構架橫梁 的英文怎麼說

中文拼音 [gòujiàhéngliáng]
構架橫梁 英文
truck transom
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • 構架 : carcass; panel work; frame; buck; blind; reinforcement; thripple; backbone; framework; truss; fra...
  1. The main frame is welded structural steel to which are bolted the channel iron lift support beams

    主要框是焊接結鋼,其中以螺栓渠道鐵升降機來固定
  2. The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time

    無骨體系的主要承重件是密肋夾芯板(包括樓板和墻板) ,縱、墻相交處設鋼筋混凝土造(連接)柱,墻板和樓板相交處設連系(圈),連系和柱主要起連接和傳遞荷載作用,也承擔少部分荷載。
  3. The cross girder center segments of the bents were field bolted.

    構架橫梁的中間段在工地用螺栓連接。
  4. Two structures that experienced cracking in the longitudinal girder web at x-type cross-frame are reviewed in detail hereafter.

    以下將詳細評論在縱腹板與X型向框連接處開裂的兩座結
  5. A special steel spreader beam was used to erect the fabricated cage in its proper position in the roadway structure.

    使用一個特製的鋼托來安裝預制的錨固的鋼筋骨,使其就位於上部結內預定的位置上。
  6. 2 ) the structure elements should be laid out symmetrically and uniformly when designing steeve - arch structure, what ' s more, the reasonable selection of section geometric size near the arch foots of first beams is paid attention to and the arrangement difficulties of steel bar due to the big eccentric pressures 2, the analyses of anti - seismic features on transverse direction of the aqueduct l ) the method of adjusting the elements " mass can be harnessed in order to even the layout of seismic loads

    2 )設計吊桿式拱支承結時,各部分件應當均勻對稱布置。另外,還應注意頭道拱腳附近截面的尺寸擬定,克服地震內力造成的大偏心受壓狀態給結配筋設計增加的困難。 2 、槽向抗震性能分析1 )可利用調整件質量的方法,使得結的某些件的地震荷載分佈均勻一些。
  7. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱頂面有保護層剝落、箍筋外露,結基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震作用下,肋拱基本滿足要求,個別排不滿足要求,肋拱連系普遍不滿足要求;計入水平槽向地震作用的工況為設計控制工況。
  8. Equipment disposition : the standard disposition is single raodway, special components such as double roadway girden frame, high resistance stress frame of triangular bridge type can be used

    器材配置:標準配置為單車道,可選配雙車道、高抗剪等專用件。
  9. Two structures that experienced cracking in the longitudinal girder web at x - type cross - frame are reviewed in detail hereafter

    以下將詳細評論在縱腹板與x型向框連接處開裂的兩座結
  10. The contents include : based on the previous research and the data of experimentations, the author researches and develops a kind of satisfactory semi - empirical formula of nonlinear temperature distribution, and calculates the temperature stress of rigid - framed arch bridge by the fem. the temperature effects of bridge structure by annual and sunlight temperature difference are discussed, it indicates that the temperature effect of annual temperature difference is small but the temperature effect of sunlight temperature difference is great and the temperature stress along beam depth resulted from sunlight temperature difference is nonlinear. with the comparison between the temperature effects of different position of bridge, the results show that where the section of bridge is small, the temperature stress of it is large

    本文主要包括以下內容:從理論上研究並結合實測資料發展了一種比較理想的半經驗溫度場非線性分佈公式,並將有限元方法應用於剛拱橋結溫度應力的計算中,對橋進行整體溫度應力分析;討論了年溫差和日照溫差引起的橋的溫度效應,表明年溫差引起的溫度效應較小,而日照溫差引起的溫度應力較大且沿高呈非線性分佈;分析比較了橋各個部位的溫度效應的大小,可知截面越小溫度拉應力越大,受力越不利;並對箱由於造不同引起的縱向與向的溫度效應大小進行了探討,發現在頂板下緣也會出現相當大的溫度拉應力,並且梗腋的存在反而增加了頂板底部的溫度拉應力;還對幾種相近的剛式橋型的溫度效應進行了分析對比,總結了這些橋型針對溫度效應的優劣,並提出相應的針對性措施。
  11. Diaphragm, design of metal - clad post - frame rectangular buildings

    包金屬的柱式框矩形建築物的結
  12. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed. the material and structure form of support frame are discussed. the design of support frame uses the method of limited state, and also it analyses the integer stability, part stability, and single stability, and then proposes the load analysis of multi - level support frame

    首先,針對轉換層模體系及支撐施工,重點分析了轉換層結現澆混凝土對模板側壓力值及模板對拉螺桿的計算;討論了轉換層支撐體系的形式及造,詳細論述了基於極限狀態設計的支撐計算方法,包括縱向水平桿的強度驗算、立桿的整體穩定性、局部穩定性、單肢桿件穩定性等驗算,並提出了多層支撐的施工荷載計算方法。
  13. The eye was, for a long time, wholly lost in this labyrinth, where there was nothing which did not possess its originality, its reason, its genius, its beauty, - - nothing which did not proceed from art ; beginning with the smallest house, with its painted and carved front, with external beams, elliptical door, with projecting stories, to the royal louvre, which then had a colonnade of towers

    久而久之,目光深深陷入這迷宮里,把您也看得出神了,在迷宮里,從那門面雕畫棟、外部屋木頭結、大門扁圓、樓層懸垂的最末等的房舍,直至當時塔樓如列柱林立的富麗堂皇的盧浮宮,無一不是匠心獨運,合情合理,才華溢,美不勝收,無一不是藝術的結晶。
  14. A horizontal or transverse beam, especially a structural member resting on two supports

    ,頂水平的或向的,尤指在兩個支柱上的建築
  15. This paper compares the spatial calculation of piled wharf with simplified plane bent structures ' calculation through selected models, and analyzes the effect on the simplified transverse beam at different location of the crane, so as to obtain the distribution rule and empiric coefficient of crane load

    摘要通過所選模型進行高樁碼頭結空間計算與簡化的平面排計算對比,分析門機不同位置時傳遞到所簡化的作用效應,從而得出門機荷載的傳遞分配規律及傳遞的經驗系數。
  16. Wan zhou yangtze river bridge is the establishing large span steel truss bridge now, and the property of it is the lower stiffness of the main girder. when the speed is high, the analyses and the vibration control of vehicles and bridge are very important, especially the dynamic lateral response of the system

    萬州長江大橋是目前在建的大跨度鋼桁拱橋,其特點是主剛度較小,在高速行車速度下,對起車橋耦合振動分析及其控制尤其是車橋系統向動力響應研究則尤為重要。
  17. Then, a step - by - step increase of vertical curvature is applied to the hull girder assuming that the plane cross section remains plane. at each incremental step, the stress of the cross section is evaluated using the average stress - strain curves of the elements as well as the incremental bending moment due to the curvature increment. performing sample calculations on existing girder models tests under pure bending, the rationality of the proposed method was examined

    假設船體向框材足夠強,因而板的整體破壞不會發生;基於?柱理論、理想彈塑性假設、平面假設,建立了拉伸和壓縮加筋板單元的平均應力?應變關系曲線,應用船體結總縱極限強度的簡化逐步破壞分析方法計算船體總縱極限彎矩,並據此開發了計算程序sus 。
  18. On the base of the link ways of each member joint, the dissertation also puts forth a method to simplify the crossbeam bracing structure into spatial truss , spatial stiff frame and spatial combined structure

    支撐體系根據各桿件結點的連接方式,多簡化為空間桁、空間剛或空間組合結
  19. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁設影響大;懸吊結未完體系(設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人