樓面總面積 的英文怎麼說

中文拼音 [lóumiànzǒngmiàn]
樓面總面積 英文
gross floor area (gfa)
  • : 1 (樓房) a storied building 2 (樓房的一層) floor; storey 3 (房屋或其他建築物上加蓋的一層房子...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ動詞(總括; 匯集) assemble; gather; put together; sum up Ⅱ形容詞1 (全部的; 全面的) general; o...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • 樓面 : [建築] floor樓面板 floorboard; floor plate; 樓面面積 floor area; 樓面系統 floor system
  1. Student dormitory - 4 floors on the ground, total building area 3, 422 m2

    學員生活大地上4層,地板3 , 422
  2. Dining will be a key element in the success of megabox. approximately 280, 000 sq ft of dining space will be allocated to more than 30 restaurants to serve tempting delicacies from all over the world. two floors of space have been dedicated to " chopsticks ", an area for the enjoyment of chinese cuisines

    為打造色香味俱全的購物樂趣, megabox落成後有超過30間食肆,共約28萬平方尺,包羅環球特色美食其中兩層命名為喜筷,以匯聚大江南北美食為主題。
  3. It was the official residence of the successive yanshenggongs i. e. confucius direct descendants. after several times of enlargement and renovation, now it covers more than 160, ooo square metres, with 463 halls, chambers and rooms

    孔府,舊稱衍聖公府,西與孔廟毗鄰,為歷代衍聖公的官署和私邸,經明清歷次維修擴建,而具現有規模,約萬余平方米,房廳堂共間,九進院落。
  4. The company covers an area in total of 120, 000 square meters, and the total area of workshop is 70, 000 square meters, there are modern buildings and spacious workshops in the factory

    本集團佔地達到十二萬平方公尺,廠房達到七萬坪方公尺,在綠茵茵的廠區內林立著建築優美的辦公大與現代化廠房。
  5. Reports the facility is 90 - thousand square meters and connects to shopping centers, office buildings and apartment blocks through a series of tunnels

    上海新聞晨報報導,該設施達9萬平方米,通過一系列通道與商場辦公以及公寓相通。
  6. The shanghai morning post reports the facility is 90 - thousand square meters and connects to shopping centers office buildings and apartment blocks through a series of tunnels

    上海新聞晨報報導,該設施達9萬平方米,通過一系列通道與商場辦公以及公寓相通。
  7. The shanghai morning post reports the facility is 90 - thousand square meters and connects to shopping centers , office buildings and apartment blocks through a series of tunnels

    上海新聞晨報報導,該設施達9萬平方米,通過一系列通道與商場、辦公以及公寓相通。
  8. The move demonstrates the confidence of both companies in the chinese economy. subject to final agreement, applicable laws and regulatory approvals, it is proposed that one of the two high - rise towers of shanghai ifc be named hsbc buildingshanghai ifc

    上海國金中心兩座辦公的其中一座,擬命名為匯豐銀行大-上海國金中心,匯豐將入駐共20層辦公約為53 , 000平方米。
  9. At an elevation of more than 3, 700m, the potala occupies an area of more than 360, 000m. its 13 - story main portion rises 117m. the whole complex, consisting of halls, stupa - tomb halls where the relics of the supreme lamas are preserved, shrines, prayer rooms, monks dormitories and courtyards, is recognized as the world s highest and largest castle palace

    布達拉宮海拔3700多米,佔地36萬余平方米,建築13萬余平方米,主高117米,共13層,其中宮殿靈塔殿佛殿經堂僧舍庭院等一應俱全,是當今世上海拔最高規模最大的宮堡式建築群。
  10. At an elevation of more than 3, 700m, the potala occupies an area of more than 360, 000m. its 13 - story main portion rises 117m. the whole complex, consisting of halls, stupa - tomb halls ( where the relics of the supreme lamas are preserved ), shrines, prayer rooms, monks dormitories and courtyards, is recognized as the world s highest and largest castle palace

    布達拉宮海拔3700多米,佔地36萬余平方米,建築13萬余平方米,主高117米,共13層,其中宮殿、靈塔殿、佛殿、經堂、僧舍、庭院等一應俱全,是當今世上海拔最高、規模最大的宮堡式建築群。
  11. Rising over 13 storeys and covering a total area of 13, 862 square metres, the william m. w. mong engineering building is located on the central campus. the building provides purpose - designed and state - of - the - art teaching and laboratory facilities for the departments of automation and computer - aided engineering, information engineering, and systems engineering and engineering management. it is equipped with a multi - media lecture theatre with 243 seats

    高十三層,達一萬三千八百六十二平方米,內設先進的教學及科研設備,為自動化與計算機輔助工程學系、訊息工程學系及系統工程與工程管理學系提供教研及辦公地方,大並擁有一個可容納二百四十三人的多媒體演講廳。
  12. The floor area of the main building reached 250 thousand square meters after expansion

    目前正在進行老大翻建,到1996年10月營業將達2
  13. The maximum permitted gross floor area is 7. 98 million square metres

    可建樓面總面積為7 9 8百萬平方米。
  14. Total gross floor area

    整體樓面總面積
  15. Gross floor area gfa

    樓面總面積
  16. Gfa gross floor area

    樓面總面積
  17. Phase 2 will occupy seven hectares and provide a total gross floor area of 105, 000 square metres

    第二期佔地七公頃,整體樓面總面積達十萬五千平方米。
  18. The science park will occupy 22 hectares and will be developed in three phases to provide a total gross floor area of 330, 000 square metres

    科學園佔地二十二公頃,共分三期發展,提供合共三十三萬平方米的整體樓面總面積
  19. The hong kong film archive building is a world - class facility. four - storey high, its net floor area of 7, 200 square meters is structurally divided into two big partitions

    香港電影資料館高四層,樓面總面積約七千二百平方米。
  20. Science park phase 1 covers a site of eight hectares. it will have a total of nine buildings providing a total gross floor area of 120, 000 square metres

    科學園第一期佔地八公頃,將會設有九座大,整體樓面總面積達十二萬平方米。
分享友人