有豎框的 的英文怎麼說

中文拼音 [yǒushùkuàngde]
有豎框的 英文
mullioned
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : Ⅰ形容詞(跟地面垂直的; 從上到下的) vertical; upright; perpendicular Ⅱ動詞(使物體跟地面垂直) se...
  • : 框名詞(框架; 框子) frame; case
  • : 4次方是 The fourth power of 2 is direction
  1. The papers whose research object is the 7 - floor frame - structure with isolator - seismic layer, in which the isolator - seismic layer adopt some standard interlayer rubber isolator. by establish a 3 - dimension finite - element modal and use the a nalysis soft - ansys, we can make dynamic analysis on the structure. by analyses we can get some response characteristics of the structure sparked by the normal and rarely earthquake of 8 - degree fortify intensity, by the double - horizons seismic and by the vertical seismic

    本論文設計了一7層隔震層架結構並以此為研究對象,其中隔震層採用標準件夾層橡膠隔震墊,通過建立三維限元分析模型,運用大型限元分析軟體? ansys對結構進行動力響應彈塑性時程分析,得出了結構在8度設防烈度下常遇水平地震和罕遇水平地震激勵下響應特性、在雙向水平地震波激勵下結構響應特性和在向地震波激勵下結構響應特性。
  2. Then, analyze and compare the elastic time - history analysis of the frame structures subjected to various vertical seismic waves considering different vertical stiffness matrix, thus the vertical stiffness matrix which was proposed by this paper has certain rationality, it is valuable to engineering designing

    然後,分析對比在不同向剛度矩陣下架結構在不同向地震波作用下彈性時程分析,從而表明:本文提出計算向剛度矩陣具一定合理性,並對向地震作用下架結構抗震性能進行分析,對工程設計一定參考價值。
  3. Based on practical project of inspecting, appraising and reinforcing a main heavy factory building, especially its steel crane girder system, of the second steel mill belonging to taiyuan steel & iron corporation, whose technology renovation leads to increase tonnage of many heavy cranes and vertical load of frame - bent structure, first the structure and its members were investigated, inspected, calculated and analyzed, and their reliability was appraised respectively and the strengthening projects or the measures to remedy were given. then, in accordance with the requirement to strengthen the girders under non - stop production, the feasibility of strengthening the crane girders by adding steel diagonal braces underneath the existing girders has been studied by inspecting and evaluating the strengthening effect of the crane girders and comparing with other reinforcing scheme

    本文結合太鋼(集團)限公司第二煉鋼廠主廠房由於生產工藝改造要求,加大多臺重型吊車噸位及bc跨( 1 ) ( 8 )軸線排架各層向(設備)荷載后,對廠房結構,尤其鋼吊車梁系統進行檢測鑒定與加固設計實際工程,首先對廠房結構進行了現場調研、技術檢查、測試以及內力和承載能力計算與分析(考慮抗震) ,並根據檢測、計算與分析結果,對廠房結構、構件可靠性進行了評定,並綜合提出鑒定結論和加固處理建議。
  4. Though much progress has been achieved in previous study, there still remains a lot to be studied and perfected. the thesis is devoted to study on the multi - ribbed slab wall, the main bearing member in mrss, including its mechanism, failure mode, aseismic capability, mechanical models, ultimate bearing capacity and aseismic design based on control. the paper mainly accomplished such work as follows : 1 ) based on test research on multi - ribbed slab wall, the paper proposed the member ' s failure modes under horizontal loads, analyzed the co - performance between the inner frame and the infilled silica bricks and that between the slab and the outer frame, discussed the wall ' s bearing capacity, rigidity, deformation, ductility and energy dissipation ability in different modes, and put forward a simplified mechanical model of the slab wall under vertical loads

    本文針對密肋壁板結構主要受力構件? ?密肋復合墻體為研究對象,就其受力機理、破壞模式、抗震性能、三階段力學模型、極限承載能力以及基於控制抗震設計方法等進行了較為詳細研究,完成主要工作: 1 )通過對密肋復合墻體在水平低周反復荷載和單調荷載作用下試驗研究,提出了墻體主要破壞模式;分析了格與內部填充砌塊、墻板與外共同工作受力特點;探討了不同破壞模式情況下墻體承載能力、剛度、變形、延性、耗能等抗震性能,並給出了向荷載作用下密肋復合墻體簡化力學模型。
  5. The characteristics of longitudinal and lateral frame columns are different from general frame columns, due to the high depth - to - width ratio of cross - sections and withstanding large vertical loads. the axial compressive ratio is a very important factor in columns design

    縱、橫向架柱具與一般架柱不同特點,如柱截面高寬比較大,且承受很大向荷載,其軸壓比設計問題是柱設計一個非常重要因素。
  6. The carpentry team built seven frames of equal size to support the large background painting that would be placed on the stage. several fellow practitioners then secured canvas fabric over each of the frames, which stood nine meters high, due to the enormous size of the lecture venue formosa s largest indoor stadium. the sections were then carried by five brothers from the basement of the taoyuan center to an empty lot in front of the kitchen, where they were erected and placed together for painting

    由於師父講經會場非常寬廣,光是講經臺背景布幕就九公尺高,所以先由木工同修將架釘好,再由數位同修負責裱好胚布,這些工作都在中心地下室進行,裱好畫布須由四五位大漢從地下室以人力搬運至中心廚房前空地,以便將畫布立起來作畫。
  7. From this paper ' s study, it had been identified that the pushover analysis method was reliable in scope below : ( a ) low - middle rise, regular, the first model deformable structures, ( b ) short - period structures, ( c ) middle - rise non - symmetric frame structures, ( d ) middle - rise vertical - irregular frame structures, ( e ) middle - rise base - isolated structures, etc. it had also been identified that the time history analysis method could be replaced by the pushover analysis method when the pushover analysis method was reliable

    通過本文研究,證明了pushover法在如下結構中應用具足夠準確性:中低層、規則、以第一振型為主要變形特徵結構,短周期結構,多層不對稱架結構,多層向不規則架結構,多層基礎隔震結構。同時證明了在pushover法適用范圍內,可以應用簡單pushover法代替復雜非線性動力時程分析法對結構進行抗震性能評估。
  8. Then limiting load is decreased. ( 6 ) horizontal load can increase the coefficients of the modulation of moment when value of is little while decrease it when is large

    ( 6 )在中支座截面相對受壓區高度較小時,水平荷載架其彎矩調幅系數要大於只向荷載架。
  9. For the comprehensive cognition to the prestressed concrete frame, four monolayer and monospan frames is built, two of which are loaded only vertically and the other two are loaded vertically and horizontally at the same time

    為了對預應力受力性能一個全面深刻認識,重慶建築大學又製作了四榀接近足尺單層單跨預應力架,並對其中兩榀同時施加水平荷載和向荷載進行了試驗研究。
  10. Based on the experimental study of two presstressed frames, it analyses the question of redistribution of internal force and analyses influence of moment modulation of prestressed frames. therefore, it draws some conclusion as follow : 1 ) post - tensioned prestressed frames can be practiced on moment modulation. but how to operate decides on practical situation in design

    本文通過對兩榀近於足尺后張粘結預應力架在跨間向荷載作用下試驗研究,探討了預應力架內力重分佈問題,從塑性內力重分佈入手分析了次彎矩對架彎矩調幅影響以及影響內力重分佈其他主要因素,得到一些概念性認識和結論: ( 1 )對后張粘結預應力架可進行適當調幅。
  11. The floor of the high - rise frame structures is very suppleness when the frame structures subjected to the vertical seismic actions, it is impossible to confirm that each member has the same displacement in the same floor, so it is impossible that the summation of axes stiffness of each vertical member represent the global vertical stiffness of the frame structure

    高層建築架結構在向地震作用下,樓板在向剛度是很小,一般不予考慮,認為相對無限柔性,而梁剛度也是,不可能保證各向構件在同一樓層向位移相同,因此不能簡單地用各向構件軸向剛度之和來代表結構向剛度。
  12. At the same time it has the shortcoming of complex mechanics analysis. in this thesis we mainly discuss the structure behaviors of the mega structure. firstly considering the differences between mega - frame and normal - frame, that is the influence of rigid zone and shearing type deformation are considered. a computer program for calculation of mega - frame structures based on element stiffness matrix to members with rigid zone considering shearing type deformation has been written and some of mega - frames have been calculated by using the program

    首先,根據巨型架與普通主要區別,採用帶剛域桿件考慮剪切變形時桿單元模型,利用fortran語言編制了巨型架結構線彈性限元靜力分析程序,並利用該程序對多個巨型架結構進行了計算,分析了巨型架結構靜力性能,深入研究了結構在向荷載和水平荷載作用下傳力機理、力學特性和變形特點。
  13. At first, this thesis analyzes the main causes in theory, which have effects on the redistribution of internal force and modulation of moment for the bonded post - tensioned partially prestressed concrete frame ( for short prestressed frame ), including the relative height of compressive zone of section ( ), secondary moment and types of load applying. then, this thesis analyzes the test of prestressed frame. then, a method, called curvature - force method, for nonlinear analysis of prestressed frame is put forward

    本文首先從理論上分析了影響后張粘結部分預應力混凝土架(簡稱為預應力架)內力重分佈和彎矩調幅主要因素,即相對受壓區高度、次彎矩和加載方式等,並初步分析了兩榀只加向荷載和兩榀既加向荷載又加水平荷載單層單跨預應力架靜力加載試驗。
  14. The stiffness of weak - layer frame structures is not uniform in vertical direction, and there will be severe layer - deformation in weak layer when earthquake occurs

    薄弱層架結構剛度沿分佈不均勻。在地震中薄弱層將產生較大層間變形,從而發生嚴重震害。
  15. The paper also compared fsmrcwb with frame - supported masonry wall beam ( fsmwb ). secondly, by means of finite element method ( fem ), the paper studied stress distribution in fsmrcwb under vertical loads and under elastic earthquake force with constant vertical loads respectively

    其次,進行了支密肋復合墻梁線彈性限元分析,主要研究支密肋復合墻梁在向荷載作用下應力分佈,以及在向荷載與小震水平地震力共同作用下應力分佈,並就試驗結果與限元分析結果進行對比分析。
  16. In this article the development of the cracks and the moment redistribution are discussed based on the two frames which are loaded vertically and horizontally at the same time

    本文針對兩榀同時施加水平荷載和向荷載預應力架,對其加載過程中裂縫發展、結構塑性彎矩重分佈進行了探討和研究。
  17. To date, structure engineers still adopt designing method of frame - shear wall structure rather than considering common action of pier wall and transition beam and the problem of stress - distribution complication arises from here. this paper provides the research object which is a 13 - stories frame supported short pier shear wall structure with different pier strength coefficients and integrity coefficients, focus on stress distribution of two - short - pier shear wall and three - short - pier wall under vertical loads and horizontal loads. it also concludes variational rules of internal force of transition floors in this structure

    本文以具不同整體性系數和肢強系數13層支短肢剪力墻結構為研究對象,運用ansys8 . 1限元分析軟體,研究了雙肢墻、三肢墻和轉換梁等結構構件在向荷載與水平荷載作用下應力分佈特點,總結了帶梁式轉換層短肢剪力墻結構中轉換梁內力隨著墻肢截面高度變化規律,為支短肢剪力墻結構分析和設計提供了理論基礎。
分享友人