梁段 的英文怎麼說

中文拼音 [liángduàn]
梁段 英文
sections
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  1. ( 4 ) the instability problem of the columniation supporting was solved in the construction of side - span. ( 5 ) the circle - steel nip - patch anchor was applied for the thread - snap of the prestressed crude steel wire, the double facility anchor was used for deeling with the slip - wire of steel wring

    ( 4 )在邊跨直線施工中,採用一端設立柱另一端吊掛在已合攏梁段上的式膺架,解決了支柱支承在古錯落體上的不穩定問題。
  2. It is the key of ebfs, therefore, furthermore calculation about link are carried out in this thesis, introduced achieved research, summarized the affect of link on whole capability in the first, the second, numerical calculation are proceeded on link with ansys : with the purpose of discussing yielding mode critical length of link, established five different specimens ; with the purpose of discussing the influence of h / tw of web, b / tf of flange and h / b, established eighteen different specimens ; with the purpose of discussing the affect of stiffener, established four different specimens, and elaborated the affect of stiffener on link based on achieved test researches

    因此,本文對耗能梁段進行進一步計算分析,概述耗能梁段對整體性能的影響,並利用有限元程序ansys對耗能梁段進行數值計算:針對耗能梁段的屈服類型建立5種不同長度的模型,計算討論耗能梁段屈服類型的長度劃分;針對耗能梁段腹板高厚比、翼緣寬厚比以及梁段截面形狀等因素共建立了18種模型進行計算分析;針對加勁肋對耗能梁段的作用建立了4種模型,並結合已有的試驗闡述了加勁肋對耗能梁段的影響。
  3. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到梁段以外附近區域的作用,在其兩端面上施加了由平面桿系結構分析所得的端面內力,另外,索力和預加力(縱向、橫隔橫向、斜腹板豎向)也施加在相應的位置,分析了箱形主在自重、索力和預應力作用下的空間應力效應。
  4. During cantilever construction of large span cable - stayed bridge steel box girder, the local relative deformation of steel box girder is obviously different between girder to be suspended and girder supporting crane

    摘要大跨度斜拉橋主懸臂拼裝匹配過程中,吊機作用梁段和被起吊梁段由於受力不同,相對變形存在較大差異。
  5. According to these, applying the virtual work theory, this paper analyzed the influence of active beam link on the terminal carrying capacity, stiffness and ductibility of three types of ebsf

    接著在此基礎上應用虛功原理,分別研究了耗能梁段長度對d型、 k型和v型三種偏心支撐框架的極限承載力、剛度以及延性的影響。
  6. Eccentrically braced frames ( ebfs ) combines the strength and stiffness of concentrically braced frames ( cbfs ) with the inelastic behavior and energy dissipation of moment - resisting frames, especially inelastic deformation of link absorbs seismic energy

    偏心支撐框架結合了中心支撐框架的強度、剛度高和普通抗彎框架的延性、耗能性能好的優點,通過耗能梁段的非彈性變形耗散大量輸入結構的地震能量。
  7. Then an thorough computer modeling using finite element program with material, geometry and state triple - nonlinear taken into account is carried out on a series of influencing factors, such as comparison with npn - beam splice connection, comparison of varies designed theories, and the varying of fraction coefficient, diameter, grade, pretension and arrangement of bolts, thickness of web and flanges of beam and column, splicing location, axial loading on column, etc. lots of useful conclusions are drawn form computer modelling. finally, design and construction suggestions are given out. this study fills the black in the field of steel beam - to - column connection with cantilever beam high - strength bolted - splicing at both home and abroad

    然後,本文在考慮材料、幾何和狀態三重非線性的基礎上,對該連接形式進行了全面的計算機模擬,主要考慮了帶懸臂梁段全螺栓拼接的樑柱連接節點與無拼接的樑柱連接及翼緣對接焊接腹板拼接的連接節點的對比,各種設計方法之間的對比,以及翼緣拼接和腹板拼接的螺栓間距、直徑和數量,拼接點與端之間的距離,和柱的翼緣、腹板厚度,柱的軸力,接觸面的摩擦系數,翼緣和腹板拼接板的厚度等因素的影響。
  8. Several formula about the length of active beam link are also introdued

    此外,總結了多種關于梁段長度取值的規定及公式。
  9. This paper applies nonlinear finite element program bsnfem to analyze the behaviors of eccentrically braced steel frames under cyclic load. the study that comprehensive and systematic analyze the factor of links length, thickness of links flange, distance of links rib, thickness of links rib and angle of brace to be changed affect energy - dissipation capacity of d shape and k shape eccentrically braced steel frames have been some studied before. this paper fills the black in the filed factor of high - span ratio, brace stiffness and brace - to - beam connections to be changed affect energy - dissipation capacity of d shape and k shape eccentrically braced steel trames and any factor to be changed affect energy - dissipation capacity of y shape eccentrically braced steel frames

    對耗能梁段的長度、耗能梁段腹板的厚度、耗能梁段翼緣的厚度、耗能梁段加勁肋的間距、耗能梁段加勁肋的厚度、支撐的夾角等因素的改變對d形、 k形偏心支撐鋼框架耗能的影響,前人已有一些研究,本文對這些因素的影響進行了全面系統的分析,完善了理論分析的不足;而結構高跨比、支撐剛度、支撐與的連接形式等因素對d形、 k形偏心支撐鋼框架破壞機理的研究以及各種因素對y形偏心支撐鋼框架破壞機理的影響,則很少有人涉及,本文對此也進行了深入系統的分析,填補了這一研究空白。
  10. During the on - site experiment for full - scale segmental model of the girder, stress and cracks of the side - boxes were surveyed

    進行標準梁段足尺模型試驗,觀測試驗模型橫向預應力鋼束張拉后,主邊箱測點的應變,以及模型表面混凝土裂縫的情況。
  11. 4. wind load has great influence on construction, but the self error of casting girder and basket load have greater influence, especially, basket falling is directly responsible for the safety of construction

    4 .得到風載對施工期可靠度影響比較大,而已澆梁段的自重偏差和掛籃荷載影響很大,特別是掛籃跌落直接關繫到施工期橋的安全性。
  12. ( 2 ) development and application of the light - type cable - stayed hanging - cradle for railway, the hanging - cradle was applied in the construction of large span railway prestressed continous beem bridge, the quality and schedule of the construction was ensured

    ( 2 )開發、應用鐵路輕型斜拉式掛籃,施工大跨度鐵路預應力混凝土連續,保證了工程質量,達到了最快6d澆築t構一對梁段的施工進度。
  13. At the finishing of this paper, the effective identification of designing factors is done and the setting elevation and the cable tension force in next stage are forecasted according to the situation of finished beams. through the forecasting, the constructing state is in coincidence with the designing state. during the bridge construction process, the value of designing parameters are made close to the construction state by means of data collections, optimal controls and detailed analysis of different reasons that caused errors

    最後,根據施工的實際狀態對設計參數進行了有效的識別,並利用灰色理論與預測控制相結合的方法,根據已澆梁段的實際狀況對下一施工梁段的立模標高和斜拉索張拉索力進行預測,使施工過程中的受力狀態與已確定的合理施工狀態達到一致。
  14. 2. the random nature of load construction is analyzed. according to analyze various factors on change of reliability index, casting girder 、 construction live load 、 concrete intensity 、 wind load 、 construction distribution load deviation and basket falling, which influence on construction reliability of rigid frame bridge with high - pier and large - span, are obtained

    2 .研究了各施工荷載的隨機性,通過分析各種影響因素對可靠指標的變化程度,得到已澆梁段、施工分佈活載、混凝土強度、風載和施工荷載偏差以及掛籃跌落等對高墩大跨剛構橋施工期可靠度的影響。
  15. Making reference to the anqing changjiang river highway bridge construction and the construction control, firstly, this paper studies the philosophy of the cable - stayed bridge construction control simulation analysis systematically, and pays much attention to the theory of simulating the construction process : backward analysis and forward analysis. then on the basis of introducing the construction process of the anqing changjiang river highway bridge, analysis the construction course fully, and analysis comparatively the result of each girder segment construction simulation, and study the variation philosophy of the line style of large cable - stayed bridge during construction

    本文緊密結合安慶長江公路大橋的主施工及施工控制實踐,首先系統地分析了斜拉橋施工控制模擬計算的整體思路,並重點分析探討了斜拉橋施工過程計算的理論:理想倒退分析和實時前進分析,然後在介紹安慶長江公路大橋主橋施工過程的基礎上,全面地計算分析了全橋的施工過程,並且應用施工過程計算結果,對每一個梁段的施工模擬工況進行對比分析,研究了大跨度鋼斜拉橋在施工過程中的線形變化規律。
  16. 962m respectively ). neighbouring segments are linked with bolts and welding. after the girders were segmented, guesseted plates were used with high - strength bolted oints to connect the web plates, and the higher and lower flange plates were butt - welded

    相鄰梁段之間的連接形式為栓焊混合型連接,採用節點板把腹板用高強螺栓連接後上、下翼緣板分別對焊。
  17. In this paper, a two - dimensional analysis of the tanjialiangzi bridge was first performed ; then a segment of the bridge was modeled and a three - dimensional analysis of it were carried out by employing the fem software of ansys ; after a careful analysis of the result of the calculations, the causes of the diagonal cracking in the web of the beam were given out ; and also, in the last part, common steps of damage evaluation of the long - span pc continuous bridges through fem software were summarized

    本文首先對譚家子大橋作平面計算分析;然後運用ansys軟體建立該橋局部梁段的空間有限元模型,並在此基礎上進行空間局部有限元分析;通過對計算結果的整理和分析,從設計方面探討了該橋腹板斜裂縫產生的原因:此後,針對病害成因,本文提出了裂縫修補和腹板加固的方法;最後總結了運用有限元軟體分析同類橋病害的一般方法。
  18. Design of ship for transporting module of highway bridge over yangtze river

    長江公路大橋梁段專用運輸船設計研究
  19. The beam end displacement due to beam and column deformation may be calculated by existing cantilever program and then converted by geometric relation

    梁段、柱變形引起的外端撓度可利用已有懸臂柱低周交變加載模擬程序計算,再通過幾何關系換算得到。
  20. So, the analysis about response and collapse mechanism of ebfs under seismic loading are not only significant in theoretical aspect, but also important in practice

    因此,分析偏心支撐框架在地震作用下的響應以及提出改善耗能梁段的建議,不僅具有理論意義,而且具有很大的應用價值。
分享友人