架空車道 的英文怎麼說

中文拼音 [jiàkōngdào]
架空車道 英文
aerial tramway
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : 空Ⅰ形容詞(不包含什麼; 裏面沒有東西或沒有內容; 不切實際的) empty; hollow; void Ⅱ名詞1 (天空) s...
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 架空 : 1 (用柱子等支撐而離開地面的) built on stilts; be without foundations; overhead; aerial 2 (沒有...
  • 車道 : (traffic) lane
  1. A bridge or other structure over a road may restrict the actual headroom available

    路上的橋梁或其他建築物,使輛通行的確實高度受到限制。
  2. After expounding the power supply and current collection modes of the rolling stock in shanghai umt pearl line in terms of technology and economy, the author argues that two current collection modes shall be adopted for shanghai umt pearl line, i. e. a third rail collector be on skybridge while the overhead contact line on the ground

    摘要闡述了城市軌交通輛供電受流方式的特點,並從技術和經濟兩方面對上海明珠線輛供電受流方式進行了探討,提出了明珠線輛應採用雙受流方式,即高橋上採用接觸軌受流器受電,地面採用接觸網受電弓受電。
  3. New hampshire s publicly - owned aerial tramway, the first erected to a mountain top in north america, is located in franconia notch near the old man of the mountain

    新漢普郡的公有的高是北美第一高山索,它位於the old man of the mountain附近的franconia notch
  4. Circulating material ropeway. cars. specifications

    循環式貨運.貨.技術條件
  5. By this means, the performance of the shock absorber is improved as well as the quality of suspension system. after tested on the testing equipment and on the road condition matched with the car, outer performance of the double - tube gas hydraulic shock absorber pr ove to be excellent and the indicator diagram are full and smooth. the operation and control of vehicle are also obviously improved. with the improvement of domestic components as well as gas charging equipment and gas charging workmanship, the double - tube hydraulic shock absorber meets domestic market requirements and will have a better prospect

    我們對研製的雙筒充氣液壓減振器進行了臺試驗和裝路試驗,表明這種減振器具有優良的外特性,其示功圖豐滿、圓滑,輛操縱性明顯改善。隨著我國零部件質量水平的提高,及充氣設備、充氣工藝的改進,雙筒充氣液壓減振器將有更廣闊的發展間,適合我國的國情。
  6. Specification for the design and testing of steel overhead runway beams

    鋼梁的設計與試驗規范
  7. In most tunnels or on expressways the signals are overhead, one applying to each lane

    大部分隧或快速公路的信號燈都是的,每個信號燈僅適用於某一條行
  8. Re - alignment of the upper section of bisney road at its junction with pok fu lam road involving the replacement of existing carriageway with new carriageway partly on elevated structures

    將碧荔上段與薄扶林交界處的路重新定線,工程包括建造新行部分為結構,以取代現有行
  9. Re - alignment of the upper section of sassoon road at its junction with pok fu lam road involving the replacement of the existing carriageway with new carriageway partly on elevated structures

    將沙宣上段與薄扶林交界處的路重新定線,工程包括建造新行部分為結構,以取代現有行
  10. Widening of the section of pok fu lam road fronting queen mary hospital involving the construction of new carriageway partly on elevated structures and reconstruction of existing carriageway

    此項工程包括擴建位於瑪麗醫院前的一段薄扶林,工程包括建造新的行部分為結構及重建現有行
  11. Try not to push your cart or trolley along busy roads

    不要在交通繁忙的路或路上推動手推
  12. Illustrated are lane control signs usually mounted on gantries above the road and signals mounted on the roof of the tunnel

    圖中所示的行限制性標志,通常見于路上的標志牌。至於信號燈,則裝置在隧頂部。
  13. The tia final report provided in the cd - rom included in volume two of ifp recommended the implementation of a number of road improvement schemes in the form of a number of localized road junction improvements ( schemes 1c, 7, 8 and 9 ), a new link road between yan cheung road and lin cheung road ( scheme 3 ), a new vehicular underpass along lin cheung road ( scheme 4 ) and an elevated road above the western harbour crossing toll booth and additional slip road leading to west kowloon highway ( scheme 6 )

    載于發展建議邀請書第二冊所附光碟的交通影響評估最後報告,建議實施多項路改善計劃,包括多條區內路的路口改善計劃(計劃1c 、 7 、 8和9 ) 、欣翔與連翔之間的新連接路(計劃3 ) 、沿連翔一條新的行(計劃4 ) ,以及西區海底隧繳費處對上的路及通往西九龍快速公路的新增連接路(計劃6 ) 。
  14. An elevated structure with the concourse at ground level and the platform at viaduct level, the station will offer parking facilities and a public transport interchange

    這高站的大堂建於路堤上,月臺則設于層,設有泊設施和公共交通交匯處。
  15. York made a big impact. huge trees fell onto the track near hung hom. some were found toppled onto the overhead line south of tai po, which affected the electricity supply and even caused the ktt to stop services

    風球的影響廣泛,紅?繞旁的大樹紛紛倒在路軌上,大埔以南亦有大樹壓倒在電纜上,影響供電系統,連九廣通直通亦被迫停止服務。
  16. Safety requirments for cableways installations designed to carry persons - general requirements - additional reqirments for reversible bicable aerial ropeways without carrier truck brakes

    載人用索裝置的安全要求.一般要求.不帶重貨運輸式剎的雙向雙線的附加要求
  17. Safety requirements for cableway installations designed to carry persons - general requirements - part 2 : additional requirements for reversible bicable aerial ropeways without carrier truck brakes

    載人索裝置的安全要求.一般要求.第2部分:不帶重貨運輸式剎的雙向雙纜的附加要求
  18. Tnt has a fleet of over 19 000 vehicles and 42 airplanes and has the largest european road infrastructure and door - to - door delivery area

    快遞擁有逾19000輛運輸貨42貨機,並且擁有全歐洲最大的航路快遞運輸網路設施。
  19. Construction of a 800 - metre long section of two - lane elevated carriageway in the eastbound direction between man hong street and eastern harbour crossing

    介乎民康街與東區海底隧的東行方向,建設一段800米長的兩線
  20. Construction of a 1. 4 - kilometre long section of single - lane arriageway including a 400 - metre long section of elevated carriageway and a 45 - metre long section underpass in the westbound direction from tai cheong street at sai wan ho to the west of ehc

    由西灣河太祥街至東區海底隧西邊的西行方向,建設一段1 . 4公里的單線行,包括一段4 0 0米長的和一段4 5米長的地下行
分享友人