最小費用 的英文怎麼說

中文拼音 [zuìxiǎoyòng]
最小費用 英文
least expensive approach
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ形容詞1 (體積、面積、數量、強度等不大) small; little; petty; minor 2 (年紀小的; 年幼的) youn...
  • : Ⅰ名詞1 (費用) fee; expense; expenditure; dues; charge 2 (姓氏) a surname Ⅱ動詞(花費; 耗費) ...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • 費用 : cost; expenses; outlay
  1. Although the large scale aeroboat stopped flying, it is replaced and developed by another new ones with advantages taken and shortages avoided, it fit more the domestic demands, reducing the flying cost, simplify the maintenance programm, minimizing the taking off field, using the modenized the remote control technology, the most newest advertising media created, it is

    它取載人飛艇之長,避載人艇之短,就國情的現狀和國內廣告業的行情,量體裁衣,降低飛行,簡化維護工序,縮飛行場地,運現代化的遙控技術,製造出了新穎的廣告載體,它就是高科技與現代廣告的完美結合大型戶外廣告遙控飛艇。
  2. Considering that the enterprise cannot research the " customer - enterprise " value deeply, on the basis of that, the paper puts forward evaluating system of customer value in the enterprise according to value contribution, applies ahp to analyze weight of the indexes in consultation with marketing management and selling personnel of the enterprise and relevant experts and then exert clustering analysis and sas software to classify the customers according to the current value and potential value, provide the strategies of the customer classification management. in addition, any resource is exiguity, including economical resource. this paper defines economical resource, puts forward the model of optimum distributing resource and utilizes the method of linear regress equation to get result, which to grope for a new method about calculating marketing expenditure

    本文首先界定了客戶和客戶價值的含義,同時闡述了關系營銷中客戶價值的理論以及客戶價值的影響因素,針對目前「客戶?企業」價值的研究還不成熟的研究現狀,以及現實中還沒有定量分析客戶價值大的方法,本文提出了一套具有可操作性的客戶價值評價的指標體系,對客戶可以進行比較全面的、多角度的評價,同時採ahp法對這個評價體系中的各指標因子賦以合理的權重,然後運聚類分析法和sas統計軟體對客戶群進行了科學地細分,在此基礎上幫助企業制定出不同細分客戶群組的營銷策略;除此之外,考慮到目前企業對于營銷資源的合理分配問題還沒有進行過深入地討論,本著企業經營的根本目的是盈利的原則,論文結合經濟學原理以及計量經濟學中的多元線性回歸分析提出了實現利潤大化的營銷資源配置的優化模型,旨在探索一種銷售優配置的方法。
  3. Delay - constrained least - cost routing algorithm

    時延約束的最小費用路由選擇演算法
  4. The delay and delay variation constrained minimum steiner tree problem is also researched. lcdvma ( low - cost delay variation - constrained multicast algorithm ) is proposed for this problem. low time complexity, low cost and constrained delay and low delay variation are achieved by only comparing minimum delay paths and minimum cost paths

    對于時延和時延差約束的steiner樹問題,提出了一種基於時延路徑和最小費用路徑的演算法?一lcdvma演算法,由於該演算法比較了通過中轉節點后的路徑和短時延路徑,降低了運算復雜度,通過模擬得到了較的網路和時延差,因此lcdvma演算法是一種具有低復雜度的時延和時延差約束的steiner樹的啟發式演算法。
  5. In this paper, an optimization design cad system of detached foundation of transmitting electricity iron tower has been studied. the system uses an easy and efficient method named grid search to find out the minimum cost of an detached foundation. at the same time, the depth and width of foundation, the width of column, the thickness of foundation plan have been ascertained

    本論文研究開發的輸電鐵塔獨立基礎優化設計cad系統,以最小費用為目標,採簡單、有效、易於編程的有約束非線性規劃方法? ?網格搜索法,對輸電鐵塔獨立基礎進行優化設計,確定出基礎埋深、基柱寬度、底板寬度、底板厚度等合理截面尺寸,並開發出計算、出圖一體化的優化設計計算機輔助設計系統。
  6. In this paper , a novel fuzzy optimization model and algorithm to optimize the locations , sizes and service areas of mv / lv distribution transformers in urban distribution network planning which can consider the imprecision and possibility of spatial load, the voltage level constraints and the cost of objective function is presented

    給出了考慮負荷、供電電壓水平約束和目標函數最小費用的不精細性的城市電網中壓配電變壓器位置、容量和供電范圍的模糊優化規劃模型及演算法。
  7. This chapter primarily includes several aspects of optimization : the cost relating to the leasing period, the prevention maintenance cycle under minimum expenses and so on

    本章主要包括租賃成本及租期優化以及最小費用下設備預防維修周期優化等幾個方面內容。
  8. This dissertation is faced to the process of steel rolling to found network of manufacture material flow, basing on it founding guide line evaluation system of the cost of unit standard producing working procedure, guide line evaluation system of the quality cost of unit standard producing working procedure and guide line evaluation system of performance and efficiency ; and base on the cost data of all kinds of material flows, manufacture flow, flux data, manpower, energy consume, material consume, capital asserts occupied, fund occupied, and the production in working procedure, throughput of the materials in working procedures in the flow and countercurrent flow in the network of material flow of recorded in working procedure producing, using the “ whole closed down lane ” model to describe network of manufacture material flow of steel rolling, found the cost analyzing model system of the network faced to producing process. make the cost increasing of the producing by abnormity material flow in working procedure, and even the cost increasing of the producing procedure as the cost of the management behavior of working procedure fallen under cost evaluation guideline in responsible working procedure, so as to ration measure the factors fast correlated with management behavior by measuring the cost

    在企業管理信息化輔助工具所建立的數據平臺基礎上,建立了以基準物流圖模型為基礎的軋鋼生產主流程物流網路拓撲圖,根據圖論的理論求解大流量和最小費用;計算每個生產節點的加工成本,分離質量成本,克服了單純財務數據進行成本核算所帶來的缺陷;建立了軋鋼生產主流程工序含鐵物料吞吐能力基準圖模型,並根據此模型建立了軋鋼生產主流程工序激勵物流協調性和匹配性、工序響應物流協調性和匹配性分析的過程能力指數計算方法;通過引入決策單元綜合投入與綜合產出效率優原則的模型和基於投入不變、分析產出是否有效或基於產出不變、分析投入是否有效的模型,實現了對多個績效指標在不同績效值集合之間的相對比較,並可根據投入產出效率準則、或者投入(產出)有效性準則進行排序。
  9. First, suppose a source point and a sink point. second, draw a unilateral line from source point to every substation node. the line ' s capacity is set as corresponding substation ' s allowable load value and the line cost is set as the substation ' s unit load cost

    本文通過線性化處理后將網架優化模型描述為一個最小費用大流問題,虛擬一個源點和一個匯點,從源點到各變電站節點各引一條單向弧,弧容量為變電站允許的負荷值,弧為變電站單位負荷的
  10. Then after introducing the grammar rule of lk _ yy language, we introduce the data structure and algorithm to implement them in details. among them, we first introduce the realization of basic language, then put emphasis on the translation of simple model object and the implementation of the two other basic features, inheritance and method overriding. last, making use of lk _ yy, we solve the maximum cost minimum flow problem in traffic program of gis

    首先指出了lk _ yy解釋系統是採面向對象的系統分析與設計方法來實現的;然後在介紹lk _ yy語言語法規則的基礎上詳細介紹了實現它所需的數據結構和演算法描述,其中先介紹lk _ yy語言中基本語言的實現,然後重點講述了簡單模型對象的翻譯以及對象的兩個基本特徵繼承性和方法覆蓋的實現;後利lk _ yy解決了實際gis系統中交通規劃的最小費用大流問題。
  11. An application on minimum cost and maximum flow model to flight connecting problem in single hub and spoke network

    最小費用大流模型在航班銜接問題中的應
  12. In the system, dss integrates relative kb together, especially the train routing kb, approval experience kb. at the same time, the paper constructs the relative model of the claimed train approval optimization model in railroad bureau and uses the minimal cost and maximal flow algorithm based on queueing theory to solve the problem

    在本系統中, dss中集成了相關的知識庫系統,特別是車流徑路知識庫、審批經驗知識庫。同時,對鐵路請求車審批優化中的請求車審批優化問題建立了相應的模型,並利基於排隊論的最小費用大流求解了該問題。
  13. Abstract : this paper studies the minimum cost problems on a class of impulse control model, with a certain conditions, it gives an explicit value which is the minimum of the cost function

    文摘:本文研究了一類脈沖控制模型的最小費用問題,在一定條件下,給出了相應的函數具體解析式
  14. Fuzzy single machine scheduling problem with mixed precedence constraints and fuzzy due dates

    基於圖論的帶模糊約束最小費用時間問題
  15. After introduced the traditionary methods, we apply the shapley theory of n - person cooperation game theory to discuss the solution problems. base on the minimum cost - remaining savings and core, translate the cooperative strategy into game quadratic programming and the interactive multiobjective is put forward. finally, all of the three methods are studied by giving an example of shui bu ya hydraulic projection and make sure the result more justice and rational than the traditionary methods

    論文重點引入了合作對策理論,將多人合作對策理論於投資分攤,分析建立了在多人合作對策基礎上的shapley值法的投資分攤方法,並從多目標規劃的理想點出發,吸收核心法和最小費用法的特點把多人合作對策問題轉化成一個二次規劃問題,在此基礎上,探討和研究了基於合作對策的互動式多目標方法。
  16. Improvement and application of the minimum cost flow algorithm

    最小費用路演算法的改進及其應
  17. The flow network is mainly studied in the network flow problem and it calls for the determination of the maximum flow or the minimum cost flow of the flow network

    網路流問題主要以流網路為研究對象,要求求出流網路中的大流或最小費用流。
  18. Last, use the minimum cost and maximum flow method in graph theory to solve the problem. the result got is relativel y accurate and the solving process is quite fast and simple

    問題求解利網路流中的最小費用大流演算法,既保證了必要的精度,又使得問題求解快速、簡單。
  19. We described the distribution network flow and get an algorithm of minimum cost flow about a special distribution network flow problem by extending the network simplex method

    對分配網路流做了介紹,通過將網路單純形演算法加以推廣,得到了一類特殊分配網路流的最小費用流的一種演算法。
  20. Finally this thesis constructed a model which included three objects and offered the solution, first using the minimum cost and maximum flow gained some scheme, then using fuzzy multiobjective lattice - order decision chose the best scheme

    最小費用大流演算法得到若干方案,後採模糊多目標格序決策進行方案優選。
分享友人