橫向安裝 的英文怎麼說

中文拼音 [héngxiàngānzhuāng]
橫向安裝 英文
transversely-mounted
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • 橫向 : broadwise; infeed; crossrange; abeam;transverse; transverse direction; cross; crosswise; lateral;...
  1. Lateral stability verification of a canard airplane with and without a vertical panel

    和不垂直嵌板的鴨式飛機穩定性研究
  2. The walking track rail of the bracket - type crane is installed on the cement post in the factory building, along which this crane can do the vertical movement. at the same time the electric block can finish the swinging function along the vertical and horizontal movement of spiral arms

    該機行走道軌在廠房的水泥柱上,沿著道軌可做縱運動,同時電動葫蘆又可完成沿旋壁的運動以及垂直方的起吊功能。
  3. Minute vertical and lateral adjuster is built in the nozzle

    噴嘴和縱的為調節置。
  4. Suitable neutralearth block not installed for lateral mains at each floor

    每層樓的總線並無合適的中性接地線躉。
  5. Cross slab steering gear was applied to make the external prestressing tendons steer, in order to make the bridge structure stressed state more clear and safe

    通過設置隔板轉置來適應預應力束轉,使橋梁結構受力明確、全。
  6. This scheme of dividing area makes the network and borders between systems clear, and will help to install the security devices. in dispatch center, security devices such as firewall, physical partition device are installed, and between dispatch centers, encrypting devices will be installed

    具體地說,在同一地點的不同全區之間採用防火墻、隔離置等邊界防護設備進行隔離以抵禦非法訪問、拒絕服務等類型的攻擊,不同地點同一全區之間採用加密認證等手段,以抵禦數據在野外傳輸時可能遭遇的竊聽、偽造、篡改等類型的攻擊。
  7. Installation steps : 1firstly suspend the steel carries and obtain horizontal line ; 2attach the special triangular clamp to the triangular carrier and clip it for the triangular carrier the transverse direction is never used

    2將專用三角卡碼扣入三角骨,按所方板規格間格卡上三角骨只需用單不使用
  8. It is made up of filter relief - pressure valve and oil sprayer, thus reducing the transverse installation space. it can not only provide clean, dry and stable air source for pneumatic system but also provide good lubrication for pneumatic elements in the pneumatic system

    由過濾減壓閥和油霧器組合而成,減小了橫向安裝空間,能為氣動系統提供清潔、乾燥、穩定的氣源,又能為氣體系統中的氣動元件提供良好的潤滑作用。
  9. 5 by using multi - window programming technology to combine vc + + with autocad, this thesis implemented comparison of plane, profile and across section, interactive design of profile, railway location by across section and setting location of bridge and tunnel. 6 this thesis expounded itself viewpoint on application model of profile optimization in scrlid, and has been used in system development. 7 by putting forward the summaries on the application model of professional design, this thesis established mathematics model of calculating terrain height of profile and across section, automatic setting location of the bridge and the tunnel

    2 、用面對象的數據封和繼承技術實現了項目管理和方案數據的全保護; 3 、選擇應用vc + + dao數據庫應用技術,完成了方案比選共用數據庫的開發; 4 、用autocadobjectarx定製實體技術,實現了線路平面拖放式交互設計; 5 、用vc + +與autocad相結合的多窗口編程技術,實現了平面、縱斷面、斷面三種圖形的對比顯示,實現了縱斷面交互設計、斷面定線和橋隧工程設置; 6 、就縱斷面優化在線路方案比選工作中的應用模式提出了自己的觀點,並在系統開發中得到應用; 7 、總結專業設計應用模式,建立了內插縱斷面地面高程、自動設橋、自動設隧數學模型。
  10. 2 it can made horizontal, acial and angular displacement when being installed. it can t be restricted by the obstruction of pipe and the non - parallel of flange

    2時可產生位移,不受管道不通心,法蘭不平行的限制。
  11. The factors influencing the regular and irregular longitudinal and transverse misregister were analyzed, and the corresponding solutions to the problems on plate, printing pressure adjustment, tension control of paper tape, printing technology, the machining precision, and installation precision of press were put forward

    摘要針對柔版印刷中有規律性和無規律性的周套印不準、套印不準故障的影響因素進行了詳細的分析,並從印版、印刷壓力調整、紙帶的張力控制、印刷工藝、印刷機的加工精度和精度等方面提出相應的解決方法。
  12. The paper also discusses the influential factors on the maneuverability and stability, such as, lateral stable pole, the position of gravity center, road adhesive coefficient, and so on, which provides the basis for the designing and safe running of the coach - bus

    同時,討論了穩定桿、輪距變化、重心高度變化及道路附著狀況等對大客車高速操穩性的影響,從而為客車的設計、全運行等提供了寶貴的依據。
  13. Jcc mobile rail lift is used for the goods conveying of assembly line and for the storing and taking out of the goods in the three - dimensional garage and the automatic three - dimensional storehouse

    Jcc組工位升降工作臺是為大型設備組維修作業面設計,該設備可移動,任意高度作業,進入工位后自動與地面支撐保證工作全可靠。
  14. Sufficient ties or raking shores shall be provided to ensure that the scaffold cannot fall away from the object being scaffolded

    要提供充分的拉件和斜撐件以確保腳手架不會從被外倒塌。
  15. Vertical tube mounting is preferred, but horizontal opration is permissible if pins 2 and 8 are in horizontal plane

    垂直管是首選,但對于的操作是可以容許的,如果引腳2和8個是在水平面。
  16. Taking the example in the three gorges hydroelectric station, we researched the influence of the weld process on the construction and operation of penstock after moving contract - elongate nodes, analyzed the deformation law of two plans and calculated the crosswise and lengthwise shrinkage in weld process using experience formula and theory respectively, and then analyzed the influence of the welding and installing process on shrinkage, finally chose the best installation plan

    摘要以三峽水電站引水壓力鋼管施工現場為實例,研究取消伸縮節后焊接對引水壓力鋼管施工的影響,分析了兩種方案在焊接過程中的變形規律,分別用經驗公式和理論計算出兩種方案焊接時的和縱收縮量,然後分析收縮量對焊接過程的影響,選擇出最佳方案。
分享友人