次高壓 的英文怎麼說

中文拼音 [gāo]
次高壓 英文
intermediate pressure
  • : Ⅰ名詞1 (次序; 等第) order; sequence 2 [書面語] (出外遠行時停留的處所) stopping place on a jou...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 壓構詞成分。
  • 高壓 : 1 (殘酷迫害; 極度壓制) high handed 2 [氣象學] (高氣壓) high pressure3 (高電壓) high tension...
  1. Results : the optimum extraction process was as follows, adding 8 times of 50 % alcohol into coptis meal, refluxing and extracting for 2 times, one hour every time

    結果:最優提取工藝為中等粒度的醋延胡索, 50 %的乙醇, 8倍溶劑量,提取2溫減濃縮。
  2. 4. it is the first time that eclogite conglomerates are discovered in maotangchan and fenghuangtai formations. this suggests that ultra - high pressure metamorphic rocks in the dabie orogenic belt exhumed to the earth ' s surface in lower cretaceous. the geochemistry data indicates that the protoliths of the eclogite gravels formed in a structure setting of volcanic arc

    在毛坦廠組、鳳凰臺組中發現了榴輝巖礫石,這一發現表明大別造山帶超變質巖在早白堊世已經折返到地表,而且地球化學研究表明這些榴輝巖礫石的原巖形成於巖漿島弧構造背景。
  3. The aircraft used throughout the hydraulic system, two aircraft integration design pressure and pressure and pressure and can independently accomplish suing time control moves make big vehicles with tight solid, more eggective your savings artificial, time, electricity and lower costs, improve efficiency, it can help make up the hydraulic pessure at the end of the department to achieve shoes second fill pressure of functions to enhance the quality of diesel

    本機採用油系統,兩機一體設計,邊及前後均能獨立完成,採用時間控制動作,出力大,貼合緊牢固,更為你有效的節省人工、時間、電力及降低成本,提工作效率,可以彌補全油底機死角之處,達到鞋子二之功能,提升著品質。
  4. As to the work about theory analysis, at first, the paper describes the atomizing and humidifying process of the centrifugal nozzle with firing pin type, high pressure and little aperture and liquid physical properties. later, combining with the structure characters of this kind of nozzle, the paper studies on the theory of the atomizing and humidifying process by three phases, which is water film forming phase, water film falling into pieces phase, and heat and mass transfer between water and air phase in turn

    理論工作方面,首先描述了撞針型小孔徑離心式噴嘴的霧化加濕過程和液體的物理性質,然後結合撞針型小孔徑離心式噴嘴的結構特點,將其霧化加濕過程分三個階段進行機理上的研究,這三個階段依為液膜形成、液膜初破碎及二霧化、水與空氣的熱濕交換。
  5. 5 the fugacity coefficients, residual enthalpies and residual entropies of the pure fluids at low temperatures and high pressures were predicted with the general quintic virial equation

    10 。 5用上述通用五維里方程預測了純流體在低溫下的逸度系數、剩餘恰和剩餘嫡。
  6. Second, the paper in - depth discuss the reinforce foundation operation mechanism of technique of composite grouting, including spray incise action of high pressure spray flow to soil, mill metathesis concretion action, and penetrate, split, crush action of serum to soil, etc. third, the paper in - depth study design calculate of composite grouting, design of composite grouting technic parameter

    ,本文對復合注漿法加固地基的作用機理進行了深入的探討,包括噴射流對土體的噴射切割作用、漿液與土的攪拌置換固結作用以及漿液對土體的滲透、劈裂、擠密作用等問題。第三,本文對復合注漿的設計計算、注漿技術參數的設計進行了深入的研究。
  7. Further more, the coherence between circulation and olr are calculated and analyzed. the results show that there is positive correlation between australian high and the precipitation of middle and low reaches of yangtze rivers, and negative correlation between okhotsk and the precipitation of middle and low reaches of yangtze rivers

    由相關分析得出,春季鄂霍克海區與澳大利亞區和長江中下游地區夏季olr值分別表現出較好的正相關和負相關,表明這兩個地區位勢度場的變化與夏季長江中下游地區降水多少有著密切的關系。
  8. Product once moldings, change traditional cut out wear comfortable, by high temperature high pressure shapes behind, possesses color voluptuous, feel soft, does not loose unremitting wait for feature, very incurs consumer favor on international market

    產品一成型,改變了傳統的裁剪穿著舒適,經定型后,具有顏色艷麗,手感柔軟,不松不懈等特點,在國際市場上很受消費者青睞。
  9. We can use the mm5 model in definite time, definite area weather forecasting. we conclude that : : the moving route of this necw in its developing progress was direct - south along latitude, the cold air is rough, and just this made the rough vertical velocity ; the necw southern moving and conflicting with the west pacification sub - tropical high makes rough jet steam. the plenty south - west warm and wet air made by the jet stream gave the rainstorm demanded vapor ;. the rough vertical velocity by jet stream is a main reason in this rainstorm ; the mm5 model uses four - direction analysis data as its input, this avoids some errors occurred in observe and transfer, thus made the result more useful

    綜合分析認為: ( 1 ) 、這冷渦在其發生發展過程中,其移動路徑是沿經圈直線南,攜帶的冷空氣勢力較強,形成槽后較強的垂直運動; ( 2 ) 、西太平洋副熱帶偏北位置與東北冷渦南形成的急流軸,把源源不斷的西南暖濕氣流輸送到遼西地區,也就是急流軸的左前方位置,為這暴雨的產生提供了充足的水汽來源; ( 3 ) 、低空急流不但為暴雨輸送水汽,其造成的較強的垂直環流也是產生強降水的一個主要原因; ( 4 ) 、 mm5模式以四維同化資料作為初始場,最大限度地避免了觀測誤差可能造成的積分不穩定,提了模擬結果的參考價值。
  10. The forming process of gas reservoirs includes three stages, that is, the formation of the primary gas pools with high temperature and high pressure, the leakage of the primary gas pools and the formation of the secondary gas pools, and late adjustment and maintenance of the secondary pools

    形成過程主要經歷了下部原生氣藏的形成、原生氣藏泄生氣藏的形成、生氣藏的長時間調整3個階段。
  11. Torsional interaction exists between hvdc converters and turbine - generators, and negative electrical damping provided by hvdc may cause subsynchronous oscillation ( sso ) that can lead to turbine - generator shaft failure and electrical instability at oscillation frequencies lower than the fundamental system frequency

    直流輸電( high - voltage - direct - current - - - - hvdc )系統與臨近同步發電機組之間存在著扭振相互作用, hvdc的電氣負阻尼作用有可能引起機組在同步頻率范圍的扭轉振蕩。
  12. The diagnostic analysis for the sandstorm process on the base of height, temperature, pressure and wind etc output from the model shows that the upper cold trough, low - level wind shear, surface cold anticyclonic ridge, mesoscale cyclone and cold front are the main synoptic systems, surface cold anticyclonic ridge and cold front provide condition of wind force to occurrence of the sandstorm weather, the strong mesoscale cyclone before front makes pressure gradient before and after cold front obviously strengthen, moreover, and it increases obviously the temperature of the controlled area, as a result, the updraft movement caused by convergence before front strengthens

    500hpa強鋒區、 700hpa切變和鋒前中尺度系統的強弱及位置變化是沙塵暴天氣發生發展到減弱的直接原因。地面冷、地面氣旋及冷鋒是造成本沙塵暴天氣的主要地面天氣系統。地面冷及冷鋒為沙塵暴天氣的發生提供了風力條件,而中尺度氣旋使冷鋒前後氣梯度明顯增強外,又使所控制的區域增溫明顯,使鋒前輻合上升運動加強,為沙塵暴天氣的發生提供了熱、動力條件。
  13. High voltage shunt capacitor installation is comp - rised of capacitor cabinets or steel racks capacitor, special fuses for capacitor overload protection, capaci - tor discharge device, air - cored reactor which is applied to restrain surge current and high frequency harmonic, zno arrester without gaps for overvoltage - limiting and high voltage vacuum switch etc. capacitor cabinet is

    並聯電容器成套裝置主要由電容器櫃或鋼架電容器電容器過負荷保護專用熔斷器放電裝置專用放電線圈或電互感器,抑制涌流限制諧波的空芯電抗器和限制過電的無間隙氧化鋅避雷器及真空開關
  14. Different deformation stages of the dabieshan mountains and uhp rocks exhumation mechanism

    大別山的構造變形期和超巖石折返的動力學
  15. The graphitized cathode block samples have been trial - produced using high quality eca ( electrically calcined anthracite ) rationed petroleum coke and pitch coke and quantitative pitch used as raw materials by the conventional carbon technics concluding moulding, baking, high pressure impregmating, after - baking and graphitization

    摘要選取優質電煅無煙煤,分別配以一定比例的石油焦和瀝青焦作為骨料,與煤瀝青混合后按照模成型、焙燒、浸漬、二焙燒和石墨化等常規炭素製品生產工藝流程制備石墨化陰極材料試樣。
  16. Since first used in the wujiangdu hydraulic power station with success, high - pressure grouting ( orifice - closed grouting method ) spreads rapidly in the carst region and lots of experience are accumulated

    灌漿(即孔口封閉灌漿法)自烏江渡電站首採用並取得成功后,在巖溶地區得到了迅速的推廣,集累了十分豐富的實踐經驗。
  17. A test - bed of dg45 - 80 10 hypo - pressure feed water pump is designed, based on which the general on - line performance testing system is developed and the thermodynamic method is introduced to measure the efficiency of the pump. a new programming technology combining vc + + with matlab is presented by which the vibration monitoring system of boiler feed water pump is developed successfully to perform data analysis after on - line acquisition

    本文首先進行了次高壓鍋爐給水泵dg45 80 10實驗臺的設計,在此實驗臺設計成功並安裝調試通過的基礎上,開發了鍋爐給水泵通用性能試驗系統,包括測點的布置、各型測量儀器的選購,設計,安裝和調試以及軟體平臺開發。
  18. Shanghai shengneng xinghuo thermo - power plant equipped with two 12, 000 kw generators and four 75 ton / h pressure boilers, providing 250 - ton steam per hour

    已建成投產的上海申能星火熱電廠,配有次高壓鍋爐4臺和12000千瓦發電機組2臺,每小時可供蒸氣250噸。
  19. According to thinking relevant to the formulation of the scheme for the project of recovery of waste heat from low - temperature blown gas, the design of a short - type unit with water - cooled walls for co - production of heat and power from subhigh pressure blown gas

    摘要按編制低溫吹風氣余熱回收工程方案的有關思路,介紹了帶水冷壁的矮型次高壓吹風氣熱電聯產裝置的設計情況。
  20. Pe pipe is used for gas engineering so early overseas that urban gas pipeline network in many developed country is made up of pe pipes, which are developing in the trend of hypo - high pressure gas transmission system. these coutries are extending the use of pe100, the fourth generation of pe product. meanwhile, they have advanced and well - developed technology standard from manufacturing to application

    國外在聚乙烯燃氣管道應用上起步較早,許多發達國家的城市燃氣管網均採用聚乙烯管道,目前正在逐步向次高壓燃氣輸配系統延伸,大面積推廣使用pe100級第四代聚乙烯產品,並擁有一套從原料生產到工程施工的先進的完備的技術標準體系。
分享友人