檢驗試件 的英文怎麼說

中文拼音 [jiǎnyànshìjiàn]
檢驗試件 英文
check test piece
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 名詞(古代占卜用的器具) astrolabe
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 檢驗 : checkout; test; examine; inspect; verify; survey; check;checking;testing;[英國]jerque(指檢查船舶...
  1. The two specimens, which are designed as : main beam - pre - stress beam ? floor ? frame columniation assemble the space specimens. in order to checkout whether the code can be applied for the special structure systems, the structure of the specimens refer to the current gb50010 - 2002 concrete structure design code and gb50011 - 2001 seismic resistant code

    本文的各組成構為:非預應力邊梁預應力梁板框架柱組合空間,各組成構的構造參照了現行《 gb50010 - 2002混凝土結構設計規范》及《 gb50011 - 2001抗震規范》的有關規定,以規范及設計條例能否適用於該特殊結構形式。
  2. Material testing machines - testing equipment for structural components - part 1 : floor slabs

    材料機.建築構設備.第1部分:底板
  3. Fibre optic interconnecting devices and passive components - basic test and measurement procedures - examinations and measurements - attenuation of random mated connectors

    光纖互連設備和無源元.基本和測量程序.和測量.隨機配合連接器的衰變
  4. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次樁施工工藝的測和樁身質量及承載力的,確定了沖擊鉆在溶洞地質條下的合理使用方法;基樁承載實表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測工作;數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  5. Is it due to the decline of auditing quality, or providing nonstandard uncensored auditing opinion to change the auditor ? is the changing of auditor will influence the auditing quality ? if it is true, what is the potential explanation ? for the attention of above - mentioned problem, this thesis attempt to test some samples of auditor changing in chinese stock market, to find the underlying signification of the changing auditor event, and the effect on the auditing quality

    出於對上述問題的關注,本文圖對我國證券市場中的若干審計師變更樣本進行,以便發現審計師變更事的潛在含義,以及其是否對審計質量產生影響。本文以盈餘管理為橋梁,通過2001 - 2004年度上海a股數據審計師變更與審計質量的相關性問題。最後得出的結論是審計師變更能在一定程度上會影響審計質量。
  6. Fuyuan comapny had started to specialized develop, study and produce the technology of polyurethane productions since 1990. at present, it owns about 30 million of fixed assets, we built nearly 10000 square meters workshop of international standard in weihai hi - tech develop zoon, and there were fully equipped water, power, steam and communication apparatus. we had 4 sets high - power pu foaming machines from italy, and a lot of advanced and perfect devices for chemical examination, and now we have the ability of production for 5 million polyurethane flat - free tyres pu tyres and 1000, 000 pieces polyurethane spare parts for automobile

    本公司自1990年開始專業從事聚氨酯產品的技術開發研究與生產。目前擁有固定資產三千余萬元,在國家級的威海高技術產業開發區建設近萬平方米的國際標準廠房,水電汽通訊等設施全。裝備有義大利進口的聚氨酯高壓發泡設備4臺套,並且具備先進完備的化裝置,現已形成年產各種規格的聚氨酯無充氣輪胎五百萬條和聚氨酯汽車內外裝飾十萬的生產能力。
  7. These appointed examiners, categorised into boiler inspectors and air receiver inspectors, carry out inspections and testings of any pressure equipment subject to registration and are responsible for scrutinising documents on design, construction, quality of fabrication and issuing certificates of fitness

    這些委任師分為鍋爐師和空氣容器師兩種。他們為須登記的壓力器具進行及測,並負責審查有關設計、構造及裝配質素的文,以及簽發效能良好證明書。
  8. Destructive tests on welds in metallic materials - cold cracking tests for weldments - arc welding processes - part 1 : general

    金屬材料焊接的有損.焊的冷裂.弧焊工藝.第1部分:總則
  9. Follow up and monitor manufacturing process, inspect and accept the finished components of wind turbine ; supervise the fulfillment of specifications and relative standards

    制定采購部計劃,包括過程和最後收程序的計劃。
  10. Following the product enterprise standard, the profession standard and the national standard, controlling every step in the procedures, we master the examination and experiment in the middle and final of raw material purchase and manufacture process various working procedures, and request the interrelated data and document that are prepared and tally with the stipulation, to guarantee the quality of product which leaves factory

    依據產品的企業標準行業標準和國家標準,把好每一道質量關口,對進貨環節和產品製造過程各工序的以及最終都進行嚴格控制,要求有關數據及文備並符合規定,以確保出廠的產品質量合格。
  11. Destructive tests on welds in metallic materials - hot cracking tests for weldments - arc welding processes - part 1 : general iso 17641 - 1 : 2004 ; german version en iso 17641 - 1 : 2004

    金屬材料焊接的有損.焊的熱裂.弧焊過程.第
  12. Destructive tests on welds in metallic materials - hot cracking tests for weldments - arc welding processes - part 3 : externally loaded test iso tr 17641 - 3 : 2004 ; german translation of cen iso tr 17641 - 3 : 2004

    金屬材料焊接的有損.焊的熱裂紋.弧焊過程
  13. The present research subject applies supersonic and pressure sensitive techniques of the nondestructive inspection technology in the tensile test of the samples, replacing the old manual operation, manual measurement and naked - eye inspection

    本課題在無損探測技術中選擇超聲技術和壓力傳感器應用到拉伸測中,取代人工操作、手工測量、肉眼觀察的落後方法。
  14. Test conditions of machining centres. part 7 : accuracy of finished test piece

    加工中心..第7部分:精加工精度
  15. Test conditions of precision machining centres. part 7 : accuracy of a finished test piece

    精密加工中心..第7部分:精加工精度
  16. Test conditions for internal cylindrical grinding machines with horizontal spindle - testing of accuracy

    臥軸式內圓磨床.精度
  17. Ship systems and equipment - threaded fasteners - inspection, test, and installation requirements

    船舶系統和設備.螺紋緊固.和安裝要求
  18. Procedure for inspection, testing and acceptance of aluminium - base and magnesium - base ingots and castings

    鋁基和鎂基鑄錠和鑄收程序
  19. Compile the inspection and test plan of components purchased including process inspection and final acceptance inspection

    制定采購部計劃,包括過程和最後收程序的計劃。
  20. Machines tools - test conditions for external cylindrical and universal grinding machines with a movable table - testing of the accuracy

    機床.工作臺移動式外圓磨床和萬用磨床的.精度
分享友人