橫過地 的英文怎麼說
中文拼音 [héngguòde]
橫過地
英文
athwart-
Secondly, based on the microbeam analytical technique, on the one hand, through investigating the characteristic of major elements in the mantle minerals the author acquired the static information from mantle ; on the other hand, through multi - point analysis of a part of the minerals from mantle, the auther got dynamic information from mantle. finally, generalizating the fruits of this study and predecessors, the autor holds that the constituents of lithospheric mantle possibly includes spinel lherzolites, clinopyroxenites, websterite, dunite, harzburgites, garnet lherzite, phlogopite lherzite, eclogites, clinopyroxene megacrysts ; compared with east china and north china platform, the research field mantle shows the characteristics of higher degree of partial melting processes and more depleted mantle ; the. upper mantle beneath north hetian area is heterogeneous, with a tendency of deficit in a12o3 and lree from kaliyang in west hetian to the river basin of kalakshi river and yulongkashi river ; the subduction of the crust beneath north hetian has ever occurred in geological history and caused the mixing of mantle - crust ; the depth of the origination of basaltic magmas beneath north hetian exceeds 73km ; the thickness of the lithosphere beneath the research area amounts to 204. 9km ; the mantle beneath north hetian has geological condtions for forming diamond deposits
最後,綜合本區幔源礦物和地幔巖石的特徵以及地球物理資料,得出如下結論:本區上地幔的物質組成有尖晶石二輝橄欖巖、二輝巖、單斜輝石巖、純橄欖巖、方輝橄欖巖、石榴石二輝橄欖巖、金雲母二輝橄欖巖、榴輝巖;與中國東部以及華北地臺上地幔相比,研究區上地幔具有富集主元素中相容元素和虧損其中的不相容元素的特徵,局部熔融程度較高;上地幔存在橫向和縱向的不均一性,從西部的克里陽到喀拉喀什河和玉龍喀什河流域, al和lree富集程度呈下降趨勢,不同來源的相同礦物中主元素的含量差異較大;地質歷史時期這里可能發生過地殼俯沖並產生殼幔混合作用;玄武巖漿的起源深度73km ;從幔源重砂礦物的溫壓估算結果,可以推斷出巖石圈厚度可達204 . 9km ;綜合巖石圈物質組成特徵、巖石圈熱狀態、地幔溫壓狀態、氧逸度以及幔源巖石和幔源礦物的化學成分,認為研究區具備了金剛石成礦地幔地質條件。You should not let your vehicle stand where it would cause danger or inconvenience to pedestrians particularly where pedestrians are likely to cross the road such as at a pedestrian crossing, at or near a junction or near a traffic island
在會對行人造成危險或不便的地方,特別是在行人可能會橫過馬路的地方如行人過路處路口路口旁及交通安全島附近,你就不應該停留。Bus 6, 6a, 6x, 66 or 260 from exchange square bus terminus, central ; li yuen streets east and west central mtr exit c then walkalong des voeux road central towards sheung wan ; upper lascar row, also known as " cat street " sheung wan mtr exit a2, turn right and then left along hillier street, away from the tramlines, turn right at queen s road central, cross at the first " zebra " crossing then up the steps to " cat street " ; and hollywood road one block above upper lascar row
中環交易廣場巴士總站搭乘6 6a 6x 66或260線巴士利源東西街地鐵中環站c出口,沿德輔道中往上環方向走摩羅上街,又稱摩羅市集地鐵上環站a2出口轉右,然後左轉入禧利街,朝電車路相反方向走,再右轉入皇后大道中,橫過第一道斑馬線后沿石階步上,還有著名的荷李活道位於摩羅上街之上。Some said that there were some spots where riding bicycle to cross tracks and trespassing onto light rail tracks were serious. they suggested stepping up enforcement at these locations
認為有些地點經常有單車使用者不遵守交通規例橫過行人過路處,或有行人不適當地進入輕鐵范圍,並建議在這些地點加強行動。Layer 3 source and destination addresses do not change when the packet traverse
當儲存器橫過的時候,層3個來源和目的地住址不改變。The basic strategy behind all these ideas is the break the problem down into small, manageable chunks by learning your fretboard vertically and horizontally
該方法的基本思想是,通過縱向和橫向地學習指板,把問題分解為更小的、易對付的問題。The northern section dbl covered under this contract primarily comprises the construction of viaduct with some at grade sections and cut slopes at the northern end where the road passes through the northern extremity of the tsing shan range. it connects the hk - swc to the southern section near castle peak road
合約項下的北段后海灣干線北段主要包括建造高架路,在北端設有地面路段和削坡,道路會在該處橫過青山嶺北端的山邊,把深港西部通道與青山公路附近的南段連接起來。This shadow moved across the earth at nearly 2000 kilometers per hour
這個影子以每小時2000公里的速度橫跨過地球。He turned away and sauntered across the road
他掉轉方向,溜溜達達地橫過馬路。This paper deals with seismic response of a tunnel - soil system immersed tunnel , as an underground structure , must be compatible with the deformation of the surrounding soil thus the simplified model for a tunnel - soil system is established through two steps at the first step , an mdof system is developed for modeling the foundation soil to this end , dynamic behavior of the foundation soil is analyzed a typical section of the foundation soil simplified as a single mass - spring system on the basis of some equivalent criteria those mass are linked longitudinally by elastic springs to form an mdof system at the second step , the tunnel is treated as a beam on elastic foundation ; that is , the tunnel is connected with the soil massed to form a tunnel - soil system this model has been applied to the seismic analysis of huangsha fangcun immersed tunnel across the pearl river in guangzhou design recommendation is proposed on the basis of this analysis
研究沉管隧道在地震條件下整體受力的分析方法分兩步建立計算模型第一步通過分析場地地基土切片的動力特性,根據等效原則將其化為等效單質點體系,然後在縱向用等效彈簧連接而成為多質點體系的地基土計算模型;第二步將隧道看作彈性地基梁與上述多質點體系通過等效彈簧連結而得到土隧道體系的計算模型本文結合廣州黃沙芳村珠江水下隧道工程實例建立了具體的計算模型並對多種不同的約束條件,進行了縱向與橫向地震響應時程分析,為該隧道的抗震設計提供依據Police are investigating a traffic accident in which a 79 - year - old woman was killed in ngau tau kok this ( november 23 ) morning. shortly before 7 am, a taxi driven by a 45 - year - old man was travelling along kwun tong road towards mong kok. when it reached outside kowloon bay mtr station, it reportedly knocked down the 79 - year - old woman who was crossing the road
今早約七時,一輛由一名四十五歲男子駕駛的的士正沿觀塘道往旺角方向行駛,當駛至九龍灣地鐵站對開時,據報撞倒一名正在橫過馬路的七十九歲女子。Take the mtr to quarry bay station, leave by exit a, cross king s road and here you are
從地下鐵路樽魚涌站a出口步出后,橫過英皇道即可到達。The park also includes the 7th section of the hong kong trail, along which tourists can fully enjoy the winding coastline of tai tam bay. the track along the transverse mountain ridge, although rougher, provides the best vintage points to overlook shek o
港島徑的第七段亦在公園范圍內,沿途可欣賞大潭灣迂迴的海岸線,而沿龍脊橫過公園的山徑雖然較崎嶇不平,但卻是俯瞰石澳全景的最佳地點。If you just read the official definition, then even jupiter and earth are not planets because there are asteroids around their orbits and hence they do not clear the orbits. similarly, neptune is not a planet because pluto crosses the orbit of neptune
從表面看來,即使木星地球也不是行星,因為在它們的軌道內亦有不少小行星,它們並未能清空軌道附近的其他天體,同一道理,由於冥王星會橫過海王星的軌道,所以海王星理應亦不附合作為行星的條件!Take the mtr to shau kei wan station and turn left at exit b1, walk northwards along shau kei wan main street east for about 10 minutes to the island eastern corridor, cross the road by the pedestrian subway, then walk along tung hei road for 5 minutes more
從地下鐵路筲箕灣站b1出口步出后左轉,沿筲箕灣東大街往北走,大約10分鐘后便會看見東區走廊。利用行人隧道橫過路口,再沿東喜道步行5分鐘便可到達。Take the mtr to shau kei wan station and turn left at exit b1, walk northwards along shau kei wan main street east for about 10 minutes to the island eastern corridor, cross the road by the pedestrian subway and you will get to tam kung temple on the north of the corridor
從地下鐵路筲箕灣站b1出口步出后左轉,沿筲箕灣東大街往北走大約10分鐘便會看到東區走廊。利用行人隧道橫過路口,便可到達坐落於東區走廊北面的譚公廟。Compared w ith t he c alculated r esults and monitoring data, to verify i f the p resent parameters can accord with the real situation of nanjing. the distribution of surface settlement trough is obtained by one - dimensional wave theory and calculation. the range of surface settlement trough coefficient is retrofitted
通過對比peck法計算值和實測值,驗證現有的經驗參數是否能很好地滿足南京地區的實際情況,通過對實測曲線的擬合和數值計算得到沉降槽半寬度,從而改進了南京地區橫向地表沉降槽寬度系數k的取值范圍,有助於盾構法在南京地區的推廣和應用。According to this practical project, beijing metro no. 10 line crosses under the beijing metro no. 13 line existed station structure, this paper has made an overall and systemic analytical study on crosswise surface settlement and the longitudinal surface settlement process which influence by metro tunnel construction with shield driven method through analyzing a mass of site monitoring data. the settlements in different period are concluded, the crosswise surface settlement influence scope, some construction factors to surface settlement has been analyzed too
本文針對北京地鐵十號線芍藥居至北土城東站區間隧道下穿既有城鐵十三號線芍藥居車站結構這一實際工程,通過大量的現場監測資料分析,研究了盾構掘進過程中對橫向地表沉降和縱向地表沉降的影響過程;探討了盾構掘進各個階段的沉降占總沉降量的百分比;分析了盾構掘進對橫向地表沉降的影響范圍,以及各種施工因素對地表沉降的影響。The duration of the steady green light of a pedestrian traffic light is determined by the width of the crossing and the volume of pedestrian flow ; while that of the flashing green light is to ensure that pedestrians who have started to cross the road when flashing begins would have sufficient time to reach a safe point
行人過路燈號的綠燈亮時間,是按過路處的距離及行人流量而計算;而綠燈閃燈時間則確保在綠燈剛閃亮時已開始橫過馬路的行人,有足夠時間到達安全地點。Walk along che kung miu road and cross the road via the pedestrian subway. alternatively, take the kcr east rail to tai wai station. before leaving the station, look for the sign saying " che kung temple "
交通:乘坐馬鞍山鐵路抵達車公廟站,依照指示從」 b 」出口離開車站,向前走到車公廟路,再沿隧道橫過車公廟路,回到地面上,便會看見車公廟。分享友人