梁善 的英文怎麼說

中文拼音 [liángshàn]
梁善 英文
liang shan
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : Ⅰ形容詞1 (善良; 慈善) good 2 (良好) satisfactory; good 3 (友好; 和好) kind ; friendly 4 (...
  1. Seat back cushion sets at 14 massages head, the simulation massage technique cantle very good capture distribute in the bone ling two sides acupuncture points " rubs " the function, in the seat cushion sets at 4vibrators, the buttocks vibrates may promote the blood circulation, the improvement metabolism

    靠背內置14個推拿按摩頭,模擬按摩師的按摩手法能很好捕捉分佈在骨兩側穴位的「揉搓」機能,座墊內置4個振動器,臀部振動能促進血液循環,改新陳代謝。
  2. Based on a duralumin flexible beam with piezoelectric films attached, distributed parameter modal described by partial difference equations is builded, and then turned into a set of two order systems with the method of modal analyse. state feedback control and independent modal control is investigated. and simulation of the closed - loop system with thest two methods is performed in matlab

    並用模態分析的方法,將系統的偏微分方程模型轉化成了模態模型;研究了狀態反饋和獨立模態方法;進一步完了軟體界面以及軟體功能;在實際系統中,應用狀態反饋演算法,有效抑制了懸臂在受到外界瞬時脈沖擾動和激振引起的一階、二階模態振動。
  3. If you want to get more information about different kinds of kaoliang liquors, you could leave a message or make a phone call, ( 03 ) 3333131, to our company, we will serve you immediately

    如果想更進一步了解,高酒的種類及相關內容,請加使用本公司網路留言板及電子信箱,或撥打客服專線( 03 ) 333 - 3131 ,將有專人為您服務。
  4. Here the hsc of sompa is achieved through adding super - effective water reducer, fined slag and silicon fume, and decreasing the water / cement ratio. by varying the area ( spacing ) of tension bars, compressive bars, vertical links and distribution steel and embedding steel fiber and polypropylene fiber we try to improve the behaviors of reinforced high performance concrete one - way spanning slabs in bending, so that its ductility be greater than 5. with the same arrangement of steel the width of bending member is varied to observe the effect of the width / depth ratio on the ultimate compressive strain of concrete

    通過變化受拉筋含筋率和受壓筋、箍筋(鉤筋、分佈筋)含量,或摻加纖維使之成為鋼纖維高強混凝土( sfrhsc )和聚丙烯纖維高強混凝土( pfrhsc ) ,對高強混凝土雙筋截面、板的受彎性能進行了試驗研究,試圖改高強混凝土受彎構件的延性,使其延性比大於5 ;並在相同配筋情況下,通過變化截面寬度,研究了高強混凝土受彎構件的寬高比對壓區混凝土極限應變的影響;並對試驗構件的裂縫發展情況進行了觀測。
  5. They act as a bridge between the group and the customers. we make continuous improvement through active listening to our customers opinion. this drives our service to the world - class level

    我們的使命是發揮以客為尊的精神,同時也作為公司及客戶的溝通橋,聆聽客戶的意見,從而作出適當的改,令集團管理服務邁向國際級水平。
  6. Then the judging method is proposed, and the proposed method can consider the stress history and viscosity shear strength of soft soil. in this paper, a fem program dpfbm1. 0 ( double plastic foundation beam method ( version 1. 0 ) ) is established. with this program, the influence of some parameters on foundation excavation is fully studied, the parameters include : compression modulus, cohesive strength, angle of internal ficiction, effective angle of internal friction, the embedded length of the wall and building load

    針對當前國內外彈性地基法存在的缺陷,基於對軟土流變性的研究,採取了剪應力判斷彈塑性狀態,以改進和完基坑工程彈性地基法,推導了彈性狀態下地基反力系數的近似解,提出了採用剪應力組合判斷土彈簧彈塑性狀態的方法,編制了相應的彈塑性共同變形法分析程序dpfbm1 . 0 ( doubleplasticfoundationbeammethod ( version1 . 0 ) ) ,並採用該程序分析了壓縮模量、粘聚力、內摩擦角等參數變化對基坑工程的影響。
  7. Comparison including the cracking, yielding and ultimate loads of the beam, load - displacement curve, envelop curve, the ductility and energy - dissipation capacity were made between the response of the specimens before and after strengthening. test results indicated that the yielding loads of the specimens after strengthening were improved from 12. 3 percent to 17. 2 percent and the improvement of specimens rehabilitated by jacketing was higher than that of the bonding steel plates one

    加固后試件破壞同樣發生在端,屈服荷載比加固前提高12 . 3 17 . 2 ,與粘鋼加固相比,加大截面法加固的試件承載力提高幅度較大;加固后試件的延性和耗能性能比加固前有很大的改,其中以粘鋼加固的試件提高最為明顯。
  8. In the engineering background of a suspension bridge tender project, taking the bridge and the airflow as a whole system, the effectiveness of the surface in the flutter stability of the system is studied by a multi - mode flutter analysis approach

    以某懸索橋設計方案為工程背景,把橋與氣流作為一系統,應用多模態顫振分析方法,研究了在主下風側設置翼板這種控制措施對改該系統顫振穩定性的效果。
  9. The main purpose of this paper is to study crack growth rate of a class of nonlinear viscoelastic materials under the condition of constant load and small - strain. in this paper : the new test program is raised by referencing the existing test programs and by our trial and error ; in the new test program, facilities involved in the nonlinear viscoelastic crack tests are relatively few, the test process is relatively simple and the data obtained from the experiments are credible. on this basic, the calculation of j integral of nonlinear viscoelastic double cantilever beams specimens and the parameter of fracture work of corresponding nonlinear viscoelasticity are derived

    具體成果包括: 1 、證實了雙懸臂試件用於非線性粘彈性裂紋擴展實驗研究的優點:雙懸臂試件在實驗中能觀測到的擴展過程持續時間比較長,在計算j積分時,計算方法簡單; 2 、得到了改性聚丙烯材料用於非線性粘彈性裂紋擴展實驗的兩種有效的試件構形和相應的試件尺寸;採用不斷改夾具的方法使得加載穩定; 3 、經過連續四個多月的時間得到了一組有用的實驗數據; 4 、得到了裂紋長度與時間的關系、裂紋擴展速度與時間的關系、裂紋擴展速度與裂紋長度的關系。
  10. The computer supported sketching technology, as an extension and important development of computer aided design ( cad ) technology, has been bridging the gap between the freehand sketching on paper and cad, so as to make cad more perfect by supporting the whole process of product design

    計算機支持的草圖設計技術在手繪創意草圖和計算機輔助詳細設計之間架起一道橋,是對傳統cad技術的完和重要發展,也是計算機輔助工業設計( caid )的關鍵技術,它真正實現了計算機技術對設計全過程的支持。
  11. The experiment of falling bar and hopkinson bar were carried out, useful conclusions were made, and good datum was obtained. in chapter 6, based on the results of chapter 5, some improved schemes were put forward, and designed a new structure. the performance of the new structure would be improved greatly

    第六章在根據第五章測試結果中發現的問題,提出了一些改進的方案,對原雙薄板島結構進行了改進,在此基礎上提出了一種新的結構,新的結構在性能上要比原有結構有了很大的改
  12. Based on the inductive analysis to theories, aimed at perfection to software development, the paper expands three modules to the bridge software bridge master about to be developed - - data input system, creep and shrinkage analysis model and pre - stress analysis model

    本文以理論歸納分析為基礎,以軟體開發完為目的,對擬開發的橋軟體bridgemaster擴充了三大模塊? ?數據輸入系統、徐變收縮分析模塊及預應力分析模塊。
  13. Modeling the general solid web continuous box girder and opening - in - web ( open web ) continuous box girder by ansys finite element modeling tool, node stress of governing section and corresponding shear lag values are analyzed. the solution is validated by comparing with variational results and modeling test values. based on the model, the section shear lag induced by dead load, prestress tendons and car loads under the most unfavorable condition and lateral symmetry are also approached. the influence of shear lag effect in double - level continuous box girder is considered with opening - in - web and the web location. the analysis indicates that double - level - load arouses less shear lag effect than one - level - load. when self - weight and prestressed tendons act on together, the shear lag effect on box girder take on a evidently change

    基於所建立的有限元模型,本文分別對實腹和腹板開孔兩種箱在恆載、車載、預應力荷載作用時,各主要截面的剪力滯效應進行分析,通過施加縱向最不利的和橫向對稱的車輛荷載,研究實腹連續箱和空腹連續箱在承受雙層荷載和單層荷載時引起的剪力滯效應,並考慮腹板開孔及開孔位置對于連續箱剪力滯效應的影響。分析表明,雙層車載對于箱引起的剪力滯系數比單層車載的影響要小,對于箱中存在引起的剪力滯后現象有一定的改作用。
  14. The prestressed continuous beam - arch composite bridges are a special structural system where the horizontal thrust of the arch rib is absorbed by a prestressed tie at deck level. in some cases, this type of structure is preferable because it does n ' t have the large thrust at the spring hi traditional arch bridges and the somewhat large bending moment and shear force in traditional beam bridges. as a result, the performances of the prestressing reinforcement can be efficiently utilized

    它利用拱肋承擔壓力,系預應力束抵抗拱端推力,吊桿及縱橫橋面系結構承受橋面荷載,既克服了傳統拱橋巨大的拱端推力,又改了連續橋較大的彎矩和剪力的受力狀況,最大限度地發揮了拱混凝土和預應力鋼筋各自的特點,經濟效益顯著。
  15. It ’ s an important task for us to do some research and try to find approaches to solve the " bottleneck " problems. because of the defect in our nation ' s market system, indirect financing through banking is the main way for smes. so one effective way to cope with this problem is to establish credit guarantee system of smes

    由於中小企業在競爭中處于相對弱勢地位,各國尤其是市場經濟發達的國家均對中小企業在政策上給予一定扶持,這其中最重要的措施就是建立和完中小企業信用擔保制度,為中小企業和銀行等金融機構架起「橋」 。
  16. This world further evolved with the bridges becoming more like hammocks, and the cities resting on top of the curves

    設定進一步完後,橋更接近於吊床,城市坐落在橋拱上。
  17. Place : lok sin tong leung kau kui college

    地點:樂?琚書院
  18. The author hoped professors give some precious advices for the thesis and this technology to develop it

    最後學生懇請教授們對論文及「預應力錨桿肋支護技術」提出寶貴意見,以使該技術能進一步完成熟。
  19. Abstract : heating curves of billet for heavy rail in reheating furnace are measured by use of dragging coupling methods. effects of fuel consumption, furnace temperature and heating time on billet temperature are studied and current thermal schedule of reheating furnace is evaluated, which provides the basis for optimizing and improving thermal schedule of reheating furnace

    文摘:運用拖偶法測量了重軌鋼坯在軌加熱爐內的升溫曲線,分析了燃料消耗、爐溫與加熱時間對鋼坯溫度的影響,評價了現行的加熱爐熱工制度,為優化、完加熱爐熱工制度提供了依據。
  20. In order to adjust structure of production 、 meet requirement of market and improve economic benefit 、 cancel old mould casting system , pangang decided to enlarge continuous casting ratio and eliminate mould casting system , pangang decided to install one new bloom casting machine 、 one new 130t lf plants 、 one new 130t rh degassing plants 。 this rh can treat 1000000t molten steel in every year , it meet mostly request of the rail mill that they produce high quality and high speed heavy rail 。 the writer is a stuff member of this project

    攀鋼公司為了改產品結構、增強市場竟爭能力和提高經濟效益,淘汰落後模鑄系統,決定擴大連鑄比並淘汰模鑄,新建一臺六流方坯連鑄機、一臺rh真空處理精煉裝置、一座lf爐。這臺新建rh真空處理裝置年處理鋼水100萬噸,主要滿足軌廠生產優質高速重軌和型鋼的要求。作者作為該項目的三電部分主要參與人。
分享友人