檢查測試 的英文怎麼說

中文拼音 [jiǎnzhāshì]
檢查測試 英文
checkout
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 查名詞1. [植物學] (山查) hawthorn; haw2. (姓氏) a surname
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 名詞(古代占卜用的器具) astrolabe
  • 檢查 : 1 (用心查看) check up; inspect; examine; censor; survey rummage; review; jerque; docimasia 2 (...
  • 測試 : test; testing; checkout; measurement
  1. Sufficient or not of the battery on the device should be carefully examined before every flying, so do the every pole, helm and gemel, whether or not is the receiving antenna drew out of the body and in straight, examine the ground effective distance for remote control without the drawing out the antenna, ensure it nomal in rang of 30 - 50 meters

    1 .仔細檢查測試設備每次飛行前都應該仔細設備電量是否充足,飛機各個拉桿舵角鉸鏈是否正常,接收機天線是否拉出機身並拉直,在不拉出發射機天線的情況下地面有效遙控距離,確定30 - 50米內不發生跳舵情況。
  2. Check test result in order to ensure deficiency in the application program

    檢查測試結果以便確定應用程序中的缺陷。
  3. Describes how to select or check tests using the team system testing tools windows

    描述如何使用team system testing tools窗口選擇或檢查測試
  4. Single or three phase at nominal low voltage are required to be inspected, tested and certified at least once every five years. examples of such installations are power supply to lifts, water pumps, public lightings and other communal services in the common area of domestic premises and fixed installations in offices etc. having total loading exceeding 100 amperes, single or three phase

    (單相或三相)時,該裝置須每5年最少作一次及領取證明書。這類裝置包括住宅樓宇內升降機、水泵、公共照明及其他公用設施的供電裝置,辦公室內的固定裝置等,其總負載量超逾100安培(單相或三相) 。
  5. Based on practical project of inspecting, appraising and reinforcing a main heavy factory building, especially its steel crane girder system, of the second steel mill belonging to taiyuan steel & iron corporation, whose technology renovation leads to increase tonnage of many heavy cranes and vertical load of frame - bent structure, first the structure and its members were investigated, inspected, calculated and analyzed, and their reliability was appraised respectively and the strengthening projects or the measures to remedy were given. then, in accordance with the requirement to strengthen the girders under non - stop production, the feasibility of strengthening the crane girders by adding steel diagonal braces underneath the existing girders has been studied by inspecting and evaluating the strengthening effect of the crane girders and comparing with other reinforcing scheme

    本文結合太鋼(集團)有限公司第二煉鋼廠主廠房由於生產工藝改造要求,加大多臺重型吊車噸位及bc跨( 1 ) ( 8 )軸線框排架各層豎向(設備)荷載后,對廠房結構,尤其鋼吊車梁系統進行鑒定與加固設計的實際工程,首先對廠房結構進行了現場調研、技術以及內力和承載能力的計算與分析(考慮抗震) ,並根據、計算與分析結果,對廠房結構、構件的可靠性進行了評定,並綜合提出鑒定結論和加固處理建議。
  6. Owners of premises having high voltage fixed installations that are fed directly from a high voltage supply are required to have their high voltage fixed electrical installations inspected, tested and certified at least once every year

    房產如設有由高壓電源直接供電的高壓固定電力裝置,則該房產的擁有人須安排該高壓固定電力裝置每年最少作一次及領取證明書。
  7. Our subsidiaries hold a completed production line which including factories of iron ware, aluminum ware, stainless steel ware processing, iron ware surface processing, iron ware coat spraying, aluminum ware stamping. aluminum ware surface anode - oxygenating, aluminum ware teflon coat spraying, as well as plastic components molding, assembling, testing, and so forth. total 13 factories

    屬下有明達鐵製品廠,鋁製品不銹鋼製品廠,鐵製品處理廠,鐵製品表面噴塑廠,鐵鋁製品沖壓廠,鋁製品陽極氧化表面處理廠,鐵製品teflon噴塗廠,電飯煲塑料部件注塑廠,電飯煲裝配廠,電飯煲檢查測試廠等十三家專業生產廠家。
  8. Shkp keeps systematic records of previous anomalies and their causes, which helps avoid reoccurrence. professionals from the construction and monitoring teams test over 100 things in new flats including windows, floors, walls, bathtubs, wiring, door hinges and screws, to ensure that everything is up to scratch when the development handed over

    另方面,在業主驗收新樓前,建築及監察部會反覆檢查測試單位每一細節,由窗地板墻身浴缸到電線門鉸螺絲等超過100項,確保質素達到高水平。
  9. The u. s. congress mandated test screenings at three overseas ports as part of a 35 - billion dollar homeland security measure passed in september. china real estate tycoon re - arrested

    美國國會今年9月通過了350億美元的國土安全措施議案,包括授權在三個海外港口進行檢查測試
  10. Inspect the contents of the test table on ha1 node as user db2inst1

    在節點ha1上以db2instl的身份檢查測試表的內容:
  11. But we ran tests and found no trace of drugs in her system

    但經過檢查測試,發現在她的機體中沒有任何服用過藥物的跡象
  12. Examine the test results

    檢查測試結果。
  13. Review testing practices

    檢查測試方法。
  14. The vapor concentration in the booth should be inspected according to the regulations

    對艙室內溶劑蒸汽的濃度,要按規則檢查測試
  15. You can examine your tests and decide which part of a test you want to be data - driven

    可以檢查測試並決定希望的哪一部分成為數據驅動的
  16. You need to re - examine your test procedure and identify the differences between those two tests

    您需要重新檢查測試過程,並識別那兩次之間的差異。
  17. When analyzing test results, we need to examine the validity and reliability of the test results

    在分析結果時,我們需要檢查測試結果的有效性和可靠性。
  18. 3inspect, test, and adjust the automation and instrumentation, plc units etc. according to maintenance plan

    依據維護計劃去,調整系統設備機器
  19. 3 inspect, test, and adjust the automation and instrumentation, plc units etc. according to maintenance plan

    依據維護計劃去,調整系統設備機器
  20. To guarantee the operational readiness of diver ' s personal equipment, checks and inspections should be performed and documented by the diver and his employer in accordance with national regulations and manufacturer ' s recommendations

    為確保潛水員的個人裝備已做好作業準備,潛水員及其僱主應遵循國家法規和製造廠家推薦方法對設備進行和記錄。
分享友人