of probabilistic risk assessment of daya bay npp and system manuals has been read by the author and let as the basis. in this paper, based on the reliability analysis methods of failure mode and effect analysis and failure tree analysis, according to the result of event tree analysis of probabilistic risk assessment report of daya bay npp, the top events of the fault trees of reactor protection system and the success criteria were established. by using risk - spectrum procedure, the unavailability and the minimal cut - sets ( mcs ) of the fault trees were obtained

    本文在閱讀了大量的大亞灣核電pra報告和各種系統手冊等資料的基礎上,採用fmea (故障模式和影響分析)和fta (故障樹分析)可靠性分析方法,依據大亞灣核電pra事件樹分析的結果,建立了以緊急停堆失效和專設安全設施驅動失效為頂事件的故障樹,利用risk - spectrum程序,對所建的故障樹進行定量分析,計算,得到系統故障樹的失效概率和割集,從而為大亞灣核電可視化風險分析軟體提供數據支持。
  6. Regarding how to design the valve structure, material choosing, design methods, for instance, how to design the pressure - releasing valve, and how to design the nozzle of the valve

    旁路閥,高溫高壓閥,減溫減壓閥,調節閥,流量閥等結構,材料,設計方法。如減壓閥的設計,噴嘴的設計。
  7. Then the paper uses the same typical four network operating conditions as the primary given conditions and when adding one set of the parallel capacitor bank, changing the 330 / 220kv transformer tap changer position step by step to change the transformer ration, through this study methods this paper found out all the optimized combination of the tap changer position and the amount of input reactive power, also obtained four sets of the 330kv, 220kv and hokv s / s bus voltage and the active and reactive power losses changing curves. through analyzing the optimized combination control curve and the network power flow, the paper generalizes the rules as following : the chief measure of coordinative control is inputting shunt reactor in chengxian s / s in winter time both in the planning year of 2010 & 2005 ; in summer time in planning year of 2010 the chief measure is to input proper shunt capacitor

    本研究通過分析所獲得的優綜合控制組合曲線及電網潮流,總結出了如下規則:隴南電網在2005年及2010年冬大、以及2005年夏運行方式下,綜合控制應以成縣變投入適量並聯補償電抗器作為主要措施;在2010年夏運行方式下則投入適量並聯補償電容器作為主要措施,再輔助以選擇合適的主變有載調壓分接頭來調節,達到控制網內無功潮流分佈合理、各變電母線電壓在理想的范圍內時電網有功損耗,從而也提高了電網安全運行水平及供電質量。
  8. Finally the localization performance of the new estimator and the ls estimator when one station is raised and the traditional four station three tdoa localization estimator were compared

    比較了採用單升高條件下新定位演算法與二乘定位演算法以及傳統四三時差定位演算法的定位性能。
  9. Since the suggested method makes a significant improvement in wind speed, it is more suitable for wind field estimation over complex terrain than other methods which only concerns the effect of distance. then we calculate the wind change with evaluation, last we can conclude the wind abase the hilly terrain, we find the wind in westward and center plain is much smaller than other area. while the wind in northward hilly area is much bigger with the hilly arising. the wind of chongqing is the biggest period in spring ( april ), the smallest period in winter ( january ), the wind in summer ( july ) is bigger than its in autumn ( october )

    本文利用重慶及其周邊地區的常規氣象的1951 ? 1980年30年的風速平均資料,針對復雜地形風速診斷,以地理信息系統為數據處理平臺,根據重慶1 : 25萬dem數據,來獲得重慶市實際復雜地形的高程,提出了一種適合於起伏地形的權重內插方法,通過引入一個表示地形起伏變化程度的因子,構造了一種新的權重函數,來處理復雜地形上的風速,通過與只考慮距因素同反平內插方法比較發現,本方法更適合在起伏地形條件下使用;然後根據經驗公式在地形上進行計算,得出重慶地區起伏地形下的風速分佈;得出重慶市的西部、中部平原地帶風速較,而北部山區隨海拔高度升高風速也較大;重慶市風速大時期為四月份,冬季一月份,夏季(七月份)大於秋季(十月份) 。
  10. When the paper uses the optimization regulation, it divides the management time into " t " stages according to ten days to make up the decision having many stages of the reservoir ' s optimization regulation, and it takes the reservoir ' s retain quantity of water or retain status of water and confiscated quantity of water a s condition variable, takes the water quantity of drawing off or quantity of electricity as decision variable. when the confiscated quantity of water can be known or be forecasted in every stage during the period of management, that is to say the confiscated water process can adopt the determined process, we can make up determine dynamic plan model with many stages and take the minimal lacking water as objective function

    在動態規劃方法中把水庫的整個調度期,按句劃分為t個時段,以水庫的蓄水量s或蓄水位z和入庫水量q作為狀態變量,以水庫放水量q或電出力n或發電量e作為決策變量,構成一個多階段決策過程,當計劃調度期內各時段的入庫徑流量已知或可以預報,即入庫徑流過程可以採用確定性徑流過程時,分別按缺水量d作為目標函數建立多階段確定性動態規劃數學模型。
  11. These results will help to revise the schedule of on - the - spot calibration of aws, and reduce the influence of calibration operation on aws observation

    據此合理安排自動現場校準時各氣象要素的校準時間和次序,可使校準工作對自動數據的影響降到
  12. Using minimum water supply cost as objective function, the secondary series of optimal dispatch model was set up. the optimal combination of fixed - speed pump and the optimal range of rate and flow in varied - speed pump station were elaborated. applying these methods for water supply system in yuci city, the result show it can save energy, which illustrate this optimal dispatch model was successful

    以供水費用為目標函數,建立了給水系統的一級優化調度和二級優化調度的宏觀模型;詳細闡述了泵中只有恆速泵時恆速泵的優組合方法,含有調速泵時,給出了確定調速泵佳臺數、佳調速范圍和調流范圍的計算方法。
  13. This happy picture is tsem tulku rinpoche with his guru, the drigung kagyu mahasiddha jetsun lobsang chozin drigung rinpoche left to right standing : kandro kunsang eldest daughter, the current consort of his holiness trijang rinpoche in the usa, venerable ayang drupchen rinpoche, tsem tulku rinpoche, holy mother consort of drigung rinpoche gangchen dolma - lak, and youngest daughter dolma hlamo in nataraj hotel, hubli

    由左至右立:堪洛坤桑大女兒,她是美國赤江仁波切的現任妻子阿揚圖謙仁波切兒子,詹杜固仁波切,哲貢仁波切的妻子佛母網謙朵瑪拉,及的女兒朵瑪哈默,攝于戶伯利的納達拉酒店tashi caduff攝
  14. An operation decision method for multi - stage pumping station system with adjustable - blade propeller pump is presented. it includes optimal water level of individual stage of pumping station and optimal operation method of every pump. the paper describes some mathematical models and decision making technique of multi - stage pumping station

    本文針對大型引水工程整個系統在進入穩態運行后,在各的抽水流量或首級進口水位發生變化的情況下及時做出運行決策,調整各梯級間的水位,達到整個系統總能耗的目的。
  15. Because the supply water system is large - scale, the pump stations are many, the ways of supply water are complicated, and the adjustable spare is large, the whole data in the optimization of supply water, the flux and its variety regulations in the control stations ca n ' t be acquired. the paper predicts supply water during the process based on the theory of artificial neural network control. the optimization has two steps

    在實際供水系統中很難準確地獲取整個管網的所有基礎數據,主要難以預知所有節點的逐時流量及其變化規律,因此成為供水系統的優化調度的難點,本文採用人工神經網路對供水量進行預測,應用二級優化調度,第一級以整個供水系統的費用為目標,用回歸方法求出各供水節點的供水量;第二級利用流量跟蹤的方法對每個供水節點(泵)實現優化運行,以期在泵內達到大節能目的。
  16. According to deeply studying on common information model ( cim ), the article summarized the idea and method of cim, and put forward a set of easy data model named cim _ lanzhou, which is apt to be experimented. the minimal realization is realized by the way of rup. then the article finished the experiment of leading - in

    通過深入研究cim模型,總結cim模型的建模思想和方法,提出了一套簡單的,易於實驗的數據模型cim _ lanzhou ,並通過採用統一軟體開發過程實現了電網故障信息主系統的構架基線? ?完成了系統實現,即數據導入功能、數據查詢功能和網上瀏覽功能,並對基於cim _ lanzhou的xml文件進行了導入實驗。
  17. In so doing, we have taken into consideration the queries from sph on the engineering aspects of criii, mainly the concerns on whether the extent of reclamation is the minimum, whether the size and number of the cwps can be minimized and whether the stations can be located elsewhere so as to reduce reclamation

    為此,我們研究過保護海港協會對中區填海第三期工程工程事宜提出的質疑。這些質疑主要包括填海范圍是否冷卻用水抽水的規模和數目可否盡量減少,以及抽水可否重置於其他地方以縮減填海范圍。
  18. First, suppose a source point and a sink point. second, draw a unilateral line from source point to every substation node. the line ' s capacity is set as corresponding substation ' s allowable load value and the line cost is set as the substation ' s unit load cost

    本文通過線性化處理后將網架優化模型描述為一個費用大流問題,虛擬一個源點和一個匯點,從源點到各變電節點各引一條單向弧,弧容量為變電允許的負荷值,弧費用為變電單位負荷的費用。
  19. Site navigation classes run under minimal trust

    點導航類在的信任級別下運行。
  20. Displays a set of text or image hyperlinks that enable users to more easily navigate a web site, while taking up a minimal amount of page space

    顯示一組文本或圖像超鏈接,使用戶能夠以更簡易的方式對網進行定位,同時佔用量的頁空間。
分享友人