梁頂面 的英文怎麼說

中文拼音 [liángdǐngmiàn]
梁頂面 英文
top surface of the beam
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎石平擱簡支、柱架榫卯連接、柱高不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了量化分析和實驗研究: (一)通過木柱石礎靜摩擦試驗,測定了柱腳與石礎古鏡間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通過單柱承載力試驗,測定了古建築中木柱的受力變形特徵、破壞模式、及模型材料的變形模量、極限承載力、極限變形等參量; (三)通過柱架低周反復荷載試驗,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載試驗和受壓試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承載力及受力變形規律; (五)通過抬式殿堂間架模型振動臺試驗,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  2. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方看,在風荷載、地震作用下,肋拱基本滿足要求,個別排架橫不滿足要求,肋拱連系普遍不滿足要求;計入水平橫槽向地震作用的工況為設計控制工況。
  3. In general, the top surface of the beam is acted upon by transverse loads.

    橫向載荷作用一般認為在上。
  4. Inquiring into coal extraction by caving face with steel beam in extraordinary geologic zone

    型鋼煤工作在特殊地質構造區域採煤的探索
  5. Application of wire meshes beam and cable anchor in large fault roadway of composit roof

    網索支護在復合板大斷煤巷中的應用
  6. Problems occured in the anchoring of overhung tourist hall on top of the tv tower and tower drum due to construction mistakes. it was introduced in this paper that two non - binding prestressed girder beams are respectively set in corresponding locations as the anchor beam of overhung radial support beam of tourist hall, thus the integrity of the tower drum and transmission of the load were guaranteed

    由於施工失誤,作為電視塔的外懸游覽廳和塔筒間的錨固發生了問題,本文介紹了採用在相應位置設置兩根無粘結預應力大樑分別作為游覽廳屋和樓徑向懸挑支承的錨固,確保了它和塔筒的整體性和荷載的傳遞。
  7. Class 1 - residential / light commercial snow melt : recommended for residential and light commercial walkways, driveways, entrances, and other light traffic ways, ramps and building entries

    冰雪融化系統實際上可安裝在任何地方,如停車場、車道、裝卸區、橋、人行道、戶外階梯、檐槽、屋天溝、屋、下水管道,大約地表5厘米下的混凝土中。
  8. The contents include : based on the previous research and the data of experimentations, the author researches and develops a kind of satisfactory semi - empirical formula of nonlinear temperature distribution, and calculates the temperature stress of rigid - framed arch bridge by the fem. the temperature effects of bridge structure by annual and sunlight temperature difference are discussed, it indicates that the temperature effect of annual temperature difference is small but the temperature effect of sunlight temperature difference is great and the temperature stress along beam depth resulted from sunlight temperature difference is nonlinear. with the comparison between the temperature effects of different position of bridge, the results show that where the section of bridge is small, the temperature stress of it is large

    本文主要包括以下內容:從理論上研究並結合實測資料發展了一種比較理想的半經驗溫度場非線性分佈公式,並將有限元方法應用於剛架拱橋結構溫度應力的計算中,對橋結構進行整體溫度應力分析;討論了年溫差和日照溫差引起的橋結構的溫度效應,表明年溫差引起的溫度效應較小,而日照溫差引起的溫度應力較大且沿高呈非線性分佈;分析比較了橋結構各個部位的溫度效應的大小,可知截越小溫度拉應力越大,受力越不利;並對箱結構由於構造不同引起的縱向與橫向的溫度效應大小進行了探討,發現在板下緣也會出現相當大的溫度拉應力,並且梗腋的存在反而增加了板底部的溫度拉應力;還對幾種相近的剛構式橋型的溫度效應進行了分析對比,總結了這些橋型針對溫度效應的優劣,並提出相應的針對性措施。
  9. She stared around herself with pleasure at exposed ceiling beams, gleaming copper brass pots, an oak island, a built - in oven and microwave with surface stove top

    她興致勃勃地環顧四周,看著那些全暴露的天花板橫,若隱若現的黃銅鍋,一個橡木灶臺,一個卡式爐和一個平式微波爐。
  10. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存工程、孔道壓漿工程、體封端工程、橋防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移的施工方法;壓漿、封端、橋防水層和保護層施工的一些規定和注意事項等都是對箱製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  11. Application of type built - up roof beam in face of steep coal seam

    型組合在急傾斜採煤工作的應用
  12. For example, frp reinforced concrete is used to support or surround magnetic resonance imaging ( mri ) medical equipment, and frp is also used for the constructions of some seawalls, industrial roof decks, base pads for electrical and reactor equipment, anchor in rock and ground engineering and concrete floor slabs in aggressive chemical environments in order to promote the wide usage of frp and frp reinforced concrete structures, financed cooperatively by nationa l natural science foundation ( item : the research on mechanical performance of frp reinforced concrete beam reinforced ; number : 59978046 ) and henan illustrious youth science foundation, connected with the analysis methods of modern steel reinforced concrete structure, the thesis further studies the flexural performance of frp reinforced concrete beam through the systematic study on experimental data got from this kind of beams, systematically establishes the theoretical calculating system of the flexural performance of frp reinforced concrete beam in cooperation with the up - to - date analytical methods for reinforced concrete, which suits the properties of frp

    例如,纖維增強塑料筋應用於支撐和圍繞磁共振成像醫療設備的混凝土中及海堤、工業棚、電設備、反應設備的基座、巖土工程中的錨桿、侵蝕性環境的混凝土結構等海洋工程、橋工程、路工程、巖土工程、醫療及化工工程的建設。為了推動纖維增強塑料筋及其混凝土結構在工程中的廣泛應用,本文在國家自然科學基金(項目名稱:纖維增強塑料筋混凝土力學性能的研究;編號: 59978046 )和河南省傑出青年基金的資助下,通過對纖維增強塑料筋混凝土正截受彎性能試驗數據的系統分析,結合現代鋼筋混凝土結構學的分析方法,對纖維增強塑料筋混凝土正截受彎性能進行了深入的研究,較系統的建立了適合於纖維增強塑料筋特點的纖維增強塑料筋混凝土正截受彎性能的理論計算體系。
  13. In the room always demonstrated the area 2, 500 square meters, the mainhall main body is in 5 goes against steel frame liang to construct, the length 40 meters, the width 32 meters, the height 30 meters, twohosts unfold the area area 1, 000 square meters, selects the height13. 5 meters

    室內總展示積2500平方米,主館主體為5層中鋼架建築,長40米,寬32米,高30米,二層主展區積1000平方米,挑高13 . 5米。
  14. According to physiognomy, the bulk density changed as the following order : upland > hills > hillslopes > gully slopes, the saturated soil moisture arranged as : hillslopes > hills > gully slopes > upland, while field capacity and wilting moisture are as follows : gully slopes > hills > hillslopes > upland

    在地貌上,土壤容重呈現出塬溝坡坡,飽和含水量呈現出塬溝坡坡,田間持水量和萎蔫濕度均呈現出溝坡坡的趨勢。
  15. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板、內支撐、吊桿、懸吊、底等的應力和變形,並對比吊箱圍堰板計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  16. The thesis verifies the availability of ductility detailings of elements prescribed by code through comparing the actual rotation capability of both ends of columns and beams obtained from inelastic dynamic analysis and the maximal rotation capability which columns and beams can possess through adopting the detailings in the code

    本文通過對分析所得的、柱端實際塑性轉動和採用規范構造措施后的構件可能具有的轉動能力進行對比檢驗了規范構件延性構造措施的有效程度;並再次確認了柱截尺寸沿高度收小(變截)以及當部樓層柱軸壓比小於0
  17. This thesis aims to analyze how to select and assign prestressed tendon, how to design anchorage bearing joint, how to control the crack, how to calculate the axial prestressed force and the third moment and how to design the edge column of top layer. on the base of the research in and out our country and construction of the prestressed structure, some helpful conclusion and suggestion are presented, which is suggestive for the design and construction of long span continuous prestressed concrete frame

    本文將綜合設計與施工兩個方,對預應力筋的選用、布置,錨固區的設計及構造處理,裂縫問題,側向約束對軸向預壓應力及柱中第三彎矩的影響,層大跨邊柱設計等幾個問題進行系統的分析研究,並在國內外研究和大量工程實踐的基礎上,提出了一些建議和預防措施,對此類工程設計和施工有一定的參考價值。
  18. It indicates that although this procedure has introduced the mechanistic - empirical method, but still is not perfect in design theory : one is about bearing capacity evaluation method and device. the currently used device - benkelman beam is dropping behind the development of the pavement testing service ; the other is about the mechanistic method that used in overlay design. it simplifies the original pavement and subgrade as a whole half infinite space, this is not true in the real layered pavement structure

    綜合分析了各種罩設計方法的原理及其優缺點,對於我國目前設計規范中所採用的罩設計方法進行了詳細的分析與研究,指出了它雖然已經採用了力學與經驗相結合的設計方法,但仍然存在著明顯的不足之處:一方是舊路承載能力評價設備仍然採用貝克曼,檢測手段落後;另一方,在力學設計方法中,對于舊路承載能力的評估忽略了舊路結構的分層,而是採用了近似的彈性半空間體,給出了舊路的綜合回彈模量。
  19. In recent years, during the detection of the established reinforced concrete or the prestressed concrete box girder bridges etc. the large structures, we can find that the concrete in particular structural positions such as the anchorage zones of prestressed reinforcement with dense reinforcement, the prestressed pipe in which the space of reinforcement or the thickness of concrete cover is small, the top and bottom flange of box girder and so on has brought great difficulty to concrete construction because of the small size and densely - packed reinforcement

    對于變截t、工字、箱等常見結構,截形式復雜,一些部位尺寸較小且密集配筋,如板,底板,預應力管道間,混凝土不可避免的造成不密實導致耐久性降低,而這些問題往往為設計者所忽略。對于新建橋混凝土的密實度問題,尤其是新建橋關鍵部位的混凝土密實度和耐久性問題,人們研究和關心的較少,這也為橋的質量監督控制和使用壽命埋下了隱患。
  20. After dry season, the soil moisture changes as the follow trend : gully slopes > hills > upland > hillslopes, while after rainy season, it is as follows : gully slopes > upland > hills > hillslopes. in addition, the soil moisture has obvious vertical distribution characteristic in the slope

    一般規律是:旱季之後,土壤含水量表現為溝坡坡;雨季之後,土壤含水量表現為溝坡塬坡。
分享友人