未預計的條件 的英文怎麼說

中文拼音 [wèidetiáojiàn]
未預計的條件 英文
off-design condition
  • : Ⅰ副詞1 (沒) did not; have not 2 (不) not Ⅱ名詞1 (地支的第八位) the eighth of the twelve ear...
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ名詞1 (細長的樹枝) twig 2 (條子) slip; strip 3 (分項目的) item; article 4 (層次; 秩序; 條...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 預計 : estimate; calculate in advance; expect
  • 條件 : 1. (客觀的因素) condition; term; factor 2. (提出的要求) requirement; prerequisite; qualification
  1. In summer, load is affectd by meteorological elements greatly. based on multidimension time series approach, the car model is constructed, which could take account into the accumalated influence from temperature and inertia action from historic load, meanwhile, the advantage of the model is that its expreaasion is in the form of apparent function, which could provide us some quaqutive imformation existed between input variable and output variable

    本文以多維時間序列分析方法為基礎,成功地解決了來日負荷與前些日負荷慣性變化影響,以及氣象累效應影響顯性函數關系問題,從而為負荷測人員掌握來負荷與歷史負荷,歷史氣象要素與當日氣象之間規律,提供了量化分析基礎。
  2. Present methods generally based on the statistics of earthquake damage, expert experiences, theory analysis and experimental researches have obvious advantages, disadvantages and certain scopes of application ; ( 2 ) different prediction methods should be adopted against different building conditions, sites, intensity and experiences etc to predict earthquake damage of buildings for prospective accuracy, dependability and availability ; ( 3 ) earthquake damage matrix, which is the foundation of earthquake damage prediction, of 7 kinds of building in the urban areas of zhangzhou city under intensity 6 to 9 has been set up. the damage conditions of different buildings under different intensity are as followings : all kinds of structures are basically intact under intensity 6 ; the reinforced concrete structures are basically intact under intensity 7, but other kinds of structures are destroyed slightly ; the reinforced concrete structures are still basically intact while other kinds of structures are destroyed intermediately under intensity 8 ; the reinforced concrete structures are destroyed slightly, single - story factories and open houses are destroyed intermediately and other kinds of structures are destroyed seriously under intensity 9 ; ( 4 ) the results of earthquake damage predicting of buildings embody the damage when earthquake happens in the future. thus, further identifications and reinforcements should be considered to buildings that will be destroyed intermediately or more under the earthquake with 10 % exceeding probability in future 50 years ; ( 5 ) the direct economic losses caused by damage of buildings resting with the area, structural type, intensity and damage of all kinds of buildings are the main part of the losses of the city in an earthquake ; ( 6 ) the direct economic losses increased progressively toward high intensity by 2 or 3 times

    基於上述研究,得出主要結論有:建築物震害測是一個模糊、系統、復雜問題,現有方法很多一般都是以震害統規律、專家經驗、理論分析和試驗研究為依據,有其自身優缺點和一定適用范圍;應針對不同建築物、場地、地震強度和已有經驗等,採用不同測方法進行建築物震害測,以使測結果達到精確性、可靠性和可操作性;建立了漳州市區7類建築物在6度9度地震作用下震害矩陣,成為指導抗震防災重要依據,各類結構震害情況表現為: 6度地震作用下各類建築物基本完好; 7度地震作用下除鋼筋混凝土結構基本完好外其餘以建築輕微破壞為主; 8度地震作用下鋼筋混凝土結構仍以基本完好為主而其餘建築以中等破壞為主; 9度地震作用下鋼筋混凝土結構以輕微破壞為主,單層工業廠房和空曠房屋以中等破壞為主,其餘建築以嚴重破壞為主;建築物震害測結果體現了來地震來臨時震害程度,在編制漳州市區抗震防災規劃時,對于遭遇50年超越概率10地震影響發生中等以上破壞建築物應考慮進行抗震鑒定和加固;由建築物破壞所造成直接經濟損失是城市地震經濟損失主要部分,重慶大學碩士學位論文中文摘要其主要與建築物總面積、結構類型、地震烈度和各類建築物震害程度有關;不同烈度造成直接經濟損失按2一3倍向高烈度方向遞增,漳州市區直接經濟損失由6度至9度比例關系為1 : 2 . 8 : 8 . 6 : 22 . 8 ;遭遇基本地震設防烈度( 7度)時,漳州市區直接經濟損失約4 . 5億元,無家可歸人員約40000人,且以磚木結構和多層磚混結構震害損失最大;地震造成人員傷亡主要與建築物倒塌及嚴重破壞程度和總面積以及震時建築物室內人數密切相關,地震時無家可歸人員主要與住宅倒塌、嚴重破壞及中等破壞程度和總面積以及城市人均居住面積密切相關。
  3. Each mode has its own peculiarities, at the same time they have certain shared ones : eso is applied not only to listed companies ; eso is no longer a kind of selective right ; the benefit of non - state junior shareholders has n ' t been attached importance in the system design ; eso is punitive ; as to the sources of the stock, keeping stock in advance is n ' t adopted

    但所有這些模式又有一定共性:其適用范圍不僅限於上市公司;股票期權不再是一種選擇權;非國有中小股東利益在制度設受到重視;具有懲罰性;在股票來源上不採用留方式。第四部分為股票期權適用及我們必須直面問題。
  4. Probability method is that we build probability model with bayesian equation, which predicts if reservoir can induce earthquake, with the data of induced earthquake and non - induced earthquake reservoirs, considering such five factors as reservoir depth, capacity, tectonic stress condition, fault activity and media condition in induced earthquake region

    概率分析方法是利用誘震水庫和發震水庫資料,考慮了庫深、庫容、構造應力環境、斷層活動性及誘震區介質5個因素,再利用概率統貝葉斯公式建立了測水庫能否誘震概率模型,最終算出結果。
分享友人