模擬計算單元 的英文怎麼說
中文拼音 [mónǐjìsuàndānyuán]
模擬計算單元
英文
analogue computer- 模 : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
- 擬 : 動詞1. (設計; 起草) draw up; draft 2. (打算; 想要) intend; plan 3. (模仿) imitate
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 算 : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
- 模擬 : imitate; simulate; analog; analogy; imitation; simulation模擬艙 boilerplate; 模擬電路 [電學] circ...
- 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
-
By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few
通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。A 3 - d simulative calculation program concerning temperature field and creep stress field and its pre - processing and post - processing has been developed. by applying this program, temperature field and creep stress field of hydraulic culvert and sluice engineer concrete is simulated. 2
開發了非穩定溫度場和應力模擬計算的三維有限元計算程序及有限單元法的前後處理程序,運用此程序對水工涵閘工程混凝土進行了溫度場和應力場的計算分析,得出相關結論。After that, it gives the measures of designing dsp ' s assembler as a part of the dsp ' s software development environment together with the c - compiler. moreover, this paper explores the method of design the floating - point arithmetic unit. referring to the ieee754 - 1985 standard for binary floating - point arithmetic, the algorithm and the behavior description of floating - point adder and multiplier is given, and the simulation and verification is shown at the end of this paper
此外,本文還對處理器的浮點運算單元設計做了初步的研究,以ansi ieee - 754浮點數二進制標準為參考,借鑒了經典的定點加法器和乘法器的設計,嘗試性的給出了浮點加法單元和乘法單元的實現模型和行為級上的硬體描述,並對其進行模擬和驗證。The modal neural files ( mnf ) derived from i - deas modal solution were imported into the adams / flex. then the flexible multi body dynamics simulations of the deployable truss system were carried on when the truss is assembled with a spacecraft. the dynamics characteristics of the truss in the moment of folded state and completely deployed state were listed
利用i - deas對桁架單元的模態進行計算,生成模態中性文件,然後將其輸入到adams / flex里與衛星組成柔性空間展開桁架結構模型,進行展開桁架的多柔體動力學模擬計算。The construction of the bridge began in oct 1999, and the closing up of the steel tube was in dec 2000. during that period, i learned and analyzed the current construction methods fairly comprehensively, and collected the construction technique data of the cfst arch bridges having been built. based on this, aided by the simulation of construction procedure using finite element program, i proposed the operation program to make the steel tube segment be located at one time, and the scheme of dividing rooms to segment pouring
大橋於99年10月開工, 2000年12月主橋鋼管合龍,在此期間,本人就目前鋼管混凝土拱橋的施工方法進行了較全面的了解和分析,搜集了此類已建橋梁的施工技術資料,在此基礎上,又藉助有限元程序對施工過程模擬計算的支持,提出了在梅溪河大橋懸臂安裝過程中,鋼管節段一次就位的操作程序和鋼管混凝土分倉灌築的方案,並為施工單位采納應用。Electricity power system computer simulation the computing include the current computing, simple fault computing, complicated fault computing, quiescent stabilization the computing and development stabilization the computing etc. because the computing software of electricity power system are all the earlier words software, it is very difficulty for studying and isn " t easily for using and ca n ' t draw the graphics of the electricity power system ect
對電力系統的運行狀態進行分析需要進行大量的計算,電力系統計算機模擬計算主要包括潮流計算、簡單故障計算、復雜故障計算、靜態穩定計算和動態穩定計算等計算。本文針對當前電力系統計算軟體大多都是早期的字元界面的軟體,學習難度大,不易使用,以及不具備電力系統圖形繪制等弊病,對microsoft公司的visualc + + 6 . 0及其所提供的microsoft基礎類庫( mfc )展開了理論與應用的研究工作。Based on the urgent need that pier protective device primarily designed needed to be tested its crashworthiness by the impact of ship in multi - situation, etc in multi - angle and multi - water, the writer analyzed the critical elements that affect the simulation of the collision between ship and pier protective device, and found the feasible way to deal with the conflict between calculation efficiency and precision. using this method and employing ansys / ls - dyna program, which is the universal nonlinear dynamic analysis software, a head - on collision between ship and pier protective device designed for guanzhou river bridge is simulated and presented, the simulation of time history course of full - scale mini - collision between ship and pier protective device was taken into reality with a spot of elements ( less than 21000 ) and scanty time ( 9 hours on p4 pc )
本文在前人研究的基礎之上,結合船橋碰撞實例,對碰撞計算機模擬模擬的關鍵技術進行了研究,在效率與精度的矛盾中找到平衡,對一艘2000噸級散貨船橫橋向正撞廣東管洲河大橋橋墩防撞鋼套箱這一種工況進行了計算機模擬模擬,實現了以較小的單元和較短的時間模擬碰撞的時間歷程,模擬滿足工程精度要求,解決了目前碰撞模擬計算周期太長的問題,同時模擬模擬得到的結論對該類防撞裝置提供了有價值的參考。Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further
首先,本文在綜合分析隧道穩定性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿錨桿作用力學機理進行了深入研究,為全長粘結式砂漿錨桿的有限元模擬分析奠定了基礎;其次,針對傳統錨桿有限元模擬方法的局限性與不足,在上述全長粘結式砂漿錨桿作用力學機理研究基礎上,建立出能反映界面非線性粘結的新型復合砂漿錨桿有限單元模型;然後,運用上述復合砂漿錨桿單元模型,引進非線性有限元分析手段,開發了隧道支護穩定性分析的有限元程序,並就全長粘結式砂漿錨桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對隧道支護設計具有指導意義的結論;最後,運用本文研究成果對某公路隧道工程實例進行了開挖與支護的模擬計算,探討了其應用方法,並就隧道變形與應力及塑性區分佈規律進行了分析,從而提出了合理的支護方案,為隧道支護設計提供了參考依據,完善了隧道全長粘結式砂漿錨桿支護的理論與方法。Based on the actual construction, a study on the simulative calculation for both the temperature and the thermal stress of the continuous rcc placement for the construction of langtan rcc gravity dam is made with 3 - d finite element method
摘要結合施工過程,應用三維有限單元法,對龍灘大壩連續澆築混凝土的溫度及溫度應力,進行模擬計算的研究。This paper models the failed test by using the finite element method and the results explained the reason of the test failure
本論文通過有限單元法對試驗過程進行了模擬,計算結果解釋了試驗現象。By applying " none homogeneous multi - laminate element ", hong - kou rcc gravity dam ' s simulation computing of temperature field and stress field at construction period and operation period for all courses and many factors. e. some kinds of methods are discussed in detail for temperature field back analysis, and artificial neural network method for back analysis of thermal parameters of concrete is suggested
應用「非均質層合單元法」實現了洪口碾壓混凝土重力壩施工期、運行期全過程多因素的溫度場及徐變應力場的模擬計算,進行多方案的比較分析,推薦出優選溫控防裂方案,取得了非常滿意的成果。In the numerical solution algorithm, the method of characteristics, analytic method and galerkin finite element method ( galerkin - fem ) can be chosen to solve the advective equation, diffusion equations, reaction ( source / sink ) equations, propagation equations and pressure poisson equation, respectively. the developed new algorithm has been verified using analytical solution of circular conduit flow in a reynolds number range of 100 < re < 1 000 and experimental data of the laminar flow over a backward - step facing step. the flow properties are well characterized by this three - dimensional numerical model
本論文在評述三維粘性流動數學模型已有研究成果的基礎上,著重在數值計算方法的選擇和定解條件的給定對數學模型計算結果的影響進行了研究,並首次提出了求解三維純對流方程的高精度的擬協調單元法,建立了三維低雷諾數re流動的數學模型,並在圓管流動、臺階突擴矩形管道流動中得到驗證和應用。Chapter one expatiates the significance and the development in this aspect at present. chapter two calculates the temperature distribution of crude oil in tank based on the finite cell method in resolving space problem and the finite difference method on time issue
第一章首先闡述了該課題的研究意義以及目前在這方面的研究現狀;第二章利用有限單元法及有限差分法對艙內溫度場進行數值計算,得到模擬計算結果。4. beishanzhuang sluice is modeled visually and 3 - d fem simulation analyzed, and the stress and displacement rule of sluice in different fact is calculated and analyzed. the effects of different type of base plate are compared, and steel design of sluice is calculated and analyzed
對北單莊閘進行了可視化建模並對其進行了三維有限元模擬計算,計算分析了各種工況下水閘的應力和位移規律,比較了不同類型底板的效果,對水閘進行配筋計算分析。Based on the experiments, the simulation of the heat exchanger and scroll compressor was accomplished which also offered a favorable condition to the establishment of the whole gwshp methods were used to improve the veracity and astringency of the model, such as : dividing the condenser into several tiny segment with equal area ; separating the condensing process into single - phase region and double - phase region ; the comparing result showed that most of the error between the data of simulation and experiment was within 5 % while the maximal error was 8. 35 %
在建模過程中,從大量蒸發和冷凝的換熱關聯式中,通過與實驗數據的比較找出了與實驗結果最為接近的換熱關聯式在建模過程中,針對冷凝器及板式換熱器的特點,採取將冷凝器按面積分成若干個微元段,並將冷凝過程分成單相區和兩相區的方法。同時對渦旋壓縮機進行建模和分析同時在熱力學平衡基礎上與實驗數據比較,經過驗證,對于換熱器模型,模擬計算與實驗結果的誤差一般都在5以內,最大為12 。According to the forward analysis method based on iterative theory, the simulation calculation procedure of rib - hoisting on the long - span cfst arch bridge is worked out. in this procedure, the finite element theory and the formation of flexible cable unit is analyzed detailed
根據基於迭代理論的前進分析方法,本文編制了大跨度鋼管混凝土拱橋拱肋吊裝模擬計算程序,對程序中的有限元理論、扣索單元的處理進行了詳細分析。Solid65 element in ansys software was used to analyze and simulate these beams, a comparative agreement between theory and experiment on elastic stage was found. but more researches need further to make on plastic stage
此外,用ansys有限元軟體的solid65單元進行數值模擬,計算結果同試驗結果進行比較,發現彈性階段兩者吻合得比較好,但在塑性階段還有待于進一步開展研究。Third, modeling and calculating of blast scheme : modeling and calculation of blast were made with nonlinear dymanic fem software - dyna2d. the effect rule of blast on slope stability was summarized. fourth, analysis and calculation of rock slope stability : the sarma method of limit equalibrium and fem method were used to analyzed the stability of rock slope in the test road part
爆破方案模擬計算:採用非線性動態有限元dyna2d程序,對所做爆破方案進行數值模擬計算,總結爆破對邊坡的穩定性影響規律;邊坡巖體穩定性計算與分析:利用極限平衡分析的sarma法利數值分析的有限單元法,對實驗路段的巖質邊坡進行穩定性分析。Through the correlative theoretic analysis and simulation, this algorithm can be used to finish the initial alignment of the low cost inertial measurement unit
理論分析和模擬計算表明,這種演算法僅受組合系統自身硬體條件的約束,可以較好地應用於組合系統中低成本慣性單元的初始對準。Simulation experiments arc carried out, which verify the validity and efficiency of the new modeling technique for spot - welds of autobody
模擬實例說明,此新型焊接單元,既保證了模擬計算的可靠,又避免了傳統演算法中細化局部網格的處理,減輕了工作量。分享友人