桁弦應力 的英文怎麼說

中文拼音 [héngxiányīng]
桁弦應力 英文
chord stress
  • : 桁名詞[建築] (檁) purlin
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. The possible shear of the upper chord will change beam from flexural member to member under flexure and compression force. this is emphasised through design example. as a result , we find that composite floor system is good for reducing the height of floor system

    在組合樓蓋體系設計中,筆者指出,可能的桿剪會使作為桿側向支承的梁由彎曲構件變為壓彎構件,這是在與架體系相適的樓蓋體系設計中該注意的一個環節。
  2. Construction of ultra - large span prestressed string truss structure

    超大跨度預架結構施工
  3. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外預鋼結構的發展歷史及現狀作了綜述和總結,指出當前預鋼結構工程實踐中存在的主要問題;闡述了預鋼結構的受機理,並指出預鋼結構的適用范圍和特點;在考慮結構和變位約束的條件下,建立預鋼結構優化設計模型;提出多次預鋼結構優化設計方法和步驟,採用線性規劃和滿約束準則相結合的優化方法,可優化設計出施加的每一級預的大小,並得到結構各部分的優化截面;對多次預最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次預鋼屋架、局部布索的水平平行架、整體布索的水平平行架和局部布索的超靜定鋼架等算例進行了優化設計,經濟效益明顯;對水平平行架的幾種施加預的方案進行比較,對于局部布索,預只對下起到卸載作用,對上和腹桿基本不起作用;而整體布索預除對下卸載外,對索折點以外部分腹桿也起到卸載作用,經濟效益好於局部布索。
  4. The pre - stressed arch truss string structure is one of the new pre - stress steel structure styles, because it possessed of rational mechanical feature, it has been used in many national and foreign engineering practices

    架結構是一種新型的預鋼結構形式,由於其受合理的特點在國內外工程實踐中得到了較多用。
  5. This paper analyses multi - stage pre - stressing and different parameters produce the impacts to static and dynamical behavior of the structure by theoretical calculation and experimental research. the conclusion can provide reference to static and seismic design of arch truss string structure. the main issues in the paper are : the multi - stage pre - stressing loading experiment is studied in this paper

    本文通過理論計算和試驗研究分析了多次張拉預、參數設置對張架結構靜、動性能的影響,主要完成了以下幾方面的工作:進行了模擬施工過程中的多次預加載試驗。
  6. Research on prestress stretching control of a large - span truss string structure

    大跨度張架預張拉控制研究
分享友人