架空纜索 的英文怎麼說

中文拼音 [jiàkōngsuǒ]
架空纜索 英文
overhead cable
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : 空Ⅰ形容詞(不包含什麼; 裏面沒有東西或沒有內容; 不切實際的) empty; hollow; void Ⅱ名詞1 (天空) s...
  • : Ⅰ名1. (拴船用的鐵索或多股粗繩) cable; hawser; mooring rope 2. (擰成多股的似纜物) thick rope; cable Ⅱ動詞(用繩索拴船) cable
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • 架空 : 1 (用柱子等支撐而離開地面的) built on stilts; be without foundations; overhead; aerial 2 (沒有...
  1. New hampshire s publicly - owned aerial tramway, the first erected to a mountain top in north america, is located in franconia notch near the old man of the mountain

    新漢普郡的公有的高道是北美第一高山道,它位於the old man of the mountain附近的franconia notch
  2. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸橋恆載設計理想狀態建立了懸橋施工計算原理;以分段懸鏈線理論為基礎,推導了懸的線形變化剛度和懸支點的滑移剛度;介紹了懸橋成橋設計線形計算、吊無應力長度計算、線形與預偏量計算、絲股設線形計算、夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  3. Elastic spread should not be neglected in the equipment of large skyline defection, such as aerial ropeway and suspension cable crane

    道、起重機等承載撓度比較大的設備,彈性伸長更是不可忽視。
  4. There are many materials and members to be hoisted during construction of the suspension bridge, unfortunately, the out - spread overhead curved cable makes it impossible for hoisting the stiffening girder with normal cable - supported lift. in order to ensure the construction proceeded smoothly, a multifunctional overhead cableway system is developed, thus accommodating all the hoisting tasks for the superstructure ( stiffening girder )

    橋施工中需要吊裝的材料和構件很多,豐都長江大橋懸橋主採用間外張式,使加勁梁的吊裝不能採用一般的載吊機形式,為使施工的順利進行,本橋施工中開發了多功能高道施工方案,以一副道完成了多種工作,全面解決了上部結構(包括加勁梁)的多項吊裝作業。
  5. From japan to inspect the top of wulai waterfall as to guarantee the safety of cable car and recreational area currently under construction

    9月聘請日本道專家近藤勇先生前來烏來瀑布頂端勘查,保證適于車及闢建樂園。
  6. Safety requirements for cableway installations designed to carry persons - general requirements - part 2 : additional requirements for reversible bicable aerial ropeways without carrier truck brakes

    載人道裝置的安全要求.一般要求.第2部分:不帶重貨運輸車式剎車的雙向雙道的附加要求
  7. Fengdu yangtze suspension bridge is characterized with out - spread overhead curved cable, tunnel - type anchorage and steel - truss stiffening girder. it is well - known for its new structure, complex technology, accurate workmanship, and difficult construction. it is valuable to review its construction method and new technique developed during construction

    豐都長江大橋懸橋具有外張式間曲線主、隧洞式錨碇和鋼桁加勁梁的設計特點,結構新穎、技術復雜、工藝精度高,施工難度大,其施工方法和施工中開發的新技術具有重要的應用價值。
分享友人