桅桿上節 的英文怎麼說
中文拼音 [wéigǎnshàngjié]
桅桿上節
英文
upper mast-
So, our team had not the chance to move horizontal on the mast when the ship was moving. about the 1, 200 meters running, the way was not clear and there is no enough instructors or staffs to direct the 36 trainees, it resulted in most trainees lost the way and failed to finish the 1, 200 meters that included me. according to the environment, city challenge instead of field challenge, camp on beach replaced sole stay in mountain, the tend of wind delayed the sailing schedule and it cancelled the raft race, it took away our opportunity of learning how to make raft by bamboo and large plastic tub
首先是船頭跳水,在港,正好鯊魚旺季,暫停營業,到了日本,又逢港口管制,被逼休假;而離港啟航的首個節目,本應是在行進的船上,爬上桅桿,再橫行桿上,學習解帆,雖然桿是上盡了,但雨卻落下來,船要轉帆,於是橫行桿上學習解帆這等壯觀場面,我們全組都無緣參與;再來是千二米長跑,指示不清,路線不明,以致多人迷路,被逼半途而廢;接下來的野外定向,因就地利,變身為城市挑戰;山中獨處換了沙灘露宿;風向延誤了航程,阻止了木伐競渡。Based on guyed mast fem model of 4 - node space cable element and space beam element, the method to analyze along - wind induced nonlinear oscillation in the time domain is established, which breaks the traditional analysis in the frequency domain using stochastic theory on the linearization premise. and the results of imitation analysis reflect the essential character of guyed mast
在將桅桿結構離散為空間四節點索單元和空間梁單元的計算模型的基礎上,提出了桅桿結構順風向風振響應的非線性時域分析方法,突破了傳統的用隨機振動理論對桅桿結構進行頻域分析的方法,模擬分析結果表明能夠反映桅桿結構的基本特徵。3 a set of front - mounted adjustable columns on drill frame is used for adjusting height of mast front - end, which makes it easy to align with hole site
3鉆機機架前部設有上下調節立柱及哈夫,可調節桅桿高低國家專利: zl02264791 . 0 ,施工時對孔位快捷方便。3 a set of front - mounted adjustable columns on drill frame is used for adjusting the height of mast front - end, which makes it convenient to align with hole site
3鉆機機架前部設有上下調節立柱及哈夫,可調節桅桿高低國家專利: zl02264791 . 0 ,施工時對孔位快捷方便。3 a set of front - mounted adjustable columns on drill frame is used for adjusting the height of mast front - end, which makes it convenient to align with working position
3鉆機機架前部設有上下調節立柱及哈夫,可調節桅桿高低國家專利: zl02264791 . 0 ,施工時對孔位快捷方便。分享友人