梁式吊具 的英文怎麼說

中文拼音 [liángshìdiào]
梁式吊具 英文
balkengehnge
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • : hangsuspend
  1. Considering special form of the boiler frame, the reconstruction and enforcement method, in addition dynamic analysis are given by particular steps : establishment of the model of boiler steel frame, determination of earthquake loads and distribution form, and anti - side force system for the frame to model and analyze, involving loads on the frame and above it, earthquake loads, damping, sway control installation, hanging bar and plate beam

    考慮鍋爐構架鋼結構的特殊形,研究並提出了電站鍋爐鋼結構改造加固研究方法,及動力分析的體步驟:建立了鍋爐鋼結構動力分析模型、地震荷載分析方法、建立了鍋爐鋼結構布置型、及整個鍋爐鋼構架抗側力體系模擬分析方法。體包括:鋼構架本體及構架上荷載、地震載荷與阻尼系數確定、制晃裝置確定、桿與大板簡化。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存工程、孔道壓漿工程、體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎製作和綁扎鋼筋,分底腹板和頂板分別綁扎並裝鋼筋骨架入模;拆裝和液壓兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著振搗為主、插入搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. In addition, the analysis and test for the entire stability and limited carrying capacity are completed and results show that pingsheng bridge is also safe enough. 4. the influence on the static performance for pingsheng bridge of structural parameters, such as rise - span ratio of main cable, stiffened girder rigidity, main tower rigidity and main cable rigidity, is studied

    對平勝大橋和與之有相同結構參數的地錨懸索橋模型進行了動力特性分析,並研究了主纜矢跨比、恆載集度、加勁剛度、主塔剛度、主纜抗拉剛度、索抗拉剛度等結構參數變化對兩類懸索橋動力特性的影響。
分享友人