橫撐板 的英文怎麼說

中文拼音 [héngchēngbǎn]
橫撐板 英文
wale pieces
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : Ⅰ動詞1 (抵住; 托住) prop up; support 2 (用篙使船行進) push or move with a pole 3 (支持) mai...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  1. It is 19. 5 meters high and 15. 6 meters around at the base. built entirely of wood, the vault is supported by eight pillars. the roof has no beams but only a great number of brackets entwined within each other

    它高19 . 5米,底部直徑15 . 6米,全木結構,殿頂由8根立柱支,頂無梁,由眾多斗拱上疊,天花層層收縮,構成美麗的穹窿式藻井。
  2. In these thesis, on the basis of existing data collected of arch bridges and dynamics, simply introduce the development and application of the analytical method and finite element numerical analysis method of arch bridges. taking the example of pubugou cfst arch bridge, establish 3 - d finite element model of it with software ansys, and analyze its natural vibration. the effects on inherent vibration of the differences of structure parameters, the restriction of the deck and the effects of different arrangements of cross braces are analyzed

    本文在收集有關拱橋及動力學資料的基礎上,分析了拱橋動力學的解析分析法和有限元數值分析方法的優缺點,同時以瀑布溝大橋為背景,使用ansys軟體建立了空間有限元模型,實施了橋跨結構的自振特性分析;並分析了考慮到模型簡化過程中部分結構參數取值差異、橋面的約束狀況不同等因數對自振特性結果的影響;此外還對橋面上的布置不同導致對自振特性的影響作了分析。
  3. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed. the material and structure form of support frame are discussed. the design of support frame uses the method of limited state, and also it analyses the integer stability, part stability, and single stability, and then proposes the load analysis of multi - level support frame

    首先,針對轉換層梁模體系及支架施工,重點分析了轉換層結構現澆混凝土對模側壓力值及模對拉螺桿的計算;討論了轉換層支體系的形式及構造,詳細論述了基於極限狀態設計的支架計算方法,包括縱向水平桿的強度驗算、立桿的整體穩定性、局部穩定性、單肢桿件穩定性等驗算,並提出了多層支架的施工荷載計算方法。
  4. Accessory support for floor board : adjustable support, cross girder, and buffing mat, with the support height : 150 - 350mm or decided by users

    支架配套:按地每平方米配套可調支梁緩沖墊支架高度可根據用戶要求確定。
  5. Cross member brace

  6. Consequently, the precast components don ’ t need any interim falseworks to be supported in the mid - span as bottom forms when the laminated concrete lay is being placed. furthermore, to form two - way slabs, the transverse steels can be arranged through the rectangular cores in the ribs of the precast slabs as needed. it makes the construction of composite two - way slabs easier and more feasible, practical, and suitable to introduce and apply to the building construction on a large area

    由於預制構件具有剛度大和承載力高的特點,施工時以預制構件作為樓底模無需設置跨中臨時支;同時還能通過預制構件肋預留的長方形孔布置向受力鋼筋實現樓的雙向配筋,使預應力雙向疊合樓的施工簡單易行,更適合於大面積的推廣應用,具有較大的工程應用價值。
  7. As for different requiremint for the lustration rate, we can provide you round - hole 20 - 30 %, strip - hole 40 - 50 % perforated panel. stringer, pedestal and typical rod with high - mechanic strength and loading capacity

    針對各種潔凈室潔凈度的不同需求,可提供圓孔20 % ? 33 % 、條孔40 % ? 50 %開孔率的高架鋁合金通風地。支架、梁及特殊的斜設計為高承載,高強度奠定了堅實的基礎。
  8. An element, such as a plate, used to fill the space between two supporting members

    填料用來填充兩個支物之間的空間的結構物,例如
  9. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模工程及預應力張拉帶來一定困難;支系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人