次要載荷情況 的英文怎麼說

中文拼音 [yāozǎiqíngkuàng]
次要載荷情況 英文
minor loading condition
  • : Ⅰ名詞1 (次序; 等第) order; sequence 2 [書面語] (出外遠行時停留的處所) stopping place on a jou...
  • : 要動詞1. (求) demand; ask2. (強迫; 威脅) force; coerceⅡ名詞(姓氏) a surname
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 荷名詞(蓮) lotus
  • : 名詞1 (感情) feeling; affection; sentiment 2 (情分; 情面) favour; kindness; sensibilities; fe...
  • : Ⅰ名詞1 (情形) condition; situation 2 (姓氏) a surname Ⅱ動詞(比方) compare Ⅲ連詞[書面語] (...
  • 次要 : less important; secondary; subordinate; minor; next in importance
  • 載荷 : load; loading載荷變化 load fluctuation; variation in load; 載荷裝置 load device
  1. In view of this situation this article has conducted research to the design of metallurgy auxiliary biography with the frequency conversion table electrical machinery first multianalysis to the frequency changer and the frequency conversion table electrical machinery movement characteristic is carried out, the voltage waveform harmonious which the frequency changer outputs is big, attacks in a big way, and the voltage climbing rate reaches as high as 6600v / mu s which is 20 times ordinary sine alternating voltage, the rolling mill auxiliary biography table set the extremely strict request to the electrical machinery ; its movement frequency is very low, rate frequency in 8 - 20hz ; the velocity modulation scope is wide, the lowest movement frequency lowers to 1hz, and the starting number of times is quite frequently, each hour reaches as high as 600 - 800 time, the impact shoulders in a big way, the overload capacity request is high

    針對這一本文對冶金輔傳用變頻輥道電機的設計進行了系統研究。首先對變頻器和變頻輥道電機的運行特性進行詳細分析,變頻器輸出的電壓波形諧波大,沖擊大,電壓上升率高達6600v / s ,是普通正弦交流電壓的20倍;軋機輔傳輥道對電機提出了十分嚴格的求:其運行頻率很低,額定頻率在8 - 20hz ;調速范圍寬,最低運行頻率低到0 . 5hz ,起動數相當頻繁,每小時高達600 - 800,沖擊負大,過能力求較高。
  2. The bottom roller and sub - bottom roller of hcr is calculated about its equivalent stress, contact stress and the distributing of pulling - stress along the inside track of hcr. also, effects of hollowness and pinch fit are analyzed on bearing stress and rated load

    計算預負空心圓柱滾子軸承的最底部滾子和底部滾子的等效應力、接觸應力和滾子內圈拉應力的分佈,分析滾子空心度和過盈量對軸承應力和額定的影響。
  3. According to the characteristic of nine - area diagram of substation vol / var coordinated control, this system gives the defination of fuzzy sets and the degree of membership of input / output variables, and designs corresponding control rules. the results of simulation demonstrate the system can satisfy the constrains of the day - adjusting times of the switching of on - load transformer and paralleled compensation capacitors, and ensure voltage quality, reactive power basical balance. considering the var requirement in different load time period and the control demand in load saltation, a improved control scheme is provided. the results of simulation show the improved scheme can meet the demand of vol / var in different load time period, protect the wrong operation when either voltage or reactive power appears saltation, and decrease the times of regulation of the switching of on - load transformer and paralleled compensation capacitors finally, a background software module of substation vol / var coordinated control is designed, based on the supervisory control and data acquisition system of substation

    模擬結果證明該系統能在各種負條件下確保電壓合格和無功基本平衡,且能滿足變電站對有調壓變壓器分接頭日調節數和並聯補償電容器組的日投切數的限制。通過考慮不同負時段對無功功率的需求和負突變下的控制求,對上述模糊控制策略進行了改進,模擬結果證明改進后的控制策略能滿足不同負時段對電壓和無功的求、抑制電壓或無功突變下的誤動作,且有效地減少了有調壓變壓器分接頭和並聯補償電容器組的調節數。最後基於變電站scada系統設計了一后臺電壓無功綜合控制軟體模塊。
分享友人