樓板 的英文怎麼說

中文拼音 [lóubǎn]
樓板 英文
[建築] floor; floorslab
  • : 1 (樓房) a storied building 2 (樓房的一層) floor; storey 3 (房屋或其他建築物上加蓋的一層房子...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  1. The chamber looked such a bright little place to me as the sun shone in between the gay blue chintz window curtains, showing papered walls and a carpeted floor, so unlike the bare planks and stained plaster of lowood, that my spirits rose at the view

    陽光從藍色鮮艷的印花布窗簾縫隙中射進來,照出了糊著墻紙的四壁和鋪著地毯的地,與羅沃德光禿禿的樓板和跡痕斑駁的灰泥全然不同。相形之下,這房間顯得小巧而明亮,眼前的情景使我精神為之一振。
  2. The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time

    無骨架體系的主要承重構件是密肋夾芯(包括樓板和墻) ,縱、橫墻相交處設鋼筋混凝土構造(連接)柱,墻樓板相交處設連系(圈)梁,連系梁和柱主要起連接和傳遞荷載作用,也承擔少部分荷載。
  3. Reduce the use of timber by using alternative structural solutions ( e. g. metal hoarding, system form - work, metal form - work, semi - pre - cast flooring system, pre - cast roofing, dry walls and other structural means such as steel structural section, left - in formwork, etc. )

    改用其他結構方案(例如金屬圍、標準化模、金屬模、半預制樓板系統、預制天面、干墻及其他結構措施,如鋼造結構架和內留的模等) ,藉此減少使用木材
  4. It would result in the floor being rather springy.

    這會導致樓板過柔。
  5. The stiff floor structure has bigger displacement and smaller internal forces. under seismic forces, frame with eiastic fioor has bigger vibration period, and takes on complicated modes of vibration. due to the big vertical rotation, structure with elastic floor shows more prominently coupling vibration of bending rotating and twisting

    如,彈性樓板的結構位移比剛性樓板結構的位移大,內力也是彈性樓板結構的大;在地震力作用下,考慮彈性樓板變形的空間框架振動周期比剛性樓板框架長,而且其振型表現得也比較復雜,由於豎向扭轉位移較大,彈性樓板結構表現出更明顯的彎扭耦聯振動。
  6. Problems and analyses in designing rc floor slabs

    鋼筋混凝土樓板設計中常見的問題及分析
  7. Deteriorated waterproofing of floor slabs or bath - tub seals

    樓板防水層或浴缸封邊殘損。
  8. The monitoring of cracks of floor slab at construction stage

    現澆混凝土樓板裂縫的施工階段試驗研究
  9. Discussion on the deformation analysis of the cracks in cast - in - place floor slab

    談現澆樓板裂縫的變形分析
  10. Discussion on the causes and the countermeasures of the cracks on prefabricated floor slab

    預制樓板沿縫開裂的原因及對策
  11. Safety appraise and handle methods of insufficient in - situ concrete floor slab ' s thickness

    現澆混凝土樓板厚度不足的安全鑒定及處理方法
  12. The early - crack analysis and pre - control of ribbed floor slab placed by pre - mixing concrete

    用預拌混凝土澆制肋形樓板的早期裂縫分析和防治
  13. The system is composed with concrete filled cold - formed square steel tube column, the beam with two cold formed c type steel welded together back to back, the slab with profiled - steel and concrete, the beam and the slab joined into composite steel - concrete beam. they all together make up of the bearing members. and the house also includes the light economical - energy sources heatproof walls

    該體系是以冷彎薄壁方鋼管混凝土為柱、冷彎薄壁c型鋼背靠背高頻焊接組成工字型梁、壓型鋼上現澆築混凝土組成組合樓板並與梁一起構成組合梁作為承重構件,以輕質節能保溫型墻體作為圍護結構組成。
  14. The two systems, connected by inextensible link members, are assumed to resist the full external horizontal forces at floor levels.

    這兩種體系借無彈性的連桿聯結,人們假設用它們抵抗各樓板的全部水平外力。
  15. The second-floor framing was not appreciably affected and only a few of the first-floor joists were fractured.

    第二層樓板構架所受影響較小,只有第一層樓板少數托梁裂斷。
  16. The floors are to be built with hollow tiles or with lightweight aggregate.

    樓板計劃用空心磚或輕骨料建造。
  17. The unsymmetrical arrangement of shear walls in the building cause the diaphragms to rotate and translate.

    建築物內剪力墻的非對稱布置引起了樓板轉動和平動。
  18. Elastic theory and plastic theory are adopted in the analysis of the two section composite beam. elastic theory suggests, on the condition of the same steel beam section size, the composite beam for the floorslab is suited lower flanges convertion section stiffness cuts down by 75. 1 %, elastic limit bending resistant capability cuts down by 47. 9 %, than the composite beam for the floorslab is suited on the top flange. it s conversion section stiffness is lifted 8. 0 %, elastic limit bending resistant capability is lifted 0. 20 %, than the steel beam

    彈性理論分析的結果表明,在鋼梁截面大小相同的條件下,樓板位於鋼梁下翼緣的組合梁和樓板位於鋼樑上翼緣的組合梁相比,其換算截面剛度降低75 . 1 ,梁的彈性極限抗彎承載力降低47 . 9 ,樓板位於鋼梁下翼緣的組合梁和純鋼梁相比,其換算截面剛度提高8 . 0 ,梁的彈性極限抗彎承載力提高0 . 2 。
  19. But the board floor was scrubbed clean

    可是樓板是擦得光亮的。
  20. To enhance floor rigidity, not means to increase floor thickness. with all the building shape and location of anti - shear member known, shear error can not be limited within 8 % compared floor rigid assumption to elastic assumption

    在建築體形及抗側力構件的布置均已確定的前提下,單純靠增大樓板的厚度並不能把按剛彈性計算的剪力誤差值控制在8以內。
分享友人