柱負載 的英文怎麼說
中文拼音 [zhùfùzǎi]
柱負載
英文
column load-
Methods of test for ancillary components for masonry - part 5 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties couple test
圬工輔助成份試驗方法.第5部分:拉伸和壓縮負載容量和墻系柱和負載代替特性測定Methods of test for ancillary components for masonry - part 6 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test
圬工輔助成份試驗方法.第5部分:拉伸和壓縮負載容量和墻系柱和負載代替特性測定Methods of test for ancillary components for masonry - part 7 : determination of shear load capacity and load displacement characteristics of shear ties and slip ties couplet test for mortar joint connections
圬工輔助成份試驗方法.第7部分:拉伸和壓縮負載容量和墻系柱和負載代替特性測定Load boards ; box pallets, post pallets, principal dimensions and stacking devices
負載板.第1部分:箱式托盤立柱式托盤主要尺寸和堆The elastic methods are beam - columns method, the pseudo load method, the pseudo lateral load method, the iterative gravity load method and the negative rigidity method
常用彈性分析的方法有:樑柱法、虛擬荷載法、虛擬側向荷載法、迭代重力荷載法和負剛度法。Catalyst mos2 k2co3 tio2 for mha from co h
採用浸漬法和干混法制備了一系列負載鉬的層柱分子篩催化劑En2357 aerospace series. stud - ends, in corrosion resisting steel swaged on type, control calble. dimensions and loads
航空航天系列.操縱鋼索鍛制型耐腐蝕鋼制柱螺栓頭.尺寸和負載Abstract : ansys ( application for fea ) is applied for analysis of performance of pre - loaded hollow cylindrical roller bearing ( hcr )
摘要:利用有限元分析軟體ansys對預負荷空心圓柱滾子( hcr )軸承的承載性能進行分析。The bottom roller and sub - bottom roller of hcr is calculated about its equivalent stress, contact stress and the distributing of pulling - stress along the inside track of hcr. also, effects of hollowness and pinch fit are analyzed on bearing stress and rated load
主要計算預負荷空心圓柱滾子軸承的最底部滾子和次底部滾子的等效應力、接觸應力和滾子內圈拉應力的分佈情況,分析滾子空心度和過盈量對軸承應力和額定載荷的影響。The robust structure of the load cell, which is manufactured from stainless steel, also allow it to be used in industrial atmospheres
負載通過裝在圓柱形兩側的螺紋銷釘作用在元件上。這款由不銹鋼製造的緊湊結構的元件可以應用於工業環境。To guarantee the stability of the frame in strong earthquake motion, and on the basis of analysis on the concept of “ capacity design ” in the above three countries seismic design provisions, it is advised that the moment amplification coefficients at the bottom sections of columns for the frame structures in some seismic intensity be increased to reduce the possibility of the frame column yielding. taking the above three countries seismic codes as reference, it is recommended that it be added details of seismic design by using diagonal shear reinforcement to safeguard beams against sliding shear failure, when the positive - negative shear forces are reverse and the ratio is high
為了保證在大震作用下框架結構的穩定性,借鑒國外規范「柱-梁承載力級差系數」的思想,本文提出了對部分抗震等級的框架結構的柱端抗彎能力增強系數應予以提高,以降低框架柱屈服的可能性;參照國外有關規范的發展,本文建議對于正、負剪力反向且比值較大的框架梁宜增加交叉斜筋,以防止沿垂直裂縫發生嚴重的剪切錯動。Zhang yanting , li zengliang , wang hanxiang. optimum design for operation system of surface - driven progressing cavity pump well j. oil field equipment , 2000 , 29 ( 1 ) : 24 - 26
陳濤平,王春艷,孫兆海,等.地面驅動螺桿泵抽油桿柱負載扭矩的計算jAccording to the characteristics of the piston pump when it works with the diesel engine, the different outer load leads to different rotational speed and mechanics characteristics of the piston. in order to learn the property of the movement and mechanics of the piston but not experimentalize, simulink which is the simulation toolbox of matlab ( the most popular large - scale mathematic software ) is carried out to simulate the process of the movement and the receiving force of the piston
根據發動機和全功率軸向柱塞泵的工作特性,柱塞泵在受到的外負載不同時,柱塞的轉速和受力情況就不一樣,為了能在不做實驗的情況下就能了解柱塞的運動特性和受力特點,利用現在最為流行的大型數學軟體matlab的模擬工具箱simulink對其進行了運動和受力的模擬分析。Css packaging - small load carrier systems - column stackable system
包裝.低負荷載運系統.柱形疊架制Plus, everything else affects the impedance : the speaker wire, the connections, contributions from crossover circuits inside the speaker, corrosion, fuses and circuit breakers, loading by changing a ported cabinet when you plug or unplug a port insert, condition of the speaker assembly ( like the foam surrounds of a woofer, or the condition of the ferromagnetic fluid of some tweeters ), the cabinet seals, etc
另外,還有其他東西會影響到揚聲器的阻抗:喇叭線,接線柱,內部分頻線路,部件的腐蝕情況,保險絲或斷路器,箱線頭子和接線柱之間產生的負載,揚聲器組裝時的生產環境,箱體的密封情況,等等。Lighting columns - part 3 - 1 : design and verification ; specification for characteristic loads ; german version en 40 - 3 - 1 : 2000
燈柱.第3 - 1部分:設計和驗證.特性負載規范;德文版本The load test for bridge no. str18 foreground has been completed while work continues on the construction of the abutments pier for bridge no. str19 background
鄰近於長沙橋編號str18的樁柱負載測試經已完成前景觀與及繼續進行橋編號str19的橋墩和中間橋墩的工程後景觀分享友人