樁壁 的英文怎麼說

中文拼音 [zhuāng]
樁壁 英文
pilelining
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : 名詞1 (墻) wall (of a house etc ) : 銅墻鐵壁 bastion of iron2 (作用像圍墻的部分) wall of st...
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用基設計規范中的難點? ?端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  2. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋鉆孔壓灌混凝土成技術自研製以來,已在多項復合地基工程中進行了應用,較好地解決了軟弱地層成孔困難的問題,適應地質條件范圍廣,成速度較快,工期短、工效高;與復合地基成時的泥漿護成孔工藝、振沖工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優點;另外,壓入鉆桿內的混凝土為泵送免振混凝土,因此體質量易於保證;與泥漿護和干作業成孔工藝相比,螺旋鉆孔壓灌混凝土成的側阻和端阻都有相應的提高,的承載性能較好,復合地基的變形較小。
  3. Taking the measure of uncorking on the steel tube and filling water before sand filling, the installation process of sand compaction piles is optimized, the installation parameters and testing rate under the near shore condition are confirmed, and the control and testing methods for the piles ' quality are summarized

    採取開孔、先灌水后灌砂的方法,優化了水上擠密砂的施工工藝;給出了在近岸無掩護、水流急的施工條件下的施工參數和檢驗比率,總結了沉定位、高程式控制制、灌砂率等參數的控制措施和檢驗方法。
  4. Digging pile blast hole wall rock soil dynamic parameters detection and assessment

    挖孔巖土動力參數探測和評價
  5. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔施工採用鋼筋砼護確保挖孔的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  6. Approximate three - dimensional analysis of load - carrying behaviour of barrettes

    承載特性的近似三維分析
  7. Handrails and footrails at masts, posts and walls on ships

    船上的扶欄和桅桿上的腳部護欄柱墻
  8. In this thesis, the technological way that prevent the anchorage pile and the concrete of anti - force beam from crazing, and the technological application of ultrasonic determine apparatus to detecting are introduced during engineering of trial pile by inducting prestressed technology to anchorage pile and anti - force frame

    論文還介紹了在試驗工程中,通過預應力技術引入錨及反力梁系統,防止錨和反力梁混凝土開裂的技術途徑,和超聲波側測定儀檢測技術的應用。
  9. By direct shear for and normal triaxial shear tests of non - saturated desert sand, the parper studied the effect of water content and dry density on the strength of the non - saturated desert sand, and set up the code of this sand. based on the plane strain test of non - saturated desert sand slope, the paper analysed the destruction way of the excavaion side during the construction by means of adding water, and brough forward a formule that calculates the allowable of excavation and pile hole

    通過非飽和沙漠砂直剪試驗和常規三軸剪切試驗,研究了含水量和干密度對非飽和砂強度的影響,建立了這種砂的強度準則。通過非飽和沙漠砂邊坡室內平面應變試驗,分析了沙漠井場浸法施工中就基坑的破壞方式,推導出了基坑和孔容許開挖深度的計算公式。
  10. As a new foundation improvement technology, the cast - in - situ concrete thin - wall pipe pile ( pcc pile ) is applied widely in the construction of the highway, civil architecture, haven and sea embankment etc. the pcc pile has a great prospect because it has superiority in the treatment of soils, such as construction period, cost and environment protection

    現澆混凝土薄(簡稱pcc)及其復合地基是一種全新的地基處理新技術,已應用於高速公路、民用建築、港口、海堤等工程建設中, pcc在處理效果、工期、造價、環保等方面具有較大的優越性,因此在地基處理中具有廣闊的應用前景。
  11. But having gotten over these things in some measure, and having settled my houshold stuff and habitation, made meof wall up against it of turfs, about two foot thick on the out - side, and after some time, i think it was a year and half, i rais d rafters from it leaning to the rock, and thatch d or cover d it with bows of trees, and such things as i could get to keep out the rain, which i found at some times of the year very violent

    那是一個搭在山巖下的帳篷,四周用木和纜索做成堅固的木柵環繞著。現在,我可以把木柵叫做圍墻了,因為我在木柵外面用草皮堆成了一道兩英尺來厚的墻,並在大約一年半的時間里,在圍墻和巖之間搭了一些屋椽,上面蓋些樹枝或其他可以弄到的東西用來擋雨。因為,我發現,一年之中總有一段時間,大雨如注。
  12. The technique and application of the cast - in - site bored pile post - grouting construction

    沉井法在挖孔基礎施工中的應用
  13. Performance of cast - in - situ concrete thin - wall pipe pile composite foundation under road embankment

    路堤下現澆薄復合地基工作特性分析
  14. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙鋼沉井圍堰鉆孔基礎,鋼圍堰在橋梁基礎施工中的應用越來越多。
  15. Pretensioned spun concrete thin wall piles

    先張法預應力混凝土薄
  16. Main tower - pile cap construction - stainless rebar tt layer - couplers for walls of main pylon

    主塔帽-鋼筋tt層及供連接主塔韁墻內之鋼筋的聯接器
  17. The design amp; construction of single - wall steel pile cofferdam in deep water

    深水基坑單鋼板圍堰設計與施工
  18. Deformation and slide have taken place at both the surface of the pier and part of the quay walls in wood pile - supported pier in qingdao

    青島港木質高碼頭表面和岸局部發生了變形和滑塌。
  19. Influence analysis of mud on anti - buoyant pile sustain stress

    泥漿對抗浮承載力的影響分析
  20. The reliability is validated further on. 3. the static loading test is modeled by plaxis, based on this, the basic bearing mechanism is analysed which comprise the rule of the load - settlement curves, inner and outer friction resistance, end bearing, stress distribution along pile depth and the dissipation of excess pore pressures

    應用plaxis程序模擬單靜載荷試驗的過程,並根據計算結果較為詳細的分析了pcc單的基本承載特性,主要包括荷載?沉降曲線的特徵、樁壁內外側摩阻力的分佈、端阻力的分佈、的軸向荷載傳遞以及孔壓消散規律等。
分享友人