比長計 的英文怎麼說

中文拼音 [zhǎng]
比長計 英文
comparator
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. Many engineering experience demonstrate that in order to elevate subbase working properties, lower project investment, prolong pavement using life - span and raise synthetical benefic,

    大量的工程實踐表明,為了提高基層工作性能,延路面使用壽命,必須在配合時將抗裂性考慮在內。
  2. The feature is some 27, 000 light - years long ( 7, 000 light - years longer than expected ) and sits at a 45 - degree angle to the galaxy ' s main plane

    這一棒狀結構約27千光年(7千光年) ,與銀河平面相交成45度角。
  3. On one hand, is the product of beam waist radius and half divergence angle, wavelength is not involved. so there is possibility to compare the acutal focusing ability among laser beams with different wavelength. on the other hand, is a calculated result by measuring experiment, and it is more brief and persuadable than m 2factor, since the latter one is a ratio with basic mode gauss beam

    論文研究論證了用值評價激光光束質量的實際意義在於兩個方面,一方面它僅僅包含了光束束寬和發散角,不涉及波的因素,使不同波激光束的可加工能力具有可性;另一方面,值是根據對光束傳輸路徑上不同位置處束寬實際測量結果的算值,其在與基模高斯光束進行算得到的m2因子更簡潔、更有說服力。
  4. The dispersibility as well as seepage distortion and salt transference under long - term seepage condition of soil samples obtained from the clay core wall in xijiao and sanping reservoirs were studied by physical and chemical properties of soil and composition of clay mineral and the tests for identification of dispersive clay soils which included double - hydrometer test, pinhole test, crumb test, tests to defermine salt content of pore water and percentage of exchangeable sodium

    摘要應用碎塊、針孔、雙、孔隙水可溶鹽和交換性鈉百分等五種試驗方法,結合物理化學性質和礦物成分分析,對西郊、三坪兩水庫大壩心墻土樣進行了多種方案的分散性試驗及期滲流條件下的滲透變形試驗和鹽分運移試驗。
  5. Jeroen van der veer , chief executive of royal dutch shell , will stay in office a year longer than had been planned and step down in june 2009 , the company said

    荷蘭皇家殼牌公司表示,該公司首席執行官范德偉的任期將劃的時間延一年,他將於2009年6月卸任。
  6. Any additional nights will be charged on pro - rata basis

    住宿期將按
  7. The main points of hlsip quality control includes : during the design stage, it is necessary to control the scheme comparison and optimum design, esp. the waterwork, electromechanical device and irrigation region planning, to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period, the supervisor should help proprietor choose construction contractor, sign the construction contract, supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition, the contractors must improve their quality self - control, maintain the notion " quality first " and insist the full process, multiway, and multi system control of construction quality

    高揚程梯級提水灌溉工程質量控制的重點包括:設階段控制好方案對、設優化,特別是水工建築、機電安裝、灌區規劃等多專業多目標的確定和協調,提高設質量和深度,注重控制設成果的期效益;施工階段協助業主選擇好施工承包商,制定出嚴謹、完備的施工合同,搞好設備監造,嚴格執行質量控製程序,使工程施工時時處于受控狀態;同時要提高承包商的質量自控能力,堅持施工質量的全過程、多方法、多體系控制。
  8. Between 1989 and 1999, labour productivity in the local manufacturing sector, as measured by the ratio of industrial production index to the manufacturing employment index, increased by an average of around 10 per cent per annum

    盡管如此,一九八九至一九九九年間,本地製造業的勞工生產力,以工業生產指數相對于製造業就業人數指數的算,平均每年增約一成。
  9. During the 10 years 1989 to 1998, labour productivity in the local manufacturing sector, as measured by the ratio of the industrial production index to the manufacturing employment index, increased by an average of around 11 per cent a year

    一九八九至一九九八年的十年間,製造業的勞工生產力,以工業生產指數對製造業就業人數指數的算,平均每年約增11 % 。
  10. In the light of its special property being not easy to gain strength, through mechanics researches on different methods to stabilize this kind of low _ liquid _ limit silty soil as subbase material, evaluated both technically and economically, we have got a cement lime stabilization plan to meet the index requirements for non _ side _ limit strength of compression of subbase of class2 road stipulated in the specification ; by means of improving the workmanship, thickening the loose layer of soil, adding soil on covering weave fabric before compaction, such problems can be solved as very poor compaction, loose surface during compaction, roughness and unevenness, coats of layer and shear damages

    本文針對黃河沖積而成的低液限粉土其粘粒含量極低、土的不均勻系數很小、膠體活性差的工程特性,通過採用不同方法穩定該類土作底基層材料的力學性能研究,從技術、經濟角度綜合評價,得到滿足規范抗壓強度指標要求的水泥石灰穩定方案。通過對原材料、試驗配合、施工、等方面進行優化,從而顯著減輕了基層的早期及期縮裂程度,從而提高了路面的耐久性。
  11. Fifty - five percent also said their installations went over budget, and 57 % said the installation process took longer than expected

    受訪者表示,他們的安裝費用超出預算, 57 %的人表示安裝過程的時間要
  12. Completion of the building work is taking longer than expected

    建築工程的竣工時間要
  13. According to monotonic p - relations for cfrst, the parameters such as axial compression ratio, slenderness ratio, steel ratio, steel strengh and concrete strength, which affect p - hysteretic curves, are analyzed. 3

    並通過數值算的荷載-位移單調曲線,分析軸壓、含鋼率、鋼材強度、混凝土強度、截面寬厚、強弱軸等參數對矩形鋼管混凝土壓彎構件p -滯回關系曲線的影響。
  14. After the evaluation of the three parameters in the proposed creep model, which is based on the large numbers of experimental measurements of concrete creep, the influential regularities of concrete filled steel tube columns under long - term loading are investigated. by dispersing time, the method of tangent modulus is adopted to study the relation of creep strain and load time. in the end, this paper took cft specimens with representative geometry and sectional dimensions as examples and adopted the proposed method as an approach to investigate the influencing regularities of many factors, which include the ratio of long - term load to strength, the slenderness ratio, the eccentricity ratio, and the intensity grade of concrete, on cft structures

    在對鋼管混凝土構件期荷載效應的分析中,本文基於三維粘彈性理論,採用三參數粘彈性模型,提出了核心混凝土徐變的三維有限元分析理論,在總結過去大量關于混凝土徐變試驗實測結果的基礎上擬合了模型中的三個參數,並成功將其應用於鋼管混凝土徐變的三維分析算中,得到徐變與持荷時間的關系,以典型截面形式的圓鋼管混凝土軸壓、偏壓構件為例,對軸壓、含鋼率、偏心率以及核心混凝土等級分別進行了大量的參數分析和實驗對研究,結果表明二者符合較好。
  15. The explosive expansion of the surrounding air produces the rolling sound of thunder. as a rule of thumb, if the sound of thunder reaches an observer three seconds after a lightning flash, the thunderstorm is about one kilometre away from the observer

    簡單來說,在看見閃電后三秒才聽到雷聲,表示雷暴距離觀察者約一公里,真正的距離依時間短按算。
  16. The prospect that the american economy might grow faster than expected thanks to interest - rate cuts has also fuelled concern

    而由於利率降低,美國經濟的要增得快些,也增添了幾分擔心。
  17. Realistically, does your experience and intuition tell you that some tasks will take longer than you ' ve estimated

    現實地說,經驗或直覺是否告訴您某些任務可能需要值更的時間?
  18. Such complaints have become louder since a desultory gathering of trade ministers in geneva broke up on july 1st, earlier than planned and with virtually no progress to report

    自從七月一號混亂的日內瓦貿易部會議破裂后,劃早而且實質上沒有任何進展,這種抱怨聲更大。
  19. Worldwide pc shipments have lately been growing by about 12 % a year ? better than expected, though still a far cry from the late 1990s, when the industry sometimes grew at more than twice that rate

    最近,全球個人電腦出貨量保持了12 %的年增量,盡管與上世紀90年代後期,整個行業的年出貨量有時甚至會增兩倍以上相仍然有很大的差距,但這已經的要好。
  20. As a rule of thumb, if the sound of thunder reaches an observer three seconds after a lightning flash, the thunderstorm is about one kilometre away from the observer

    簡單來說,在看見閃電后三秒才聽到雷聲,表示雷暴距離觀察者約一公里,真正的距離依時間短按算。
分享友人