桅頂結 的英文怎麼說

中文拼音 [wéidǐngjiē]
桅頂結 英文
collar knot
  • : 名詞(桅桿) mast
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  1. They were, says mr stephen, and the end was that the men of the island, seeing no help was toward as the ungrate women were all of one mind, made a wherry raft, loaded themselves and their bundles of chattels on shipboard, set all masts erect, manned the yards, sprang their luff, heaved to, spread three sheets in the wind, put her head between wind and water, weighed anchor, ported her helm, ran up the jolly roger, gave three times three, let the bullgine run, pushed off in their bumboat and put to sea to recover the main of america

    「此語不差」 ,斯蒂芬先生曰, 「其果,本島男子發現負情女子異口同聲,無可救藥。遂建造舟筏,攜家財登船,桿盡皆豎起,舉行登舷禮,轉船首向風,風停泊,揚起三面帆,在風與水之間挺起船首,起錨,轉舵向左,海盜旗迎風飄揚,三呼萬歲,每次三遍,開動艙底污水泵,離開兜售雜物之小舟,駛至海面上,航往美洲大陸。 」
  2. A platform enclosing the head of each mast of a sailing ship, to which the topmast rigging is attached

    樓,盤帆船上包圍著所有帆頭的平臺,索具就加于其上
  3. System imitation analysis in the time domain indicates that the amplitude and peak of displacement at the joint between cable and mast are both reduced, and the fatigue life of guyed mast is increased. adjusting the location of mr damper can efficiently reduce the displacement on the top of guyed mast induced by wind

    模擬分析表明可以有效地減小構纖繩與桿身連接處的位移響應的幅值與峰值,能提高構的疲勞壽命,通過調節mr阻尼器的作用位置可以改善對部位移響應的控制效果。
  4. Upon this i prepar d to go on board the ship, but told the captain, that i would stay that night to prepare my things, and desir d him to go on board in the mean time, and keep all right in the ship, and send the boat on shore the next day for me ; ordering him in the mean time to cause the new captain who was kill d, to be hang d at the yard - arm that these men might see him

    如果讓船長把他們帶走,其果必然是上絞架弔死。我把那吊在大船上的新船長指給他們看,並告訴他們,他們也沒有別的指望,只能是這種下常他們一致表示願意留在島上。於是,我就把我這里生活的情況告訴他們,並教會他們怎樣把生活過好。
分享友人