檢查測定 的英文怎麼說

中文拼音 [jiǎnzhādìng]
檢查測定 英文
check determination
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 查名詞1. [植物學] (山查) hawthorn; haw2. (姓氏) a surname
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • 檢查 : 1 (用心查看) check up; inspect; examine; censor; survey rummage; review; jerque; docimasia 2 (...
  • 測定 : determine; determination; setting-out; admeasurement; assignment; assay; finding
  1. We should judge the adhibit of solder paste before screen printing by automatic machine or by hand

    我們在進行錫膏印刷前應對錫膏進行一。如果沒有專用設備也可以用以下的方法一下。
  2. We prospectively investigated whether measurements of carotid intima - media thickness in the presence or absence of albuminuria in patients with stable chest pain syndromes can be used as a noninvasive test algorithm for prediction of significant coronary artery disease

    前瞻性研究穩性胸痛綜合征患者在有/無蛋白尿時的頸動脈內膜中層厚度量能否作為預重要冠狀動脈疾病的一種無創性方法。
  3. Such investigations may include blood tests, breath tests and upper gastrointestinal endoscopy with biopsy for detection of

    項目包括驗血、呼吸試及使用內窺鏡,並抽取活組織以是否受幽門螺旋菌感染。
  4. Such investigations may include blood tests, breath tests and upper gastrointestinal endoscopy with biopsy for detection of helicobacter pylori

    項目包括驗血、呼吸試及使用內窺鏡,並抽取活組織以是否受幽門螺旋菌感染。
  5. Sufficient or not of the battery on the device should be carefully examined before every flying, so do the every pole, helm and gemel, whether or not is the receiving antenna drew out of the body and in straight, examine the ground effective distance for remote control without the drawing out the antenna, ensure it nomal in rang of 30 - 50 meters

    1 .仔細試設備每次飛行前都應該仔細設備電量是否充足,飛機各個拉桿舵角鉸鏈是否正常,接收機天線是否拉出機身並拉直,在不拉出發射機天線的情況下試地面有效遙控距離,確30 - 50米內不發生跳舵情況。
  6. Enterprises must compare with the best satisfaction value after receiving the index satisfaction at all levels, find out one ' s own advantage and disparity from it, implement and improve, about improve model question that input and output maximized in fact, enterprises are in a situation that the capital cost is certain, the rational input to each index of distribution, make customer satisfaction get the greatest improvement customer satisfaction test and assessment is a dynamic course, enterprises must also implement a lot of investigations, measure satisfaction value many times, in order to check the impro ved result, cany on essential adjustment, make the improvement scheme correspond to reality

    企業在得到各級指標滿意度之後,必須與最佳滿意度值比較,從中找出自己的優勢和差距,實施改進,關于改進模型實際上是投入產出最大化的問題,企業在投資額一的情況下,合理的分配對各個指標的投入,使得顧客滿意度得到最大的提高。顧客滿意度評是一個動態的過程,企業還必須實行多次調,多次量滿意度值,以改進的效果,進行必要的調整,使得改進方案符合實際。
  7. Minute hardness testing systems, hardness meters vickers, rockwell, shore, metalloscopes, magnetic detectors, demagnetizers, metallographic inspection devices, surface roughness meters, electrical micrometers, air micrometers, mu meters, electrical converters, bore micrometers, cylindrical gauges, block gauges, eccentricity meters, precision bases, others

    微小硬度系統硬度計維克斯洛氏邵氏金屬顯微鏡磁力探機脫磁機金屬組織裝置表面粗糙器電微型壓力機空氣微型壓力機微米表電轉換器鏜孔微型壓力機缸徑規塊規偏芯器精密加工臺等等。
  8. Optical disk drive inspection equipment

    光碟設備裝置用
  9. Optical disk inspection equipment

    光碟設備碟片用
  10. Liquid cryatal also use on the public nuisance of chemical industry, the oriented polymer of macromolecular reaction, the nondestructive evaluation and microwave determination of aviational machine and metallurgic product, checking skin cancer in medicine, body temperature measurement, etc. it has showed the great superiority

    另外液晶在化工的公害、高分子反應的向聚合、航空機械及冶金產品的無損探傷和微波、醫學上的皮癌、體溫量等領域,也都顯示出其巨大的優越性。
  11. Methods the serum hbv markers hbv dna levels in serum and pbmcs, were quant.

    方法220例慢性乙型肝炎患者進行乙肝標志物血清hbvdna量及pbmcs中hbvdnapcr方
  12. Check test result in order to ensure deficiency in the application program

    試結果以便確應用程序中的缺陷。
  13. Single or three phase at nominal low voltage are required to be inspected, tested and certified at least once every five years. examples of such installations are power supply to lifts, water pumps, public lightings and other communal services in the common area of domestic premises and fixed installations in offices etc. having total loading exceeding 100 amperes, single or three phase

    (單相或三相)時,該裝置須每5年最少作一次試及領取證明書。這類裝置包括住宅樓宇內升降機、水泵、公共照明及其他公用設施的供電裝置,辦公室內的固裝置等,其總負載量超逾100安培(單相或三相) 。
  14. Based on practical project of inspecting, appraising and reinforcing a main heavy factory building, especially its steel crane girder system, of the second steel mill belonging to taiyuan steel & iron corporation, whose technology renovation leads to increase tonnage of many heavy cranes and vertical load of frame - bent structure, first the structure and its members were investigated, inspected, calculated and analyzed, and their reliability was appraised respectively and the strengthening projects or the measures to remedy were given. then, in accordance with the requirement to strengthen the girders under non - stop production, the feasibility of strengthening the crane girders by adding steel diagonal braces underneath the existing girders has been studied by inspecting and evaluating the strengthening effect of the crane girders and comparing with other reinforcing scheme

    本文結合太鋼(集團)有限公司第二煉鋼廠主廠房由於生產工藝改造要求,加大多臺重型吊車噸位及bc跨( 1 ) ( 8 )軸線框排架各層豎向(設備)荷載后,對廠房結構,尤其鋼吊車梁系統進行與加固設計的實際工程,首先對廠房結構進行了現場調研、技術試以及內力和承載能力的計算與分析(考慮抗震) ,並根據、計算與分析結果,對廠房結構、構件的可靠性進行了評,並綜合提出鑒結論和加固處理建議。
  15. Owners of premises having high voltage fixed installations that are fed directly from a high voltage supply are required to have their high voltage fixed electrical installations inspected, tested and certified at least once every year

    房產如設有由高壓電源直接供電的高壓固電力裝置,則該房產的擁有人須安排該高壓固電力裝置每年最少作一次試及領取證明書。
  16. You can examine your tests and decide which part of a test you want to be data - driven

    可以試並決希望試的哪一部分成為數據驅動的試。
  17. The frequency for such inspection, test & certification may be at least once every 12 months or at least once every 5 years depending on the type of installation ( see section ( ii ) of annex 2 ). certification for the above shall be made on specified forms - " periodic test certificate " ( i. e. form wr2 ) or periodic test ( part of an installation ) certificate " ( i. e. form wr2 ( a ) )

    這類試及發出證明書應最少每12個月進行一次,或最少每5年進行一次,視乎電力裝置的類別而(見附件2 ( ii )部) 。上述的證明書須採用指的表格
  18. First inspection, testing and certification of fixed electrical installations

    電力裝置的首次試及發出證明書
  19. According to the electricity ( wiring ) regulations, a low - voltage fixed electrical installation in a residential or commercial building with an approved loading exceeding 100a is required to be inspected, tested and certified at least once every five years

    根據《電力(線路)規例》 ,裝設于住宅或商業房產內的低壓固電力裝置如其允許負載量超逾100安培,須最少每五年作一次試及領取證明書。
  20. Gas analysis - comparison methods for determining and checking the composition of calibration gas mixtures iso 6143 : 2001

    氣體分析.用混合氣體成分的比較方法
分享友人