橋連基 的英文怎麼說

中文拼音 [qiáolián]
橋連基 英文
bridging group
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  1. Considering to the continuous rigid - frame bridge construction characteristic, putting forward the idea of reverse to optimize prestressed steel. according to different construction phases, the paper gets the formual of the cantalever phase, join two section of a bridge phase and the vertical prestressed steel, and works out corresponding program

    考慮大跨徑預應力混凝土續(剛構)施工的特點,提出了於倒裝方法的預應力靜定束、合龍束以及豎向束的優化設計理論,並編制了相應的計算程序。
  2. In accordance with the inherent continuity and stage - by stage essence characteristic of america ' s policy towards scandinavia, this part elaborates on how the united states treated scandinavia : from requiring of it the right to the bases in it, from orbiting the three scandinavia countries norway, denmark, and iceland into the north atlantic treaty organization, and making them under the control of the trade between the east and the west, to obliging the three countries to desert the " bridge building " between the east and the west

    根據美國對斯堪的納維亞政策的內在續性和階段性的特點,著重闡述了美國對斯堪的納維亞從最初只要求地權利到最終將斯堪的納維亞的挪威、丹麥、冰島三國納入北大西洋公約組織。並將斯堪的納維亞的挪威、丹麥等國裹脅進東西方貿易管制中以及迫使斯堪的納維亞國家放棄東西方「搭」政策的過程。第三部分進一步探討美國對斯堪的納維亞政策的演變過程。
  3. B 160m of dual 2 - lane approach ramp of piled in - situ deck construction for connecting to existing roads in the lok ma chau control point ; 120m of two - lane overbridge for passenger vehicles

    興建一條160米長,現場面施工的雙程雙線分隔接駁斜道,以接高架引道至落馬洲控制站的現有路面
  4. The synthesis and characterization of - cn - bridge - bound polynuclear metal carbonyl

    雜多核羰化合物的合成與表徵
  5. The superstructure of the bridge is a three - span ( 80m + 130m + 80m ) continuous rigid frame. the main piers are single - column flexible solid piers, whose foundation are 2. 0m dug piles. the abutments are light - type box abutments, whose foundation are 1. 2m bored cast - in - place piles

    上部為80m + 130m + 80m三跨續剛構;主墩為單柱柔性實體墩,其礎為2 . 0m挖孔樁;臺為輕型箱式臺,其礎為1 . 2m鉆孔樁。
  6. This paper sets up a fuzzy optimum math - model of the prestressed degree for prestressing bundle disposition of prestressed concrete continuous beam bridges, which is transformed into a clear math program by - level cut - set. by the solution of the clear math program, a succession of reasonable prestressing moments can be obtained. then it is convenient to dispose the prestressing system by only taking account of geometric factors of all controlling sections. based on this, a theory of automatic disposition of the prestressing bundles is proposed and an engineering example is given to demonstrate it

    建立預應力混凝土續梁預應力度的模糊優化問題,按-水平截集解法,將模糊優化問題轉化為確定性的數學規劃問題.求得一較合理的消壓彎矩后,只需按控制截面的構造進行預應力體系設計.在此礎上提出了配束自動化的本思想,並以一實例說明其理論應用
  7. Abstract : this paper sets up a fuzzy optimum math - model of the prestressed degree for prestressing bundle disposition of prestressed concrete continuous beam bridges, which is transformed into a clear math program by - level cut - set. by the solution of the clear math program, a succession of reasonable prestressing moments can be obtained. then it is convenient to dispose the prestressing system by only taking account of geometric factors of all controlling sections. based on this, a theory of automatic disposition of the prestressing bundles is proposed and an engineering example is given to demonstrate it

    文摘:建立預應力混凝土續梁預應力度的模糊優化問題,按-水平截集解法,將模糊優化問題轉化為確定性的數學規劃問題.求得一較合理的消壓彎矩后,只需按控制截面的構造進行預應力體系設計.在此礎上提出了配束自動化的本思想,並以一實例說明其理論應用
  8. In this thesis, aim to the beam axis shape be exactitude for design, the internal force of the beam be appeased by design request, the concept of modem cybernetics is applied, at the same time, the effecting parameter has collected. the paper build the ann model in predicting the beam camber an construction and discuss indetail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn. according to them, ann is applied in the construction control of prestressed concrete continuous bridge

    本文以大線形滿足設計要求和成內力控制在設計容許范圍內為目的,運用現代控制理論的思想,引用神經網路本原理,詳細介紹bp神經網路的研究過程,從而建立預應力混凝土續梁施工預拱度的神經網路模型,並詳細討論了模型的神經網路結點信息的提取,在工程實例的礎上進行了數值計武漢理工大學碩士學位論文算,數值表明,將神經網路應用於預應力混凝土續梁施工控制,獲得了滿意的結果,在預應力混凝土續梁施工控制技術研究方面,具有方便有效、精度高的優點,具有良好的應用前景。
  9. The transverse stiffness limitation index ? the permissible ultimate width / span ratio b / l of the continuous steel truss girder of railway bridge is analyzed in accordance with the analytic theories of random vibration of train ? bridge time - variation system and the required derailment coefficients and comfort of drivers and passengers in train running through the bridge. the limitation index in question may be referred to in the design of the continuous steel truss girders of railway bridges

    於列車-梁時變系統隨機振動分析理論,按照上列車脫軌安全系數和司機、旅客舒適度的要求,對鐵路續鋼桁梁橫向剛度限值-梁容許極限寬跨比b / l進行了分析,對鐵路續鋼桁梁的設計具有一定的參考作用。
  10. On the basis of the analyse of built continuous rigid - frame bridge ratio of span, according to the concept of engineering economy, while only to think about cost, the paper gains to choice rational ratio of span formula

    以既有pc續剛構孔跨比分析為礎,以工程經濟為本理論,提出了經濟跨徑的計算方法。
  11. Regarding natural sand of the spot as model sand, using series model, and under the interaction of irregular wave and tidal current, a systematic test on scouring around pile of land - island approach bridge of jiangsu lng receiving station is carried out

    摘要以現場天然沙為試驗床質,利用系列模型,採用不規則波與潮流相結合的方式,對江蘇lng接卸站陸周圍的沖刷情況,進行了系統試驗。
  12. All of the researches are carried out on the background of a spatial continuous beam - arch composite bridges, and the relative loading experimental results are compared with the calculated values. it indicates that the theory of elastically supported continuous beam method load lateral distribution is a kind of simple convenience and safe practical engineering calculation method. 2 ) the suspender force and correlated modality is analyzed with the use of general calculation program ansys. during testing suspender force, the influence of the rigidity of suspender must be considered

    在此礎上,以一座實際的預應力混凝土續梁拱組合體系梁為工程背景,採用一般的試驗研究方法對該進行了荷載試驗研究,並將有關的荷載試驗結果與理論計算值作了比較,結果表明:所提出的彈性支承續梁法計算值,與空間有限元分析理論值及荷載試驗測試值本吻合。
  13. When under the control of japan, dalian played an important role in the mi litary transportation line. after the liberation dalian was positioned as an industrial center. and since the reform, dalian has been the window of the northeastern economical district as one of the earliest open cities at the east coast of china

    ,在沙俄殖民時期,作為沙俄的遠東頭堡;在日本占領時期,作為日本軍事輸送一大要地;新中國成立以後,成為國家重要工業地;改革開放以後,作為國家首批對外開放的沿海城市,又成為了東北經濟區窗口。
  14. Therefore government would push ahead with easing border crossings, facilitating mainland visitors to come here and proceed with other infrastructure such as the second exhibition centre, the macauzhuhaihong kong bridge and development of sports and culture. on the serious budget deficit, tung said it would threaten hong kong s role as a financial centre, worsen the business environment and invite speculation against the dollar

    所以,政府今後會投放更多資源在這行業,實行具體政策,包括簡化中港兩地的過關手續,研究進一步放寬內地居民到香港旅遊便利的措施,以及加快建項目的興建,例如第二個展覽中心,接香港與澳門和珠海的大和發展體育和文化活動。
  15. The underwater near - site explosion safety control management is expounded in combination with rock blasting for pier footing of the newly built nos. 15 & 16 berths of dalian new port area

    摘要結合大新港地區新建15 (上標# ) , 16 (上標# )泊位工程槽炸礁的實際情況,介紹水下近場爆破安全控制管理問題。
  16. By adjusting pile lengths and pile numbers, the settlement of pile foundation increased from the main span to the side span to such an extent that it matched the settlement of the embankment at both ends of bridges without any special treatment

    分別通過調整樁長和樁數,使樁沉降從梁主跨逐步增大,而在路接處使邊跨墩沉降與坡填土沉降本一致,實現路沉降協同,從而開辟了解決頭跳車問題的新途徑。
  17. Synthesis and application in ethylene polymerization of p - biphenylene - bridged dinuclear zirconocenes

    聯苯雙核茂鋯化合物的合成及催化乙烯聚合
  18. Through the observation on jiaozuo - gongyi yellow river bridge project in he nan province and by using the settlement data obtained in the project, the rules of uneven settlement in soft clay base there were studied in this paper

    本文通過對河南境內焦作至鞏義黃河大接線工程軟土地兩年多的現場沉降觀測,使用各個斷面不同位置的沉降板沉降數據,研究了軟土地不均勻沉降規律。
  19. This update applies to windows 2000 sp3 - based computers with chipsets containing a pci to pci bridge connecting to a docking solution that also contains a pci to pci bridge

    此更新適用於於windows 2000 sp3的帶有晶元組的計算機,這些晶元組所包含的pci到pci接到也包含pci到pci的底座解決方案。
  20. Syntheses of polyethylene glycol bridged diparahydroxylbenzaldehyde condensed ortho - aminobenzoic acid

    多縮乙二醇二對羥苯甲醛縮鄰氨苯甲酸的合成
分享友人