水下載具運動 的英文怎麼說

中文拼音 [shuǐxiàzǎiyùndòng]
水下載具運動 英文
motions of under water vehicle
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • 載具 : rov
  • 運動 : 運動[舊時用語] arrange things or get things done through pull
  1. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充分考慮對庫岸滑體穩定性影響的前提,提出了一個適用於長江三峽庫岸滑坡體穩定性分析的綜合分析評價體系,並取得了如幾個方面有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,的活是新滑坡形成或古滑坡復活的主要因素,一方面是由於地位升高降低了滑坡體的有效應力,另一方面是由於地的長期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽庫區的特殊條件,系統分析了作用於三峽庫區滑坡體上的力系和庫位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫位、地震以及庫位由175m調節降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並體給出了相應的作用荷的計算方法,使在庫區岸坡滑體穩定性分析評價時對計算工況選擇及其作用荷的計算更規范性; ( 4 )用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩定性分析的體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對三峽庫區的滑坡穩定性分析是實用可行的。
  2. Consequencely, the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, and the back - analysis and the prediction of the parameters of the dam system have been done according to the operating observed data. the research work involves several aspects as follows : 1 ) a back - analysis model including the prior information and a predictive model of nonlinear time series were established ; 2 ) the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, in which the analysis module of the loading effects, the back - analysis module, the forecasting module of the physical parameters and the assessment module of the operating state were contained ; 3 ) according to the operating observed data, the operating state of the dam was assessed and predicted with the analysis system of the operating state, the results suggested that the dam is in basically normal operation at present

    體工作有以幾方面: 1 )收集整理漫灣電站大壩行監測資料,並對其進行了系統分析,從觀測資料本身直觀的分析了大壩的行狀況; 2 )總結位移反分析的理論及方法,建立了考慮先驗信息多介質位移反分析模型,基於神經網路非線性映射功能,建立了神經網路時間序列預測模型; 3 )以ansys軟體為平臺,開發了漫灣電站砼重力壩行狀態評價模塊,結合荷效應分析、參數反演分析、參數預測分析三個模塊組成漫灣電站砼重力壩行狀態分析系統;實現了對漫灣電站行狀態的態「反演-預測」分析; 4 )利用漫灣電站砼重力壩行狀態分析系統,在漫灣大壩實測資料分析、大壩砼特性參數反分析、大壩砼彈性模量衰變規律及預測分析的基礎上,系統的分析並預測了大壩行狀態。
  3. Main propulsion equipments have been gradually improved. in addition, some additional systems are provided, such as the power station, deck machinery, refrigeration and air condition plant, freshwater generators, drinking water system, steam generating system, ballast and bilge system, and fire fighting system. the management of ship ' s power plant is also known as the engineering management, which is supervised and controlled by the engine department under the direction of the company ' s engine technology management department of the headquarters. owing to the complexity of power plant, the changeability of navigational conditions, and the seriousness of accident ' s consequences, it is essential to explore how to manage the power plant economically and reduce the occurrence of troubles so as to raise the shipping efficiency

    隨著科學技術的發展,不僅推進設備逐步得到完善,而且還增設了諸如船舶電站、起貨機械、冷藏和空調裝置、制淡裝置以及飲、蒸汽、壓縮空氣、壓、艙底、消防等系統。船舶力裝置的管理即輪機的管理,是在船公司機務部門指導由船上輪機部體負責實施。因為船舶力裝置的復雜性、船舶航行條件的多變性、發生事故後果的嚴重性,所以探討如何對輪機進行經濟性管理,減少故障,從而提高船舶的營效率非常重要。
分享友人