渣壩 的英文怎麼說

中文拼音 [zhā]
渣壩 英文
slag dam
  • : 名詞1 (渣滓) dregs; residue; sediment:煤渣coal cinder; 殘渣 dregs; 豆腐渣 soya bean residue; 豬...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. Research on construction technology of earth and rock - fill dams and tailing dam, soft foundation improvement and aseismatic engineering

    土石工程、灰技術、軟土地基加固、工程抗震等研究領域取得了富有創造性、具有國際先進水平的成果。
  2. Thebasic evaluation process, method and stages involved in the structure of environment riskevaluation of tailingdam type of stacking area were introduced. a concrete method forenvironment risk evaluation of phosphogypsum stacking area was introduced by a example. areference and a comparison were offered to the environment risk evaluation of largeandmedium scale of chemical industry waste stacking area by the method

    對尾礦場的環境風險評價框架結構中涉及的各個階段及基本評價過程與方法作了簡要的介紹,並通過實例介紹如何進行磷石膏場的環境風險評價工作,具有典型性和參照性,可作為國內大中型化工廢物場環境風險評價的參照和類比。
  3. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石原位觀測和反潰分析研究」及「高土石動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  4. Among the 130 debris flow valleys, dazhai gully suspends high on the up range of baihetan hydropower station, with an altitude over 970 m and a drop more than 350 m. gravels, mud and flood in this valley brings the construction site in great danger. 3 kilometers upriver from the mouth of dazhai gully, lies the haizi gully, which is also frequented by debris flows, but will be taken as the dumping site for the construction

    庫區130條泥石流溝中大寨溝以溝口海拔970餘米的高程和350餘米的落差高懸于白鶴灘水電站的大上方,其溝內泥石流帶來的礫石、泥沙與洪水直接威脅著電站建設工地和樞紐的安全;緊鄰大寨溝溝口上游約3km的海子溝則為一條泥石流活動頻繁的溝谷,因其出口將作為水電站建設的棄場地,流域內的泥石流活動關系著水電站建設中棄場的安危。
  5. Based on the productive rolling experiments on two material sources of the excavated debris for construction of the downstream side of dam body, the compaction characteristics of the materials are analyzed and the rationality of the related design filling standards are verified, and then the economic and reasonable compaction method, rolling equipments and the construction parameters accorded with the filling standards concerned are recommended as well

    摘要通過對下游體填築石料的兩個料源進行生產性碾壓試驗, ?解分析其壓實特性,核實設計填築標準的合理性,推薦達到填築標準的經濟合理的壓實方法、機械類型、施工參數等。