梁模板 的英文怎麼說

中文拼音 [liángbǎn]
梁模板 英文
beam forms
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 模板 : [土] formwork; mould; shuttering; follow board; form board; match board; match plate; mother plat...
  1. Simulation analysis of the lengthways warp of truck carling outside board

    卡車縱縱向翹曲的擬分析
  2. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了混凝土集裝箱堆場施工工藝與質量控制,工程採用振動和振動棒相結合的小型機械法施工,通過對關鍵工序如:施工測量、場區基層碾壓、二灰層施工、鋼筋施工、施工、混凝土面層的施工工藝與質量控制,表明小型機械法施工能滿足工程需要,工程完成後符合驗收標準,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。
  3. Drawing technique and punching simulation of inside board of veil framework up - transom

    汽車面罩骨架上橫拉延工藝分析及沖壓
  4. The riveting and welding plant of the company has a very strong technical force, the technical personnel makes up more than 1 3 of the total staff, the company can also undertake the manufacture of various metallurgical structural equipment, formwork, gang board, oil tank, water tank, pipeline and dust - collecting and environmental protection equipment of various sizes, the company also undertakes the construction of bridge, concrete building as well as underwater and high - altitude operations from omniberaing etc. no matter what sizes and shapes of the forging and casting spare parts including special - shaped parts, we will never refuse you and promise to satisfy you with best quality and finish the task on schedule

    公司鉚焊廠,技術力量十分雄厚,工程技術人員,佔全體員工的三分之一以上,可以承攬加工各種金屬結構設備油罐水罐管道工程各種型號除塵環保設備,再如橋鋼筋混凝土建築,水下高空全方位作業等,除些之外,關于鑄造鍛造等工作不論大,中,小型部件,也能做到來而不拒,保證,保質,保量按期完成任務。
  5. Tests on mould pressure for void concrete plate

    空心壓力試驗
  6. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed. the material and structure form of support frame are discussed. the design of support frame uses the method of limited state, and also it analyses the integer stability, part stability, and single stability, and then proposes the load analysis of multi - level support frame

    首先,針對轉換層體系及支撐架施工,重點分析了轉換層結構現澆混凝土對側壓力值及對拉螺桿的計算;討論了轉換層支撐體系的形式及構造,詳細論述了基於極限狀態設計的支撐架計算方法,包括縱橫向水平桿的強度驗算、立桿的整體穩定性、局部穩定性、單肢桿件穩定性等驗算,並提出了多層支撐架的施工荷載計算方法。
  7. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    製造由鋼筋工程、工程、混凝土工程、預應力工程、移存工程、孔道壓漿工程、體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹和頂分別綁扎並吊裝鋼筋骨架入;拆裝式和液壓式兩種的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底、后腹、再頂的施工順序和斜向分段、腹水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  8. The designing programs of formwork about a reinforced concrete beam

    某鋼筋混凝土施工方案的設計
  9. Interaction of run - on slab and soil is simulated by “ m ” method, run - on slab is constrained by soil through the vertival and horizontal, advances computing model of new type semi - integral abutment bridge. ( 3 ) this paper takes hengyang dashuiting middle bridge for test supporting project, designs full scale model test which can reflect truly interaction of beam, run - on slab and the embankment behind the abutment of new type semi - integral abutment bridge

    通過「 」法來擬搭與土體之間的相互作用,用豎向彈簧和水平彈簧來實現土體對搭的約束作用,建立了新型半整體式無縫橋的計算型; ( 3 )以衡陽大水町中橋為試驗依託工程,設計了能真實反映新型半整體式無縫橋主、搭以及臺后填土相互作用的足尺型試驗。
  10. The prestressed concrete ( pc ) track girders of straddle - type monorail transit system carryies both the beams and the tracks on which the train runs, so the fabrication must make use of a special formwork because of its high precision

    摘要跨坐式單軌交通系統的預應力混凝土軌道既是承重又是車輛的軌道,其製作精度要求很高,必須採用專用的
  11. Not only t he self - weigh of every beam, the prestressing, the compression on the support of form scaffolding, constriction of concrete, creeping are considered when the inter nal force is calculated, but also the result of displacement and deviation of th esupport and precamber should be taken into consideration

    施工階段的內力計算不僅考慮逐段施工的自重,預加應力,支架的支點壓力,以及混凝土的收縮、徐變;同時還應考慮施工程序,施工中的支座位移、支座偏差和預拱度等的影響。
  12. This paper mainly describes the constructions of the formwork which is used in the monorail transit system in chongqing, and indicates that during the track girders ' fabrication, it is very important to pay attention to steel fabrication, orientation of conduct for tendon passing, the mixing, molding and maintaining of the concrete and the stretching of the prestressed tendon

    介紹了重慶市單軌交通系統中的預應力混凝土軌道梁模板的構造,並闡述了在軌道製作過程中應重點做好鋼筋製作、預應力管道定位、混凝土拌制、成型、養護及預應力筋張拉等工序的工作。
  13. Wooden form will be made as type form for the connection where beam and column, and beam and beam to ensure leveling of connection form

    與柱、交接處用木製成定型,以保證接頭處平整。
  14. Several classical methods of interface element, soil behaviors and structure characters are presented in this paper. the author made great effort on the modeling of the interface element and the underground structure element, while considering the soil obey the mohr - columnb yielding principle, modified the existing beam element for solid rectangle pile and applies this element into thin - wall hollow pile, proposes a kind of board element. some examples are presented in the paper to test these new concepts and corresponding formulas

    本文在總結已有的結構與土相互作用問題中的接觸面單元形式、土的本構關系以及結構的數值擬方法的基礎上,對滿足摩爾庫侖屈服條件的土體材料用常規的薄層單元擬進行了更加深入的驗證,在已有實心矩形截面樁與土相互作用描述式的基礎上推導了薄壁筒樁用擬時與土相互作用分析式,和考慮與土相互作用時用單元擬地下連續墻的分析方法。
  15. The concrete outward appearance quality is the concrete quality manifested intuitively, in view of outward appearance quality question of current bridge foot stall construction, coupled with construction practice, construction technology of steel template paste with water percolation cloth in bridge foot stall construction was proposed

    摘要混凝土的外觀質量是混凝土質量的直觀體現,針對當前橋墩柱施工中的外觀質量問題,結合施工實踐,提出了橋墩柱施工中鋼貼透水布施工技術。
  16. Model board trolley is a non - standard large mechanical equipment for tunnel construction, its main frame is a plate and beam element constructed steel structure

    臺車是隧道施工中二次襯砌用的一種大型非標機械設備,其主體結構是結合的鋼結構。
  17. Firstly, the paper sums up program foundation of the auto design system for the structure of prestressed composite slab, in which object - oriented programming and multi - language programming are discussed emphatically. secondly, the paper illustrates program design of the auto design system in preprocess section, analyses calculation section and postprocess section respectively, in which the function design of the intellectualized collocation, the continuous beam model, the check of the precast slab, auto generation of the calculations and shop drawings is described weightily. finally, the practical design methods and process of the structure system of prestressed composite slab are expatiated by representative example

    在綜述了預應力樓蓋體系以及計算機輔助設計的相關內容,分析了國內外研究現狀,研究了疊合樓蓋的受力機理、抗彎抗剪性能以及經濟指標后,文中首先概括了預應力疊合樓蓋體系自動設計系統的編程基礎,其中重點討論了面向對象程序設計和混合語言編程技術;然後分前期處理、分析計算、後期處理三部分,詳細說明了預應力疊合樓蓋體系自動設計系統的程序設計,其中突出描述了程序所特有的智能布置、連續型、預制校核、生成計算書及施工圖等功能的設計;最後用實例講述了預應力疊合樓蓋體系的實際設計方法及步驟。
  18. Application of construction products in structures - part 2 : prefabricated timber formwork beams

    結構中建築產品的應用.第2部分:預制的木材
  19. Prefabricated timber formwork beams - requirements, classification and assessment ; german version en 13377 : 2002

    預制的木材.分類和評估要求;德文版本en 1337
  20. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人