有限方程 的英文怎麼說

中文拼音 [yǒuxiànfāngchéng]
有限方程 英文
finite equation
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : Ⅰ名詞(指定的范圍; 限度) limit; bounds Ⅱ動詞(指定范圍, 不許超過) set a limit; limit; restrict
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 有限 : limited; restricted; finite; a little; not much
  1. Also, this paper studies the amendable methods of dynamic numeration model, and bring forward that optimized method can revise finite element model, while validating the construed results of structural mode is almost equal to true values

    本文研究了各種動力計算模型的修正法,針對序,提出了用優化的法實現結構動力元模型的修改,通過算例驗證,結構模態分析結果更接近於實測值。
  2. The paper is based on an arcuated built - up system bridge - zhongshan no. one bridge to be built in guangzhou, adopts the large universal finite element programme ansys, takes spatial action among members into account, establishes a three - dimension finite element model, and discusses the following several aspects : firstly, when three - dimensional finite model of a complicated bridge is founded, a beam - lattice method is a kind of applied and effective spatial analysis method, which is used to analyze superstructures of a bridge

    本文以廣州市中山一橋為背景,採用大型通用序ansys ,考慮構件間的空間相互作用,建立了三維的元模型,重點對以下幾個面進行深入探討:首先,在對復雜的橋梁結構進行三維的元模型建立時,梁格法是分析橋樑上部結構比較實用而且效的空間分析法。
  3. The findings of this thesis reflect that the object - oriented method is an effective means used in developing finite element analysis software, compared with traditional method it possesses the advantages of being more structured, easy to be compiled, maintained and extended and the program code can be much more reused. the oop method not only improve the functions of finite element software but also realize the congruity between the computing model and physical model in the real world, and promote the integrity technique of cad / cae

    本文結果表明,面向對象法是一種強力的工具,採用面向對象法開發大型元分析軟體是一種非常效的法,與傳統的序相比,面向對象序更加結構化、更易於編寫、更易於維護和擴充,序代碼的可重用成分更大,它不僅能提高元軟體的功能,而且能實現數據模型與計算機模型以及現實世界物理模型之間的一致性,便太原理工大學碩士學位論文cad / cae系統的集成。
  4. Based on the generalized variational principle of the modificatory variables and substituent shearing strain field interpolation of the bending theory of the mindilin plate, this paper brings up the nine - node mixed plate bending element and adopts the sap2000 ? a large - scale finite element analysis programs. by the examples, we find the precision of the method is satisfying

    在對轉換層厚板進行局部元分析時,本文提出了基於mindlin中厚板彎曲理論的修正的二類變量廣義變分原理和替代剪應變場插值法的九節點厚薄板通用的板彎曲單元,並採用了sap2000序。
  5. In light of the elastic thin plate theory, the author induced equilibrium differential equation of bi - direction cellular slab, which was proved correct through analysis and comparison to result of ansys to with theoretical calculation. through the deflection and bending moment coefficient calculation of bi - direction cellular slab under various boundary conditions, the author brought forward the theory that the deflection of mid - span and bending moment coefficient calculation of mid - span and support of bi - direction cellular slab could be in accordance with solid plates ", which could satisfy the precision of engineering

    本文根據彈性薄板理論,導出了雙向空腹板的平衡微分,並通過理論計算和通用序ansys結果對比,驗證了其正確性;通過對各類邊界條件下雙向空腹板撓度和彎矩系數的計算比較,本文提出:雙向空腹板跨中撓度及跨中、支座彎矩可使用本文空腹板剛度公式查找現的實心板撓度彎矩系數表進行計算,完全能滿足工精度要求。
  6. By emptying the above mentioned theoris and conclusions, this paper introduces detailedly the whole process of the compare and selection of cangzhou city gongrong road canal bridge ' s plan, design calculation and check of structure. the internal force calculation of the bridge adopts the program of plane member system ( bricas ), and it was checked by the program of brcad

    本文最後應用上述理論和結論,以大量篇幅詳細介紹了滄州市光榮路運河橋(下承式鋼管混凝土系桿拱橋)從案比選到結構設計和計算、驗算的全部過,以及施工中的要點,本橋內力計算採用平面桿系元計算序, (交通部公規院的《橋梁設計綜合計算序》 ( bricas4 . 0 ) ) ,並採用空間序( brcad2 . 0 )進行驗算。
  7. This result has practical significance. in this paper ' s theoretical section, base on current shrinkage and creep calculational methods, analysis to the experiment project and tall building structure examples were made, and then the influence of shrinkage and creep to structure stress was put into discussion ; moreover, an fea program was compi led to calculate shrinkage and creep strain considering construction process, and through a tall building instance, the influence to tall frame structure stress was analyzed

    本文的理論部分在現收縮徐變計算法的基礎上對本試驗工和高層建築結構進行了算例分析,通過與彈性計算值的對比,討論了收縮徐變對結構內力的影響,以及計算收縮徐變時是否考慮鋼筋和施工過對結果的影響;本文還編制了考慮施工過收縮徐變的序,並進行了算例分析。
  8. Based on the fem program on fracture of plane structure developed by professor fu xiaoling of ho hai university, a two demension damage and fracture finite program package which is programed in fortran 90 language is developed. the paper adopts the plane - eight - nodes isoparameters element and compute the developing law of the damage and macro - damage of plane structure under load. considering the original damage and tension and compression damage at the same time, the paper adopts the more reasonable concrete constitute relation of two demension and exponent function model

    在河海大學符曉陵副教授所編制的平面結構斷裂序( dl08p4 )基礎之上,本文用fortran90語言編制的二維損傷-斷裂序包,序採用平面八結點等參數單元分析計算平面結構在外荷載作用下損傷及宏觀裂縫的發展規律,考慮了混凝土結構體內存在著初始損傷和同時存在的拉、壓損傷,並且採用更為合理的具損傷含義的混凝土二維本構關系(即正交異性損傷模型中的本構)和指數函數模型建立的並可進行拉、壓損傷可比性換算的損傷演變,較為真實地反映了實際情況。
  9. Considering the diffuseness of the n - n scattering in the forward direction results in an increased reaction cross section. and also the angular distributions calculated in the glauber theory including these two corrections are in good agreement with the experiment data. in the investigation of the halo nucleus reaction with a loosely bound structure, one has to consider the strong spatial correlations among its constituents

    考慮了低動量轉移的核子?核子兩體散射在朝前向上的彌散,使計算得到的反應截面增大,而且我們從彈性角分佈的分析中得到考慮了修正的效應無論是在峰的位置還是角分佈的絕對值都能更好地符合實驗。
  10. In the computer simulation, the finite element program ls - dyna was used to simulate six operating modes of experiment

    在計算機模擬面,利用大型序ls - dyna對實驗中的六種工況分別進行了數值模擬。
  11. In this paper, the high - temperature low - cycle fatigue life and fatigue crack propagation life tests are carried on the cylindrical axial symmetry specimens having precrack or non - precrack with different types of notches of 16mnr steel in common use in the petrochemical industry contacting coke drum equipment, the stress / strain and the range of stress / strain of dangerous points are received through stress analysis of the specimens using finite element program under multi - axial stress state. at last, the equations of evaluating the high - temperature low - cycle fatigue life and the fatigue crack propagation life are found through using the least - square regression method

    本文採用無預裂紋和帶預裂紋環狀缺口圓柱形試樣,進行了石化焦炭塔設備常用材料16mnr多維應力狀態下不同缺口形式的高溫低周疲勞總壽命試驗及裂紋擴展壽命試驗,並利用序對試樣缺口周圍及裂紋尖端附近進行了軸對稱多維應力狀態下的應力、應變場分析,來評價材料不同條件下的高溫低周疲勞總壽命和裂紋擴展壽命,最後利用最小二乘回歸法,得到了該材料高溫低周疲勞總壽命和裂紋擴展壽命評價
  12. Finally, through the empirical datum union with the simulation datum, obtains the ballistic limit equation with the method of multiple linear regressions, and to the fitted equation carries linear relations significance test

    最後,通過已的實驗數據結合數值模擬得到的數據,用多元線性回歸的法得到擬合的撞擊極,並對擬合出的的線性關系進行顯著性檢驗。
  13. In virtue of finite element program, this paper calculates the model of rc - masonry combination arch bridge in the stages of construction and use in this paper. based on these data, it analyzes the structure behavior of the reinforced concrete arch ribs and the masonry arch ribs using methods of inner force and stress

    本文藉助序對rc -石砌體組合拱橋的計算模型進行了施工階段和使用階段的計算,並採用應力疊加和內力疊加兩種法對rc拱肋和石砌體拱板的受力特性進行分析。
  14. A deep foundation pit engineering in shanghai is adopted as an example. the factors of design, construction and nature environment on effect of internal force and deformation for a retaining structure are studied in detail through the example. these factors include the rigidity of retaining wall, rigidity and site of support rod, space - time effect of pit excavation, water environment of foundation pit etc. some useful conclusions of controlling deformation of foundation pit are obtained through the study

    以上海某深基坑為工原型,利用序,詳細探討了支護墻剛度、支撐剛度及位置、基坑開挖的時空效應、基坑周圍水環境等設計、施工和自然環境因素對支護結構內力和變形的影響,提出了一些控制基坑變形的法措施,為深基坑工的設計和施工提供了依據。
  15. The construction of the bridge began in oct 1999, and the closing up of the steel tube was in dec 2000. during that period, i learned and analyzed the current construction methods fairly comprehensively, and collected the construction technique data of the cfst arch bridges having been built. based on this, aided by the simulation of construction procedure using finite element program, i proposed the operation program to make the steel tube segment be located at one time, and the scheme of dividing rooms to segment pouring

    大橋於99年10月開工, 2000年12月主橋鋼管合龍,在此期間,本人就目前鋼管混凝土拱橋的施工法進行了較全面的了解和分析,搜集了此類已建橋梁的施工技術資料,在此基礎上,又藉助序對施工過模擬計算的支持,提出了在梅溪河大橋懸臂安裝過中,鋼管節段一次就位的操作序和鋼管混凝土分倉灌築的案,並為施工單位采納應用。
  16. Based on the design load and the whole stability of the link, a better method of reinforcement is obtained in the paper combining with the practice of project, and the validity of this method is verified by adopting the program of finite element

    摘要根據設計荷載,抱桿在滿足整體穩定性的前提下,結合工實踐選擇較好的加固案,並採用序對加固案進行驗算,驗證所採用案的正確性。
  17. The reduction factors derived from curve fitting based on calculation results by the finite element program ( ansys ) considering all kinds of damages such as cutouts, corrosion, cracks, denting, initial deflection and residual stress are introduced to modify the effective width of perfect panel in the present paper

    本文考慮板中可能存在孔洞、腐蝕、裂縫、局部撞損和初始焊接變形或殘余應力等損傷和初始缺陷,對不同的損傷形式用序( ansys )進行大量的計算,通過曲線擬合的法引入折減系數對完好板格的效寬度進行修正。
  18. Use customer call prioritization processes as directed by the national dbu manager to ensure that customers are called in a systematic and cost effective manner, and ensure that effective call objectives exist for each call

    通過全國直接客戶業務經理的指導使用電話拜訪,確保在拜訪所客戶時系統、法的進行,確保每個電話拜訪都具效的拜訪目標。
  19. Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further

    首先,本文在綜合分析隧道穩定性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿錨桿作用力學機理進行了深入研究,為全長粘結式砂漿錨桿的元模擬分析奠定了基礎;其次,針對傳統錨桿元模擬法的局性與不足,在上述全長粘結式砂漿錨桿作用力學機理研究基礎上,建立出能反映界面非線性粘結的新型復合砂漿錨桿單元模型;然後,運用上述復合砂漿錨桿單元模型,引進非線性元分析手段,開發了隧道支護穩定性分析的序,並就全長粘結式砂漿錨桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對隧道支護設計具指導意義的結論;最後,運用本文研究成果對某公路隧道工實例進行了開挖與支護的模擬計算,探討了其應用法,並就隧道變形與應力及塑性區分佈規律進行了分析,從而提出了合理的支護案,為隧道支護設計提供了參考依據,完善了隧道全長粘結式砂漿錨桿支護的理論與法。
  20. The fem method of debonded honeycomb structures is brought forward. a three - dimensional finite element model is constructed and the analysis program is complied to analyse the residual strength of debonded honeycomb structures and discuss the influence of debonded area

    提出了蜂窩夾芯結構脫膠的元分析法,建立含脫膠損傷的復合材料蜂窩夾芯結構的三維元模型,編寫序計算損傷結構的剩餘強度並討論了脫膠區域等對結構剩餘強度的影響; 2
分享友人