材料試驗室 的英文怎麼說

中文拼音 [cáiliàoshìyànshì]
材料試驗室 英文
material laboratory
  • : 名詞1 (木料) timber 2 (泛指可以直接製成成品的東西; 材料) material 3 (供寫作或參考的資料) ma...
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 材料 : 1. (原料) material 2. (資料) data; material 3. (適于做某種事的人才) makings; stuff
  • 試驗 : trial; experiment; test
  1. The strain 2009 and the pure culture were used as experimental materials to study the relationship between the pregermination methods of auricularia auricula and the emergence rate, the contamination rate and the yield by six methods

    摘要以黑木耳菌株2009作菌株,選用木屑培養基作,在同一黑木耳栽培菌培養採用6種不同的催芽方法,研究了催芽處理方法與耳基分化率、污染率和產量之間的關系。
  2. Maintain all extrusion product documentation in lab including : set up product folder, key in and maintain formulas in bme, issue tds, test report, msds etc

    維護實所有鋁型產品資,包括:建立產品檔案,輸入並維護bme系統配方,提供tds 、測報告、 msds等。
  3. Metallic materials - compression testing at ambient temperature

    金屬溫壓縮方法
  4. According to the urgency and the necessity of reconstructing material mechanics lab, plans and suggestions were put forward in six aspects which consist of reconstructing universal material machine and photo - elastic instrument, rebuilding electrical testing lab, increasing devisable experiments, adding virtual experiments, making exhibit - boards

    摘要鑒于改造力學實的緊迫性和必要性,從改造萬能機、光彈儀和電測實間,增加設計型實項目,增加虛擬實,製作展示板等6個方面,提出了具體方案和建議。
  5. It is expectative because of both its eminent performance and simple construction technology, and its economical preponderance. through the test of the six fibers and three gradations, the asphalt mixture of different combination, this paper analyses the fibers influence on the pavement performance, expatiates the strengthening mechanism of the fiber asphalt concrete pavement with theory of composite material and the interfacial chemistry

    本文通過六種纖維和三種礦級配的瀝青混合大量研究,全面分析了纖維對瀝青混合路用性能的影響,結合復合理論和界面化學知識,較系統的闡述了纖維對瀝青混合路用性能的改善作用機理。
  6. For rotor steel ( 30crlmolv steel ), the tests of low - cycle fatigue property are done under different temperatures. the fatigue life under different temperatures is researched to make up for the defects of the testing for foreign similar materials. when pull - stretch data is attempted to evaluate low - cycle fatigue data, the result shows that four - point associated method in middle - low life zone is done well under room temperature, but there are large errors of four - point associated method and general - slope method under other temperatures

    在本文中,通過與國外同類的性能進行比較,國產與國外共有的特徵基本相同;對轉子鋼( 30crlmolv鋼)進行了不同溫度下的低周疲勞性能實,研究其在不同溫度下疲勞壽命,以彌補國外對同類鋼的不足;採用拉伸數據預測低周疲勞壽命時發現,溫條件下用四點關聯法在中低壽命區預測較好,在高溫條件下四點關聯法和通用斜率法都有較大誤差,需要進行改進。
  7. In the wet lab, the minimum solidification points of freezing point is determined according to astm d1493 - 67

    在濕的實中,冰點的最小團結點被依照美國學會d1493 - 67決定。
  8. At present plenty of experimental study has been made on the materials and structural performance of asphalt concrete cores in the world, and the design methods and construction technique as well as equipments have been more mature. however, there is still lack of the research of its basic performance. in this thesis, in combination with the actual project, the experimental study has been employed with the field core specimen and the specimen made in laboratory, mainly include the static triaxial test, confinement pressure stabilization test and stress relaxation test

    目前,國內外對瀝青混凝土心墻的和結構性能已進行了一些研究,其設計方法、施工工藝和設備較為成熟,但其基本性能研究方面顯得較為薄弱,本文結合實際工程對瀝青混凝土心墻的芯樣和成型的件進行了研究,主要包括靜三軸、圍壓穩定以及應力鬆弛研究,得到以下基本結論: 1
  9. Interlaboratory testing of paint and related materials

    及相關間的
  10. Packaging testing - integral test method for packagings made of films or foils for leakage using a flexible test chamber with tracer gas

    包裝.用有示蹤氣體的撓性對薄膜或箔制
  11. Aerospace series - metallic materials - test methods - tensile testing at ambient temperature

    航天航空系列.金屬.方法.溫下抗拉
  12. Mixture mixing : install and debug the mixing equipment before construction, take the trial mix according to the mixture ratio, and find out the turning on location of every hopper strobe as well as the relation among material flow of every kind, draw up the curve, and if there is adjustment because of factors like material batch, difference of moisture content and so on, it need to be confirmed by the laboratory so as to ensure the mixture ratio of construction meet the design requirement

    混合拌和:施工前首先安裝、調好拌和設備,根據確定的配合比進行拌,找出各斗閘門開啟位置與各種流量的關系,並繪製成曲線,如因批次、含水量不同等因素而調整,須由確定,以確保施工配合比符合設計要求。
  13. With reference to the 3rd jianghan bridge in wuhan, qingganhe river bridge in zigui, hubei and meixihe river bridge in fengjie, this paper describes the design requirements for mix proportioning of pumped concrete for arch bridges of concrete - filled steel pipes, selection of all kinds of materials, compatibility tests and determination of both laboratory and construction mix proportioning

    摘要以武漢江漢三橋、湖北秭歸青干河大橋、奉節梅溪河大橋為例,介紹鋼管拱泵送混凝土配合比的設計要求,各種原的選擇及相容性配合比和施工配合比的確定。
  14. Standard practice for tests of cleanroom materials

    潔凈的標準規程
  15. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的設計製造經,擁有多項專利技術,生產的同步發電機永磁機技術工藝先進,製造精良,能滿足與各式水輪機配套的不同技術條件要求。目前公司已製造投產的發電機容量范圍為0 . 120mw ,具備生產單擊容量50mw的能力,發電機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高電壓達13 . 8kv ,公司製造的甘肅永昌東河水電站34500kw水輪發電機組,海拔為2868 . 5m ,成功解決了高原防暈等難題。公司擁有電機站絕緣材料試驗室等先進的實設施和測手段,使產品從原進產,到成品出產的各項電器性能測均能滿足設計要求。
  16. In this article, through lab and engineering site trials that the physical data of new type pipe materials is corrected, the results are as follow : ( l ) the expansion coefficient of new plastic pipe materials is more large than that of iron pipe. ( 2 ) new plastic pipe materials have different heat - resisting character and according to the water temperature to choose pipe materials ; ( 3 ) the loss of head of water for new type pipe materials is more smaller than iron pipe and also correct the loss of head of water that calculated by theory ; ( 4 ) probing into the press - resistance character of new plastic pipe materials

    本文通過及工程現場,對新型給排水管的幾個重要的物理性能參數進行實測定,糾正了以往的錯誤認識。研究結果表明: ( 1 )新型塑線脹系數遠遠大於鋼管和鑄鐵管,設計和施工中要嚴格考慮管道的伸縮; ( 2 )新型塑耐高溫性能各不相同,需根據管內水溫選定管; ( 3 )新型管水頭損失遠小於鋼管,並對原水頭損失計算公式進行了修正; ( 4 )對于塑的耐壓性能進行了探討。
  17. Metals materials - uniform corrosion - methods of laboratory immersion testing

    金屬均勻腐蝕全浸方法
  18. Flexible cellular polymeric materials - laboratory assessment of horizontal burning characteristics of small specimens subjected to a small flame

    柔性泡沫聚合.受小火焰支配的小樣水平燃燒特性的評估
  19. Standard practice for conducting an interlaboratory test program to determine the precision of test methods for construction materials

    為確定建築方法精確度而實行實程序的標準實施規程
  20. Tests on indoor and outdoor post insulators of ceramic material or glass for systems with nominal voltages greater than 1000 v ; amendment 2

    額定電壓大於1000v的陶瓷或玻璃系統內和外絕緣子.修改件2
分享友人