架空吊梁 的英文怎麼說
中文拼音 [jiàkōngdiàoliáng]
架空吊梁
英文
overhead lifting beam- 架 : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
- 空 : 空Ⅰ形容詞(不包含什麼; 裏面沒有東西或沒有內容; 不切實際的) empty; hollow; void Ⅱ名詞1 (天空) s...
- 吊 : hangsuspend
- 梁 : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
- 架空 : 1 (用柱子等支撐而離開地面的) built on stilts; be without foundations; overhead; aerial 2 (沒有...
-
Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders
其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。Specification for the design and testing of steel overhead runway beams
架空吊車道鋼梁的設計與試驗規范There are many materials and members to be hoisted during construction of the suspension bridge, unfortunately, the out - spread overhead curved cable makes it impossible for hoisting the stiffening girder with normal cable - supported lift. in order to ensure the construction proceeded smoothly, a multifunctional overhead cableway system is developed, thus accommodating all the hoisting tasks for the superstructure ( stiffening girder )
懸索橋施工中需要吊裝的材料和構件很多,豐都長江大橋懸索橋主纜採用空間外張式,使加勁梁的吊裝不能採用一般的纜載吊機形式,為使施工的順利進行,本橋施工中開發了多功能高架索道施工方案,以一副索道完成了多種工作,全面解決了上部結構(包括加勁梁)的多項吊裝作業。An uneasy feeling of mingled fear and vague repugnance took possession of him. he looked up into the heights above him, where more battens, the gas jets on which were burning low, gleamed like galaxies of little bluish stars amid a chaos of iron rods, connecting lines of all sizes, hanging stages and canvases spread out in space, like huge cloths hung out to dry
他抬頭仰望舞臺上空,上面還有一些布景照明燈,燈頭都捻小了,宛如一群淡藍色的小星星在閃爍,上面的一切都顯得雜亂無章,布景格架粗細不一的電線吊梁升在上空的幕布亂糟糟地掛在舞臺上面,幕布像晾曬著的大床單。The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction
但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。分享友人