柱肋 的英文怎麼說

中文拼音 [zhùlèi]
柱肋 英文
rib of column
  • : 肋構詞成分。
  1. We adopt compositive recondition techniques, including anatomical repositioning of the musculus orbicularis oris, the alar and nasal septum cartilages, and correction of nasal deformity with transplant of cartilage

    根據不同的鼻畸形程度進行鼻唇肌肉的解剖復位,鼻翼及鼻中隔軟骨懸吊復位固定,以及軟骨塑形后移植,糾正鼻翼和鼻小的畸形。
  2. Stress analysis of coaming opening which cuts a ring on ring - stiffened cylindrical shell

    切斷一根骨的圓殼開孔應力分析
  3. The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time

    無骨架體系的主要承重構件是密夾芯板(包括樓板和墻板) ,縱、橫墻相交處設鋼筋混凝土構造(連接),墻板和樓板相交處設連系(圈)梁,連系梁和主要起連接和傳遞荷載作用,也承擔少部分荷載。
  4. Considering the special structure of multi - ribbed slab, founding diphase body mechanical model of compound material, strengthening rib beam and rib pillar by equivalent volume ratio of concrete and slice brick, the paper drew elastic compution constant and shear constant. based on the things, the paper simplified isotropy compution model to wall, gave practical design formula of elastic mold and shear mold, provided necessary parameter for practical design formula of elastic rigidity. finally the calculating results agree well with the text results

    結合密復合墻板的特殊構造,建立墻板的復合材料二相體力學模型,按照混凝土與砌塊體積比不變原則對同時加強,得出墻板的彈性計算常數及剪切常數,在此基礎上,進一步將墻板簡化為各向同性的計算模型,給出墻板彈性模量及剪切模量實用計算公式,為密復合墻板的實用彈性剛度計算公式提供必要的參數。
  5. Based on the numerical simulation and accuracy analysis to previous slab ' s test with the ansys program, the study of composite wall, with various detail design under potential load action respectively or jointly is carried on and the wall ' s atress behavior and failure mode is obtained, also the influence to wall ' s stiffness and bearing capacity by kinds of factors, including wall ' s shear span ratio, member ' s section, bar arrangement, etc. based on the hammer blow test and stiffness test, a 1 / 3 scale ten - bay model ' s modality parameter and elastic deformation characteristic is analyzed

    在對密復合墻板運用ansys ~ ( ( ? ) )程序進行數值模擬、分析驗證的基礎上,對典型組合墻體在不同連接構造和不同荷載效應組合作用下的受力形態和破壞模式進行研究;計算分析了復合墻體剪跨比、邊框截面尺寸、邊框配筋大小以及墻板內配筋等諸多因素對密復合墻體承載力及剛度的影響,得出其變化規律。
  6. Low frequency scattering from cylindrical shell with rib

    平頂有殼低頻散射特性研究
  7. The part of the body of a human being or quadruped on either side of the backbone and between the ribs and hips

    腰部人類或四足動物的身體部分,位於脊兩側,骨與臀部之間
  8. The test results another is made of four welded equal - leg angles with show that the ribs ( lips ) cohere with concrete very well before the specimens are damaged, and the damage modes are mainly of shear forms

    結果表明:薄壁鋼管混凝土短以剪切破壞模式為主;與混凝土在試件破壞之前,均能保持良好粘結。
  9. Thecalculating results show that the composite action between concrete floor and steel beamsgreatly influence the bending bearing capacity and initial rotational stiffness of joints, it shouldbe considered in practical engineer. reinforcement ratio of lengthways reinforcing bar andthe stiffener of web have great influencer on the behavior of connections, while the thicknessof end - plate and degree of shear connection have a litter influence on its behavior

    分析計算結果表明:樓板與鋼梁的組合作用對節點的抗彎承載力及初始轉動剛度的影響非常大,實際工程中節點設計應當考慮這種組合作用;樓板內縱向鋼筋配筋率與腹板加勁對節點性能影響顯著,而連接端板厚度及剪力連接程度的影響則不是太顯著。
  10. The software ansys6. 0 is used to analysis the stability of the state after construction of tongwamen bridge, linear method is used in analyzing the finite element model of the bridge, the coeffient of stability of different state after construction is given. on the basis, the effect of different factors such as the arrangement of lateral brace, the sloping angle of arch ribs, the stiffness of bridge deck system, the effect of non - orientedly conservative loadings of the hanger and tie bar etc is discussed. the different coefficients of stability of changing these factors are given, so the factors that are vital to the lateral stability of x - type arches are found, and the rationality of the methods taken to enhance the lateral stability of tongwamen bridge is evaluated

    本文應用有限元分析商業軟體ansys6 . 0 ,採用線彈性方法,通過對該橋的空間有限元模型進行穩定性分析,得出其成橋運營階段各種工況下的穩定安全系數。在此基礎上,本文還通過有限元模型分析,就拱的矢跨比、吊桿(立)的非保向力效應、橋面系的剛度、橫撐布置形式、拱側傾角等因素對該橋整體穩定性的影響展開探討與研究。文中給出了各因素變化情況下的穩定安全系數,指出了對鋼管混凝土提籃拱橫向穩定性有顯著影響的因素及其合理變化范圍,並對銅瓦門大橋提高橫向穩定性的措施的經濟合理性進行了分析。
  11. The pre - stressed anchor supporting structure with beam and column is analyzed theoretical in this paper, combined with theoretical study and design of such supporting structure, which is one of the plan projects of construction science and technology in hunan province. the topic provides engineering aiming with practical and concise computation method, and also provides the advice for structure with proper theory foundation and schemes to some extent

    本文結合湖南省建設科技計劃項目「永久性錨桿擋土墻設計關鍵問題及計算軟體開發」 ,對預應力錨桿支擋結構進行了理論分析,提供了適合於工程的、比較簡捷的實用計算方法,同時也為該類支擋結構設計提供一定的理論依據和設計建議。
  12. Test on extended end - plate with end - plate stiffer beam - to - column connection

    帶端板加勁的外伸端板連接的樑節點試驗
  13. Making a preliminary appraisal of mongolian medicinal leshuanhua with ultravioleticography

    蒙藥花紫外譜線組法鑒別的初步研究
  14. Thus it is necessary to study moment resistance, rotation stiffness and rotation capacity of the joints. in this paper, six specimens on end - plate composite beam - to - column joints and two specimens on end - plate composite beam - to - column joints were designed to subject to static load. the factors of m - characteristics about semi - rigid composite joints, including bolts, profiled steel sheeting, beam, column, stiffen rib and reinforcement, are studied

    本文設計了6個端板型鋼-混凝土組合樑節點與2個端板型純鋼樑節點,通過對這些試件的靜力荷載試驗,重點研究了端板型鋼-混凝土組合節點的彎矩-轉角性能的影響因素,包括高強螺栓、壓型鋼板、型鋼梁、型鋼、加勁,以及混凝土板內縱向鋼筋配筋率等。
  15. 3. the calculating elements and the calculating model of rib - column, rib - beam and retaining plate of the supporting structure are proposed in this paper

    3 、提出了梁和擋土板的計算單元劃分以及計算模型的確定方法。
  16. In the pre - stressed anchor supporting structure with beam and column, anchor, supporting structure and soil work jointly, therefore in this paper, rib - column and rib - beam are used models of elastic foundation beams, the solving method of rib - column and rib - beam are given out

    由於錨桿和支護結構以及周圍土體是共同工作、彼此協調的,因此梁按彈性地基梁進行計算,並推導出計算公式。
  17. The research suggests that the failure process of the multi - ribbed composite walls under horizontal seismic loads is : the cracks of the infilled silicate bricks and the cracks of the inner rib beams and rib columns - the cracks of the outer frames ; and that the walls can release energy by stages, showing perfect capacities of energy dissipation and collapse resistance

    研究表明:復合墻板在水平地震力作用下,其破壞過程按「填充砌塊??外框架」的順序進行,分級釋放能量;試驗中墻板大部分發生剪切滑移破壞;墻板的平均抗剪承載力、延性指標、耗能及抗倒塌能力明顯優于組合磚墻。
  18. The wall was equaled to an elastic composite slab with silica bricks as main body and concrete rib beams, columns and outer frame as reinforcing fiber. ( 2 ) elastic - plastic stage. the wall was equaled to a rigid frame - oblique compression bar model in which concrete frame was equivalent to a rigid frame while silica brick was equivalent to a oblique compression bar

    ( 1 )彈性階段? ?將墻體視為一種以輕質砌塊為基體,混凝土梁、、外框為增強纖維的復合材料等效彈性板; ( 2 )彈塑性階段? ?將墻體視為一個由鋼筋混凝土剛架和與之鉸接的砌塊等效斜壓桿組成的剛架斜壓桿組合模型; ( 3 )破壞階段? ?將墻體視為梁嚴重破損的梁鉸框架模型。
  19. Rolling bearings - single - row cylindrical roller bearings - chamfer dimensions for loose rib and non - rib sides

    滾動軸承.單列圓形滾子軸承.活動和無側面倒角尺寸
  20. It is a top load bridge with a clear span of 288m, which is maximum one of the same structural system in asia. the main arch rib uses 8 steel tube of 920mm joined by web members and transverse truss to form a space truss. the soldier piles on the arch are made of bent frame to make the shape both artistic and novel

    梅溪河大橋為一凈跨達288米的上承式鋼管混凝土拱橋,是目前亞洲同類橋型中跨度最大的橋梁,其主拱採用8根920mm的鋼管,通過腹桿及平聯形成鋼管混凝土空間桁架,拱上立亦採用鋼管混凝土排架,造型新穎美觀。
分享友人