杯渡路 的英文怎麼說
中文拼音 [bēidùlù]
杯渡路
英文
pui to road-
Tsing lun road, tuen mun, grade separation project
屯門杯渡路架空輕鐵路軌工程The light rail track diversion works were carried out to facilitate the light rail grade separation works at pui to road
輕鐵路軌改道工程是配合杯渡路架空輕鐵路軌工程而進行,以便騰出空間興建輕鐵高架橋。A pedestrian crossing west of pui to stop that had been closed to make way for light rail track diversion works was reopened on 14 june, allowing passengers to travel between platforms on both sides of the tracks
較早前因進行輕鐵路軌改道工程而臨時封閉,位於杯渡站以西的行人過路處已於六月十四日重開,方便乘客來往兩邊月臺。Pui to station, tuen mun lrt
屯門輕便鐵路杯渡站By mid year these works should have been completed west of pui to road
預計至今年中,工程會延伸至杯渡路的西面。The improvement works will include widening at ho pong street and pui to road junction
改善工程也包括擴闊河傍街及杯渡路交接處。Widening of existing roads and junctions at tuen mun heung sze wui road, yan ching street, pui to road and ho pong street
擴闊現時屯門鄉事會路、仁政街、杯渡路及河傍街的路面及交接處。Pui to road, tuen mun, grade separation project the contractor is carrying out piling works east of tuen mun pui to road to divert the existing tracks
承建商現正在杯渡路以東進行工程,主要是樁柱工程,並因應工程的需要進行輕鐵路軌改道。Shortly after 9. 15 pm, a light goods vehicle ( lgv ), driven by a 21 - year - old man, was travelling along tuen mun sze wui road towards pui to road
下午約九時十五分,一輛由一名二十一歲男子駕駛的輕型貨車正沿屯門鄉事會路往杯渡路方向行駛。To tie in with the grade separation works of light rail, a section of light rail tracks at pui to road has been temporarily closed until the works are completed at the end of 2003
配合架空輕鐵路軌工程,屯門杯渡路一段輕鐵路軌已經暫封,直至二零零三年底工程竣工為止。At junction of tuen mun heung sze wui road and pui to road, each carriageway approaching the junction will be widened to four lanes and one additional lane will be provided at the exits of the junction
在屯門鄉事會路及杯渡路交接處,將所有駛向該交接處的行車線擴闊至四線,亦在駛離該交接處的各出口多增一條行車線。In addition to exhibition panels detailing the projects, light rail is also displaying two models that feature the two tin shui wai new extensions and the tuen mun pui to road grade separation project
展覽內容除了展出多幅附有細致照片及詳細介紹各項工程的展覽板外,更展出杯渡路架空路軌工程及天水圍新支線工程的模型。Ballack ' s ball from the left was flicked on by tim borowski and klose headed home his fifth of the tournament
巴拉克左路的傳中球被博洛夫斯基擺渡到門前,克洛澤頭球打入了自己本屆杯賽上的第五個球。Temporary bus routes 505 and 506 commence service on 14 july to tie in with the grade separation works at pui to road a section of light rail tracks at kin on will be temporarily closed starting from 14 july as works begin at pui to road. light rail will introduce two temporary bus routes - bus routes 505 and 506 - for passengers affected by the closure
配合九廣鐵路公司架空輕鐵路軌工程進行,屯門杯渡路一段輕鐵路軌將由七月十四日開始暫時封閉,輕鐵將增設兩條臨時巴士線- 505及506線,為受影響的乘客提供服務。The entire project is expected to finish at the end of 2003. at that time passengers will be able to transfer to west rail at light rail san fat stop. traffic flow at pui to road will also be improved by up to 40 %
工程於二零零三年底完成後,乘客將可在輕鐵新發站轉乘西鐵,而杯渡路附近路面的交通容量可增加達百分之四十。分享友人