橫撐架 的英文怎麼說

中文拼音 [héngchēngjià]
橫撐架 英文
cro frame
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : Ⅰ動詞1 (抵住; 托住) prop up; support 2 (用篙使船行進) push or move with a pole 3 (支持) mai...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  1. The portal frames are joined at the top by a cross member.

    在門形框頂部使用一個相連。
  2. Insulators and fittings for overhead lines arming for horizontal arrangement of wires on strutted wooden poles

    空線路用絕緣子和器材.金具.木電桿上的水平布線用帶支
  3. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed. the material and structure form of support frame are discussed. the design of support frame uses the method of limited state, and also it analyses the integer stability, part stability, and single stability, and then proposes the load analysis of multi - level support frame

    首先,針對轉換層梁模體系及支施工,重點分析了轉換層結構現澆混凝土對模板側壓力值及模板對拉螺桿的計算;討論了轉換層支體系的形式及構造,詳細論述了基於極限狀態設計的支計算方法,包括縱向水平桿的強度驗算、立桿的整體穩定性、局部穩定性、單肢桿件穩定性等驗算,並提出了多層支的施工荷載計算方法。
  4. Accessory support for floor board : adjustable support, cross girder, and buffing mat, with the support height : 150 - 350mm or decided by users

    地板支配套:按地板每平方米配套可調支梁緩沖墊支高度可根據用戶要求確定。
  5. A support for a beam in the framework of a building

    柱,桿建築物框梁的支
  6. Scaffolds should only be sheeted in where the scaffold structure ( including ties and / or raking shores ) has been specifically designed to accommodate the additional wind loads that this imposes

    只是在腳手結構(包括和/或斜拉)經特別設計能夠承受額外的風力負荷的情況下,才可以封閉腳手
  7. It is necessary to study the construction technology of concrete cable bent towers. the dissertation introduces construction sequence, construction methods ( supporter construction, slip - form construction, climbing formwork and turn - over formwork construction ), anti - overturning measures of the tilted tower, crossbeams " construction and its bracing structure

    本文主要介紹了混凝土塔柱的施工順序、施工方法(支法、滑模法、爬模法和翻模法) 、傾斜塔柱的施工抗傾措施、梁施工及支系統。
  8. Skid support : for accomodating the objects with feet and skids which can not be lifted onto the beam

    :用於防止有腳的物體或放不上梁的運物小
  9. During the transverse analysis, as the discussion of frame bracing condition that exists in the new vision < code for design of steel structures > gb50017 - 2002 has been lead into the stability analysis of staggered truss system, the concept of strong and weak bracing staggered truss system, and the concrete dividing standard are also given, so that makes the staggered truss stable theory have a good link with the new code, and provide theory guarantee for designers

    向分析時將我國新修訂的《鋼結構設計規范》 gb50017 - 2002中,關于框體系支條件的論述引入到錯列桁的穩定分析中,提出了強支錯列桁體系和弱支錯列桁體系的概念以及具體的劃分標準,使得錯列桁的穩定分析可以與新規范很好的對接,為設計人員的使用提供了理論保障。
  10. As for different requiremint for the lustration rate, we can provide you round - hole 20 - 30 %, strip - hole 40 - 50 % perforated panel. stringer, pedestal and typical rod with high - mechanic strength and loading capacity

    針對各種潔凈室潔凈度的不同需求,可提供圓孔20 % ? 33 % 、條孔40 % ? 50 %開孔率的高鋁合金通風地板。支梁及特殊的斜設計為高承載,高強度奠定了堅實的基礎。
  11. On the base of the link ways of each member joint, the dissertation also puts forth a method to simplify the crossbeam bracing structure into spatial truss , spatial stiff frame and spatial combined structure

    梁支體系根據各桿件結點的連接方式,多簡化為空間桁、空間剛或空間組合結構。
  12. Putting on their gloves all set to work in a row in front of the press, an erection formed of two posts connected by a cross - beam, under which the sheaves to be drawn from were laid ears outward, the beam being pegged down by pins in the uprights, and lowered as the sheaves diminished

    她們戴上手套,在機器的前面站成一排,就開始工作了。機器是由兩條腿支起來的子,兩條腿中間用一個梁連接起來,下面放著一束束麥草,麥穗朝外,梁用銷子釘在柱子上,隨著麥束越來越少,梁也就越降越低。
  13. Sufficient ties or raking shores shall be provided to ensure that the scaffold cannot fall away from the object being scaffolded

    要提供充分的拉件和斜件以確保腳手不會從被安裝物向外倒塌。
  14. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的設影響大;懸吊結構未完體系(設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人