橋壩 的英文怎麼說

中文拼音 [qiáo]
橋壩 英文
bridge dam
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. The old charles river dam : committee on charles river dam, " report of the committee on charles river dam. . to consider the advisability and feasibility of building a dam across the charles river at or near craigie bridge, " 1903

    舊查爾斯河水:查爾斯河水委員會, 《查爾斯河水委員會的報告. . .考慮在克雷基附近建造跨過查理斯河水的合理性和可能性》 , 1903年。
  2. Our “ sun shine ” brand carbon steel fiber have been widely used in road, protection slops of highway, bridges, reservoir dyke, tunnels, airport taxiways, well lids of city project ( guard against theft ), mine laneway, port, railway sleepers and etc, and gain high praise from clients

    本公司「雙興」牌碳鋼纖維廣泛應用於道路,公路護坡、梁、防浪堤、水庫堤、隧道、機場跑道、市政工程井蓋(防盜) 、礦井巷道、港口、鐵路軌道等方面,深受廣大用戶贊譽。
  3. Bridges, dams, and reservoirs have to be built.

    梁、堤和水庫必須修建。
  4. Kinglead hotel chongqing is the famous four - star business hotel set up by the kinglead industry group. hotel covers the area about 7200 square meter and with the architecture area of 3. 2 square meter up to 15 floors. it is located in the crossing of yuzhong, shapingba, jiulongpo, banan and daudukou district in the shiqiaopu high and new technology development distrist of chongqing. and east to the olympic center, west to yugao park, north to tv station of chongqing and nearby the fiest food and beverage street of chongqing service in 24 hours

    酒店總佔地面積7200平方米,建築面積3 . 2萬平方米,樓高15層,位於重慶市石鋪高新技術開發區,地處渝中區沙坪區九坡區巴南區大渡口區交匯點,東鄰奧林匹克中心,西鄰渝高公園北鄰重慶電視臺與重慶「餐飲第一街」毗鄰,確保你每天24小時的任何時段內都能吃到重慶地道美食,讓您商務旅遊生活盡享愜意!
  5. Taking the caiyuanba changjiang river bridge in chongqing as an example, this paper makes a study of the effect of tilting angle of basket handle arch rib on the stability of the overall arch bridge and gives the rational tilting angle of the arch rib, using the finite element method

    摘要以重慶菜園長江大為例,利用有限元方法研究提籃拱的拱肋側傾角對全穩定性的影響,給出拱肋的合理側傾角。
  6. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  7. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運河起自廣東省東莞市頭縣,流經司馬、旗嶺、馬灘、塘廈、竹塘、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘和八級抽水站。
  8. Corrosion protection of steel truss girders of caiyuanba changjiang river bridge in chongqing

    重慶菜園長江大鋼桁梁防腐
  9. This paper presents the corrosion protection system and part of the coating workmanship for steel truss girders of the caiyuanba changjiang river bridge in chongqing

    摘要介紹重慶菜園長江大鋼桁梁的防腐體系及部分塗裝工藝。
  10. The waterproof of the storage, underground grage, bridge, tnnel and subway

    蓄水池、地下車庫、梁、隧道、地鐵、污水池室外游泳池、堤等防水。
  11. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大大體積粉煤灰混凝土技術、南京長江二泵送混凝土技術等提供咨詢建議。
  12. Engineering earthquake safety evaluation of the nuclear power station dam site and brige etc. seismic gonation and microgonation, earthquake disaters estimation and mitigation, engineering structure ' s dynamic characteristic etc

    核電站、大、大型梁等重大工程的地需安全性評價;地震區劃和小區劃,震賃評估、預測及其減賃對策,工程自振特性和環境振動測試,爆破公害的控制設計等。
  13. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修建閘梁、碼頭和其他攔河、跨河、臨河建築物,鋪設跨河管道、電纜,必須符合國家規定的防洪標準、通航標準和其他有關的技術要求。
  14. Sixth venture on jan. 15. 2001 of the lunar year at about 21 : 00in the evening, wang dajun, proprietor of sichuan pictorial, drove the car accompanied by lixiaohong, a photographer from anhui, photographers lipei and guoji from henan, and i on the way from aba to chengdu, the car turned over on a brydge in gutang village. a cliff of tens of meters high was just 20 feet from the car, we were in imminent danger

    2001年正月十五晚上21 : 00與四川的老師們駕車,同行的有安徽攝影家李小紅、河南攝影家李沛、郭際和我從阿回成都,天黑路滑,車輛在理縣石古唐鄉一座上車,車外二十公分外便是高幾十米的懸崖,命懸一線。
  15. Through measuring slope forms on the spot, serried sampling, physical and chemical analyzing, and measuring soil erosion from natural and artificial rainfalls, the project researched in the approaches and behaviors of soil erosion affecting contents of soil carbon and nutrient, and the law of soil carbon and nutrient distributing in micro - topographty under influences of soil erosion. in the same time, supported by geographic information system, models of soil carbon and nutrient changing with soil erosion have been built, and spatial processes of soil erosion affecting soil carbon and nutrient have been simulated, and annual and long - term changing of soil carbon and nutrient under impact of soil erosion have been estimated and forecasted, and synchronously, a elementary assessment for different soil erosion management has b een performed by using the models built in the study

    本研究以三峽庫區秭歸縣水田鄉王家小流域四個徑流試驗區二十個標準小區為研究對象,通過坡形實地測量、坡面密集采樣的顆粒分析和養分含量分析以及人工模擬降雨實驗,研究了土壤侵蝕對土壤碳和養分的影響途徑和表現,侵蝕作用影響下土壤碳和養分在微地形空間的分佈規律;同時,在地理信息系統的支持下,建立了侵蝕條件下的土壤碳和養分變化模型,模擬了侵蝕對土壤碳和養分影響的空間過程,預測了侵蝕影響下土壤碳和養分的年變化及多年變化,並通過研究建立的模型對不同侵蝕控制措施進行了初步的效益評價。
  16. Chongqing mingda locornotive parts manufacture co., ltd ( originated from chongqing jingchuang engine part factory, covering 8, 000 square meters, is located at new bridge industrial zone, shapingba chongqing

    重慶明達機車配件製造有限公司(原重慶精創發動機配件廠)組建於1994年,位於重慶市沙坪區新工業園區,佔地8000平方米,現有員工120餘名,其中工程技術人員佔20 %以上。
  17. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水庫運用后水沙變化這一主要矛盾,通過分析研究以往典型時期的水沙特點和河道演變特點,收集分析河床邊界條件變化資料,小浪底水庫運用后水沙資料變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽水庫運用後下遊河道河勢變化的規律和特點,探索小浪底水庫運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵、鄭州鐵至東頭、東頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河道整治工程建設的規劃和工程安排提供決策參考和依據。
  18. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石原位觀測和反潰分析研究」及「高土石動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  19. Coral lake chienchiao hotel is located inside the wushantou reservoir scenic area and offers excellent vistas of the lake and surrounding countryside in a natural, secluded setting. moonlight views of the lake, to a symphony of crickets and frogs, can bring you closer to nature

    珊瑚潭劍大飯店位於烏山頭水庫風景區內,擁有絕佳的珊瑚潭環湖景緻,以及自然無人為干擾的環境,月夜下的大,蛙與蟲鳴,可讓您充分親近大自然。
  20. This paper presents mainly the layout of monitoring system, monitoring items and operation of monitoring equipment for tianshengqiao concrete - faced rockfill dam

    著重介紹天生一級面板堆石監測系統的布置、監測項目及觀測儀器的運行情況。
分享友人