橫橋 的英文怎麼說

中文拼音 [héngqiáo]
橫橋 英文
cross bridges
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  1. Floor-beam webs have cracked in tied arch bridges.

    在系干拱梁腹板上發生裂紋。
  2. Destabilization style of an arcuated built - up system bridge, influence of nonconservative force of hanger rods, comparative between stress value in construction stage and stress value in finished bridge stage, stability coefficients in bridge code, these are discussed deep

    著重對失穩類型、撐在穩定中所起的作用、吊桿非保向力的作用以及施工階段的應力和成階段應力的比較、規范中穩定安全系數的規定進行探討。
  3. Arcuated built - up system bridges are one of bridge structural styles, which are used extensively at present. on one hand, because of complexity and diversity of this kind of structure, current engineering experiences have not satisfied design requirements no longer. on the other hand, towards this kind of structural system traditional methods simplify complicated structures into planar structures, these methods neglect apparently spatial action among members, especially those primary bearing load members along lateral direction of bridges

    拱式組合體系梁是目前廣泛採用的一種梁結構形式,一方面由於拱式組合體系梁結構的復雜性和多樣性,現有的工程經驗已不能滿足設計需求;另一方面對于這種結構體系過去的傳統做法是將復雜結構簡化成平面結構,這種做法顯然忽略了構件之間的空間作用,尤其是沿向存在主要承力構件。
  4. The bridge stands majestic astride the river.

    巍然跨在江上。
  5. Yueqing city huari fire - proof device co., ltd. is located at hong qiao town of yueqing city, south to wenzhou downtown, north to yan dang mountai " state scenic spot ", 104 national freeways and circumlittoral superhighway intersect hongqiao, being apart from wen zhou ' s airport, the train station is about 30 kilometers, the transportation convenience, the information is flourishing

    樂清市華日耐火器材有限公司位於浙江省樂清市虹鎮,南臨溫州市區,北靠旅遊勝地雁蕩山, 104國道及沿海高速公路貫虹,距溫州機場、火車站約30公里,交通便利,信息發達。
  6. The cross section of a bridge deck may twist as a result of excessive life.

    斷面可能由於過量的升力而發生扭轉。
  7. The high bridge crosses the mississippi.

    跨在密西西比河。
  8. Construction of post - tensioned pre - stressed box girders for hengdaozi flyover on dandong - benxi express highway

    本高速公路道子立交工程后張預應力砼連續箱梁施工
  9. New territories north development civil engineering - dranage and erosion protection - yuen long bypass floodway pwsc 66

    新界西部發展運輸道路-沙咀道跨青山公路的天
  10. Tenders invited for footbridge at kai cheung road

    招標承建跨啟祥道天
  11. The spectacular vermilion orange span of the golden gate bridge

    這是橙紅色金門大跨海上的壯觀場面。
  12. Steel decks, in other words, orthodox isomerism structures, are welded with various transverse and longitudinal reinforcing ribs. this results in the complexity of forces and deformatiort of the pavement layer above the deck

    面板焊接在各種向、縱向加勁肋上,面板為正交異性板結構,決定了其上的鋪裝層受力變形的復雜性。
  13. Structural strength research for 64 type military - used beam joggle - type bridge layer

    窄幅整體移式架機在斜交中的應用
  14. The prestressed continuous beam - arch composite bridges are a special structural system where the horizontal thrust of the arch rib is absorbed by a prestressed tie at deck level. in some cases, this type of structure is preferable because it does n ' t have the large thrust at the spring hi traditional arch bridges and the somewhat large bending moment and shear force in traditional beam bridges. as a result, the performances of the prestressing reinforcement can be efficiently utilized

    它利用拱肋承擔壓力,系梁預應力束抵抗拱端推力,吊桿及縱橫橋面系結構承受面荷載,既克服了傳統拱巨大的拱端推力,又改善了連續梁較大的彎矩和剪力的受力狀況,最大限度地發揮了拱梁混凝土和預應力鋼筋各自的特點,經濟效益顯著。
  15. Under selfgravity and secondary dead load, the wide steel box girder cable - stay bridge has a large deflection in transverse

    梁寬較大的斜拉鋼箱梁在自重和二期恆載的作用下,在橫橋向有著較大的撓度,在設計中必須予以考慮。
  16. Based on the urgent need that pier protective device primarily designed needed to be tested its crashworthiness by the impact of ship in multi - situation, etc in multi - angle and multi - water, the writer analyzed the critical elements that affect the simulation of the collision between ship and pier protective device, and found the feasible way to deal with the conflict between calculation efficiency and precision. using this method and employing ansys / ls - dyna program, which is the universal nonlinear dynamic analysis software, a head - on collision between ship and pier protective device designed for guanzhou river bridge is simulated and presented, the simulation of time history course of full - scale mini - collision between ship and pier protective device was taken into reality with a spot of elements ( less than 21000 ) and scanty time ( 9 hours on p4 pc )

    本文在前人研究的基礎之上,結合船碰撞實例,對碰撞計算機模擬模擬的關鍵技術進行了研究,在效率與精度的矛盾中找到平衡,對一艘2000噸級散貨船橫橋向正撞廣東管洲河大墩防撞鋼套箱這一種工況進行了計算機模擬模擬,實現了以較小的單元和較短的時間模擬碰撞的時間歷程,模擬滿足工程精度要求,解決了目前碰撞模擬計算周期太長的問題,同時模擬模擬得到的結論對該類防撞裝置提供了有價值的參考。
  17. All results of analyzing, calculating and wind tunnel test indicate the vibration of yamen bridge pylon were rather serious, so it is necessary to control the wind - induced responses during construction

    計算和風洞試驗均表明,在風荷載作用下該橫橋向抖振響較為嚴重,需對獨塔施工階段的橫橋向抖振響應進行控制。
  18. It is showed in buffeting analysis that the analysis results in time domain agree well with those in frequency domain. effect of pylon wind field can increase the lateral buffeting response of pylon. nonlinear factor can decrease the nature frequency of cable - stayed bridge, and can increase the vertical and torsional buffeting response

    時域抖振分析結果表明:大跨度斜拉抖振的時域和頻域分析方法具有較好的一致性;考慮塔風效應會顯著增大塔的橫橋向抖振響應;非線性因素會降低斜拉的自振頻率,會增大斜拉的豎向及扭轉抖振響應。
  19. In the paper, the wind environment was investigated, at the same time the buffeting responses on the top of yamen bridge pylon under wind were calculated

    本文對崖門大所處的風環境進行了研究,並對該塔在獨塔施工階段的塔頂橫橋向抖振位移進行了計算。
  20. The results of the wind tunnel test, which were made to research the effect of tmd indicates the tmd was suitable and useful for yamen bridge pylon tower

    為研究tmd對崖門塔的減振效果而進行的風洞試驗表明,用於該塔的tmd設計合理,對塔的橫橋向抖振有較好的抑制作用。
分享友人