模擬中斷條件 的英文怎麼說

中文拼音 [zhōngduàntiáojiàn]
模擬中斷條件 英文
simulated interrupt condition
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : 動詞1. (設計; 起草) draw up; draft 2. (打算; 想要) intend; plan 3. (模仿) imitate
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (細長的樹枝) twig 2 (條子) slip; strip 3 (分項目的) item; article 4 (層次; 秩序; 條...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 模擬 : imitate; simulate; analog; analogy; imitation; simulation模擬艙 boilerplate; 模擬電路 [電學] circ...
  • 條件 : 1. (客觀的因素) condition; term; factor 2. (提出的要求) requirement; prerequisite; qualification
  1. Based on analysis of geologic foundation record about pingzhuang basin, a lot of sino - foreign geothermal geology record and investigation of field geology, measuring of ground temperature in person and geo - chemical analysis of ascension spring, gushing water of fault, the fact that the anomaly of geothermal gradient of pingzhuang basin, which is in region of low geothermal gradient, is caused by redistribution of conduction - oriented geothermal heat flow which is result from upheaval and depression of basin foundation bed is pointed out. after the field of ground temperature is simulated under the background of conduction - oriented geothermal heat flow by means of ansys, the characteristic of ground temperature distribution of top surface of basin foundation bed ( yixian team ) is revealed. the sound condition of transmissibility fault and feeding water source, which are imperative in formation of the low - medium temperature geothermal system of convective type, is possessed in pingzhuang basin

    通過對平莊盆地基礎地質資料、國內外大量地熱地質資料的分析和野外地質調查、礦井實測地溫以及上升泉、層涌水的地球化學分析等工作基礎上,指出地處低地溫梯度背景區的平莊盆地地溫梯度異常是由於盆地基底隆起和坳陷引起傳導型大地熱流再分配所致;運用州sys數值了大地熱流向地表傳導背景下的盆地地溫場,從而揭示了盆地基底(義縣組)頂界面地溫分佈特徵;闡明了盆地具有形成低溫對流型地熱系統所必需的導水裂、補給水源等的良好低溫對流型地熱系統是地熱勘查的主要對象;圈定了平莊盆地北部朝陽溝?駱駝營子地熱勘查遠景區。
  2. Considering that the characteristics of our country ' s highway tunnels are always of long spans, tabular and of various geometry, by means of thorough analysis of the different problems existed in the design of support structures of the tunnels at present, this paper pays special attention to the two key problems, optimization method of form selection of structural section of the tunnel as well as the stability and bearing capacity of the support structures, in the design of the long and large tunnel on high - class highway, introduces the simplified complex - form optimum method in the structure optimization theory, discusses the optimum design model of lining section of highway tunnel with satisfying demands in building clearance, ventilation and load conditions, puts forward an optimization method of form selection of three different kinds of lining sectional forms ( i. e. single - center circle, three - center tabular circle and three - center sharp circle ), establishes a complete set of systematic optimum design the ory and method of long and large tunnel on high - class highway, develops the corresponding computer software used on the planned xuefeng mountain highway tunnel on shaoyang to huaihua expressway in hunan province for optimization of form selections of the structural sections, and obtains a series of relatively reasonable structural design parameters

    本文針對我國公路隧道多為大跨度、扁平、幾何形狀呈多樣化的特點,通過深入分析目前隧道支護結構設計存在的各種問題,抓住高等級公路長大隧道設計隧道結構面的優化選型及隧道支護結構的穩定性與承載能力兩個核心問題,引入結構優化理論的簡易復合形優化方法,深入探討了滿足建築限界、通風、受力狀態約束等下公路隧道襯砌面優化設計型,提出了三種襯砌面形狀(單心圓、坦三心圓和尖三心圓)的優化選型方法,建立起一套完善的高等級公路長大隧道的系統優化設計理論與方法,並開發出相應的計算機程序,用於建的上海至瑞麗國道主幹線湖南省邵陽至懷化高速公路雪峰山長大高速公路隧道的結構面優化選型,得出了一系列較為合理的支護結構設計參數。
  3. In this paper, we begin with actual products designs and then combine the real conditions. on condition that technique conditions requirements were satisfied, by adopting electromagnetic field numerical analysis and experimental research, the electric field distribution inter - phase and to ground of 12kv metalclad withdraw switchgear vacuum circuit breaker is described accurately. the electric field distribution and movement in different conditions are also confirmed

    本文從實際產品設計入手,結合現實情況,在滿足技術要求的基礎上,通過採用電磁場的數值分析及實驗研究,準確地描述了12kv配電系統置櫃真空路器相間及對地全場域電場分佈情況,確定了置櫃在不同情況下的電場分佈、變化情況,通過理論的計算和分析,對產品的絕緣進行了校核與驗證,通過多種方法的比較,進而得到合理的布置結構和達到最佳的絕緣配合,為實際產品的開發和設計提供了理論依據。
  4. According to the geological conditions of baise project, erosive bands and joint fissures, f6 fault and grout curtain are fully simulated to establish 3d numerical model of the dam and its foundation. 3d non - linear fem is used to analyze the stress and strain and to appraise the operation state of both the dam and it ' s foundation under different operation conditions. by overloading the upstream water level and reducing rock strength parameter, the dam foundation ' s degradation process is simulated and the damage pattern and paths are determined, and finally the safety factor is determined

    2 、根據百色的地形地質,充分了蝕變帶、節理裂隙、 f6層、灌漿帷幕等,較為真實地建立了壩體與地基相互作用的整體三維數值型;採用有限元法對壩體及壩基在不同工況下的應力應變狀態開展分析,評價各工況下壩基的運行狀態;而後採用超載法和綜合法對大壩穩定性進行分析,壩基的漸進性破壞過程,從而得到壩基在超載和強度下降過程的破壞式和破壞發展路徑,最終確定壩基超載安全系數和綜合安全系數。
  5. Taking full consideration of the factors effecting on product assembly design and satisfying the performance of product, dfa in concurrent engineering applies many techniques like analysis, evaluation, planning and simulation in the product development process to improve the quality of product assembly design and reduce the cost in the assembly process and the total cost of product. the dissertation is divided into six chapters and the detail contents are summarized as follows : chapter one is introduction

    隨著并行工程研究的逐步深入, dfa技術也在不的發展之,它通過在產品設計過程利用各種技術手段,如分析、評價、規劃、等,充分考慮產品的裝配環節及其相關的各種因素的影響,在滿足產品性能與功能的下改進產品裝配結構,使設計出來的產品是可以裝配的,並盡可能降低裝配成本和產品總成本。
  6. Based on lots of experiments, by combining the progress in mesomechanics with fea computation and analysis, this thesis investigated many parameters " effect on crack with an arc - tip in plain mixed - mode fracture, and compared existing criteria for fracture initiation, fracture direction and fracture mode transition

    本文主要的工作是在試驗的基礎上,結合細觀裂力學當前的研究進展,通過有限元計算和分析,研究了平面復合型各種力學參量對圓弧尖端裂紋裂的影響,比較分析了現有的起裂判據、裂擴展方向的判定方法以及式的轉換
  7. According to the analyses of the research results about the feasibility of 4 - d seismic and the successful 4 - d seismic cases of foreign companies, the author put forward the suggestions for 4 - d seismic pilot area selection ; briefly analyzed the influential function of producing way on the seismic response ; utilized theory calculation, coring data analyses, and reservoir numerical simulation to define the fluid substitution effects on the p - wave velocity. through long time water driven to the reservoir, some of the properties and the log curves have changed, the author tried to find the variation rule of the reservoir and its effects on seismic velocity. the " blind point " in 4 - d seismic feasibility study both in china and overseas was found, that is the lack of consideration of the influence of physical property variation by long time water driven on the seismic response

    在深入分析國外四維地震可行性研究成果和成功實例的基礎上,提出了有利於水驅四維地震成功的工區優選;簡要剖析了各種開采方式及其對地震特性的影響;利用理論計算、巖心分析、油藏數值三種方法確定了流體替代對縱波速度的影響;通過對長期水驅造成的物性參數、測井曲線以及油藏溫度和壓力變化規律的總結,分析了這些變化對地震速度的影響,指出了目前國內外水驅四維地震可行性研究存在的盲區?沒有充分考慮長期注水造成的物性、溫度和壓力變化對地震響應的影響,完善了水驅四維地震可行性研究的內容;在考慮了這些變化因素后,高29塊水驅四維地震可行性研究結果表明:四維地震監測注水前沿可能要比監測油藏變化容易的多;以四維地震巖石物理可行性研究結果為基礎,提出了五個有助於突出四維地震造成的微小差異的途徑,為今後水驅四維地震研究指明了方向。
  8. With the normative research method, this paper at first analyzes the concepts, ideas, characteristics of virtual enterprise and the fundamental model of operation, explains the cause of the origin and evolution of virtual enterprise, advances the original background and definition of virtual construction. by a comparison between virtual construction and traditional project management organization mode, the fundamental conditions of the application of virtual construction in domestic construction industry are analyzed from aspects of the change of project management organization mode, the basis of cooperation and the degree of information modernization. because of the continual development of virtual construction in practice, this paper makes further study on its concept and meaning, gives description of the process and system structure of virtual construction and the select principle of cooperate partner

    首先分析了虛企業的概念、思想、特點以及運作的基本形式,運用交易費用經濟學、戰略管理的相關理論解釋了虛企業產生發展的原因;結合建築行業的技術經濟特點,提出了虛建設的產生背景及其定義,通過虛建設與傳統工程項目管理組織式的對比,從工程建設項目管理組織式的轉變、合作的基礎、信息化程度三方面分析了虛建設在我國建築業應用的基礎;虛建設在實踐地發展,本文進一步解釋其定義及其內涵,描述了虛建設的過程和體系結構以及合作夥伴的選擇原則,分析了虛建設式對建築企業組織結構的影響;結合組織發展的最新趨勢,提出了組織虛化的概念、過程,分析了企業組織結構的演變;最後分析了虛企業在我國建築業的應用前景,提出了推動虛企業在我國建築業應用的建議。
  9. The studies of circulation in ecs were most based on the analysis of temperature and salinity data and diagnostic mode. aim at breaking this limitation, we had established a quasi - predictive model in the ecs by reconstructing the pom model to overcome the difficulties brought to the simulations by steep terrain and great density gradient in the new model, the monthly mean sst data in the ecs and the result of global ocean model were used as the boundary conditions to simulate the distribution of the temperature and the circulation structure in the ecs

    針對以往溫、鹽資料分析和式診方法為主的東國海環流研究的局限性,通過改造pom式,克服因陡峭地形和大密度梯度給帶來的困難,建立了東國海環流準預報式,運用本文第三章獲得的sst資料和全球大區式的結果作為式的邊界了東國海溫度分佈與環流結構。
  10. Dynamical diagnosis, numerical simulation and theory analysis are done on genesis condition, structure, propagation and development mechanism of a mesoscale convective complex ( mcc ) which caused the first torrential rain in the meiyu period of yangtze river and huaihe river basins in june 22 - 23, 2003

    對造成2003年6月22 - 23日梅雨期首場暴雨的影響系統? ?尺度對流復合體( mcc )的環境、結構、運動和發生發展機理進行了動力診、數值和理論研究,探討了預報失敗的原因和改進預報的思路。
分享友人