橋梁支撐 的英文怎麼說

中文拼音 [qiáoliángzhīchēng]
橋梁支撐 英文
bridge bracing
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ動詞1 (抵住; 托住) prop up; support 2 (用篙使船行進) push or move with a pole 3 (支持) mai...
  • 橋梁 : bridge; approach
  • 支撐 : 1 (抵抗住壓力) prop up; sustain; support 2 (勉強維持) support; prop up3 [建築] strut; brace; ...
  1. Midge : it ' s brand new. revolutionary up - lift : no shoulder straps, no back straps, but it does everything a brassiere should do. works on the principle of the cantilevered bridge

    米姬:這是全新的。革命性的改良。沒有肩帶,也沒有背帶,但是所有胸罩的功能它都有。運用懸臂式的原理來
  2. Ceramic welding backups are used for one - sided welding of steel and aluminum alloy with any thickness, instead of two sided welding in shipbuilding industry, marine industry, and heavy mechanical industry. the products are stuitable for the most kinds of welding process such as gmaw, saw, fcaw and seg even with high electric current to produce a satisfactory back bead formation

    陶瓷焊接墊是用作鋼鐵或鋁合金單面焊雙面成型的件,可替代效率低下的雙面焊工藝,被廣泛應用於造船,和重型機械等工業領域的各種焊接( gmaw , saw , fcaw和seg )甚至高電流場合
  3. A horizontal beam, as of steel or wood, used as a main support for a building or bridge

    大樑一水平的鐵制或木製的桁條,用來作為建築物或的主要
  4. They support the cables from which the bridge has been suspended.

    它們著懸吊的纜索。
  5. Abstract : this paper introduces the global stiffness, strength and stability of bracing structure with long span, pointing out that the control of bracing structure ' s deflection and elastic module can make the arch ring fit the line of pressure and arch axis and can guarantee the stability of bridge structure

    文摘:本文介紹了大跨度結構的整體剛度、強度和穩定性,控制的撓度和彈性變量可使拱圈符合設計壓力線與拱軸線,保證結構的穩定性。
  6. This paper mainly makes the research of construction method for cast - in - situ concrete box girder of continuous girder bridge, using assembled highway bridge steel truss ( often known as bailey truss ) as the falsework, technical schemes for the falsework erected over river, particularly the rigid slant supports of the falsework on piers, and analysis, calculation methods and deformation of the falsework in accordance with the related tests in field

    摘要主要研究了採用裝配式公路鋼桁架(通常稱為貝雷架)做為架進行連續現澆箱混凝土的施工方法;研究了跨河施工架的技術方案,特別是施工架在墩上的剛性斜,同時結合現場試驗研究了施工架的分析計算方法及變形。
  7. For example, frp reinforced concrete is used to support or surround magnetic resonance imaging ( mri ) medical equipment, and frp is also used for the constructions of some seawalls, industrial roof decks, base pads for electrical and reactor equipment, anchor in rock and ground engineering and concrete floor slabs in aggressive chemical environments in order to promote the wide usage of frp and frp reinforced concrete structures, financed cooperatively by nationa l natural science foundation ( item : the research on mechanical performance of frp reinforced concrete beam reinforced ; number : 59978046 ) and henan illustrious youth science foundation, connected with the analysis methods of modern steel reinforced concrete structure, the thesis further studies the flexural performance of frp reinforced concrete beam through the systematic study on experimental data got from this kind of beams, systematically establishes the theoretical calculating system of the flexural performance of frp reinforced concrete beam in cooperation with the up - to - date analytical methods for reinforced concrete, which suits the properties of frp

    例如,纖維增強塑料筋應用於和圍繞磁共振成像醫療設備的混凝土中及海堤、工業頂棚、電設備、反應設備的基座、巖土工程中的錨桿、侵蝕性環境的混凝土結構等海洋工程、工程、路面工程、巖土工程、醫療及化工工程的建設。為了推動纖維增強塑料筋及其混凝土結構在工程中的廣泛應用,本文在國家自然科學基金(項目名稱:纖維增強塑料筋混凝土力學性能的研究;編號: 59978046 )和河南省傑出青年基金的資助下,通過對纖維增強塑料筋混凝土正截面受彎性能試驗數據的系統分析,結合現代鋼筋混凝土結構學的分析方法,對纖維增強塑料筋混凝土正截面受彎性能進行了深入的研究,較系統的建立了適合於纖維增強塑料筋特點的纖維增強塑料筋混凝土正截面受彎性能的理論計算體系。
  8. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大高樁承臺吊箱圍堰的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內、吊桿、懸吊頂、底等的應力和變形,並對比吊箱圍堰板面計算變形和施工實測變形,結果是吻合的;對大遼河特大高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  9. The paper has five parts : part i discusses the original cause of the core competence based corporate diversification strategy, and academic and positive researches " sustain of this strategy ' s validity ; part ii demonstrates the essence ' s universal blur of the core competence is the root of difficult to discerning and measuring the core competence itself. and because the base of synergic effect which diversification pursues is blur, the shortcoming of difficult to operating the strategy is exposed ; in order to improve the strategy ' s operating, partlll introduces corporate strategic assets into the strategy to build a bridge between the core competence and corporate diversification. this part clarifies the logic between the core competence and corporate diversification that only if through strategic assets, the core competence ' s competitive advantages can be achieved and corporate diversification must be strategic assets correlative to pursue synergic advantages ; basing on the above discusses, partiv modifies the old strategy properly, and then designs the core competence based strategic assets correlative corporate diversification strategy mode ; the last part takes haier ' s diversification growing mode for example to testify the modifying mode ' s effective use in practice, and hopes other chinese corporations can benefit from this mode too

    本文共分為五部分:第一部分論述了基於核心能力的企業多元化戰略產生的原因,以及理論與實證研究對該戰略有效性的;第二部分論證了核心能力本質的普遍模糊是核心能力難以識別與測度的根源,進而使多元化追求的協同效應基礎模糊不清,暴露出該戰略難以操作的缺陷;為提高該戰略操作性,第三部分通過引入企業戰略資產,在核心能力與多元化之間構架了一座,闡明核心能力的競爭優勢要通過戰略資產才能得到具體實現,同時,多元化應相關于戰略資產尋求協同優勢;在此基礎上,第四部分對原有戰略進行適當修正,構建了基於核心能力的戰略資產相關多元化戰略模式;第五部分以海爾企業多元化成長模式為例進行具體剖析,以例證該修正模式在中國的實際運用,期望能給予我國其他企業以有益的借鑒。
  10. As the building materials of kbc, or as a means to achieve kbc objectives, or as the conditions of implementation of kbc, or as a factor of evaluation and improvement of kbc, kbc resources are necessary premise and support for kbc development

    作為形成園本課程的材料、達成園本課程目標的、實施園本課程的條件、評價和改進園本課程的因素,它是園本課程開發必不可少的前提與
  11. Finally, based on the structure of the south cable bent tower and the construction technology of the jiangyin bridge, the computation of the bridge ' s crossbeam bracing structure is carried out and an analysis of the computation ' s results is also made

    最後,根據江陰大南索塔結構和施工工藝,進行了橫體系實例計算,並對結果進行了分析。
  12. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
  13. In a synchronic or mirrored event it means that events have connection or are linked in ways other than regular sequence like flow lines are

    同步性發生就是單獨自己顯露出來的對我們很重要的一個事件,在我們每一天的生命里,起從深層意識到外部實相意識的
分享友人