水位標高 的英文怎麼說
中文拼音 [shuǐwèibiāogāo]
水位標高
英文
water level elevation- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 位 : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
- 標 : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
- 高 : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
- 水位 : stage; water level
- 標高 : [測量學] elevation; level; altitude (飛行); datum mark; height mark
-
The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage
錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。One method of preventing seawater intrusion is to reduce offtake to a planned level.
防止海水入侵的一種方法是減少開采量使其達到設計的地下水位標高。The problem of modeling and control is a attention focus of people. the boiler water lever is importance index of industry boiler safety and satabilization. it is importance meanimg to ensure water level in definite range for increasing quality of steam and reducing wastage of equipment and insuring safety of whole hert - power - net at present, the mostly method is adopt the routine pid control
鍋爐的建模與控制問題一直是人們關注的焦點,而汽包水位是工業鍋爐安全、穩定運行的重要指標,保證水位控制在給定范圍內,對于提高蒸汽品質、減少設備損耗和運行損耗、確保整個網路安全運行具有重要意義。Future inside 5 years, the company makes progress have international to precede horizontal high - tech tastes center of research and development, international to standardize large - scale production base, modern form a complete set complementary stuff other people sheds the large industry group with trinitarian center, the company appears on the market successfully already
未來五年內,公司將發展成為擁有國際領先水平的高科技品研發中心、國際標準化大型生產基地、現代化配套輔料物流中心三位一體的大型產業集團,公司已成功上市。Trinity house high water mark
引航公會高潮水位標志Two methods were used to provide water quality ratings in bio - assessment using biotic index ( bi ), ( 1 ) using the sampled sites meet the criteria for undisturbed and minimally impaired conditions, the confidence in the distribution of bi value for the 75th percentile to be used as the criterion dividing " unimpaired " form " impaired ". any values below the 75th percentile were considered as " excellent ", and values above the 75th percentile, was quadrisected for different water quality ratings
採用兩種方法研究m指數劃分水質級別的標準: ( 1 )無污染樣點的m指數值法,以75分位數值作為最清潔水質標準,將高於此值的可能分佈范圍一等分,分別代表不同的水質級別zk )所有樣點(污染與無污染樣點)的bi指數值法,以5分位數值作為最清潔水質的標準,將高於此值的可能分佈范圍4等分,分別代表不同的水質級別。Sequences, including their high watermark
序列,包括它們的高水位標志。This essay focuses its study and comparison on the tendering system of international financial organization, raises the necessity of foreign loan tendering system, considering the existing tendering situation in fields of capital construction, mechanical equipment, imported electrical and mechanical equipment, government purchasing and foreign loan purchasing, and gives constructive views in tendering and bidding procedure of project construction agencies and construction supply enterprises, so as to improve the construction level of the foreign loan projects in our country, increase the bidding ability of our enterprises for participating international projects, and promote the establishment and improvement of the tendering and bidding management system in our country after learning from tendering purchasing system abroad
本文主要研究和對比國際金融組織的招標制度,結合我國在基本建設項目、機械成套設備、進口機電設備、政府采購、國外貸款采購等領域的招標投標現狀,提出研究國外貸款招投標制度的必要性並結合實際工作經歷,為我國項目建設單位和貨物與工程供應企業在招標投標環節提出建設性意見。以期提高我國利用國外貸款項目的建設水平,提高我國的企業參與國際工程投標能力,並借鑒國外招標采購制度,加快我國招投標管理體制的建立和完善。Directed by the advance theories of sequence stratigraphy, reservoir beds sedimentology, seismic stratigraphy and petro - geology, measured by exactitude seismic procession, analysis of seismic facies, analysis of single well lithfacies and sedimentary facies, study of macro and micro character of reservoir and diagenesis, this paper study comprehensively the stratigraphy sequence, the type and distributiong of sedimentary facies, reservoir properties, the diagenesis and the evolution of pores of the 2nd and 3rd parts of pingdiquan formation of permian in wucaiwan - shishugou region in jungan basin. we can optimum seek favourable target area and apply the study results on oil field production in order to solve the difficult questions. we mainly achieve several views as follows : l ) establish the sedimential sequence framework of permian formation in studying area and delimint the jiangjunmiao formation of middle dyas series as lowstand system tract, the lower of the second part to the third part of pingdiquan formation of middle dyas series as transgressive system tract, the upper of the second part to the first part of pingdiquan formation as highstand system tract
以層序地層學、儲層沉積學、地震地層學、石油地質學的先進理論為指導,以地震資料精細目標處理、地震相分析、單井巖相分析、沉積相分析、宏觀和微觀儲層特徵分析及成巖作用研究為手段,對準噶爾盆地東部五彩灣? ?石樹溝地區二疊系平地泉組二、三段的地層層序、沉積相類型及展布、儲層物性特徵、成巖作用及孔隙演化進行綜合研究,優選出有利勘探區帶,並將研究結果應用到生產中,解決生產中的難題,主要取得了以下幾點認識:建立了工區內二疊系沉積層序框架,把中二疊統將軍廟組地層劃為低水位體系域,中二疊統平地泉組二段下部三段地層為水進體系域,二段上部一段地層為高水位體系域。However the diversion tunnel is generally discarded after used, because the construction period of hydraulic power station is pressing, the lining standard of tunnel needs being improved and the up and down steam water level is difficult to be joined
而導流洞在完成導流任務后,又往往因為工期緊,襯砌標準需提高,上下游水位銜接等困難而被廢置不用。There may be widespread changes in ground elevation as well as horizontal or shear displacements.
地面標高可能發生廣泛的變動,也可能發生水平位移或剪切位移。Use the db heap top column in the database snapshot to see the high water mark of dbheap usage
使用數據庫快照中的db _ heap _ top列來查看dbheap使用的高水位標記After registering sub - capacity offerings, itlm will monitor the use of all sub - capacity licenses via their part numbers and will record the monthly high water mark which represents the maximum copies of the sub - capacity supported product run concurrently
在注冊隨需添加解決方案之後, itlm將通過他們的部件登記號監視所有隨需添加許可的使用情況,並記錄每個月的高水位標記,這表示支持隨需添加的產品同時運行的最多副本數量。Column needs to be retrieved from
列的高水位標志需要從The lining of a tunnel in the area with high groundwater table does not bear high external water pressure in - normal, the surrounding rock reinforced by intrusion concrete does it. in the case, the groundwater through reinforced rock accumulated in the space between lining and rock must be drained in time
一般鐵路隧道通過高水位富水區時,不用襯砌直接承受較高的外水壓力,要實現這個設計目標必須做好襯背的排水工作,使通過加固圈滲透過來的水量及時排走,及時削減累積的水量。Another hidden danger is the weakening of the impervious ability of the dam resulting from the closeness of the height of line seepage of the reservoir water level to the contact plane between the residual solum, talus solum and basement rocks
水庫水位浸潤線標高和殘坡積土與基巖接觸界面標高較接近,而使此高程的防滲能力更加薄弱,這也是此壩體的隱患之一。Trinity high water mark
引航公會高潮水位標志Experimentation of sewage pumping station based on predictive control with vvvf is carried out. the experimentation result shows that the sewage pumping station predictive control system can be running under the condition of high water level. by using this control mode, inflow sewage is pumped out entirely
在模擬研究基礎上,搭建了模擬試驗系統,在實驗室條件下,對污水泵站排放系統進行了結合變頻調速的預測控制模擬試驗,試驗結果表明,採用預測控制,可以使系統運行在高水位低揚程的工況下,使流入泵站管網的污水等量排出,實現了節能無污的控制目標。The in - situ testing includes surface deformations, sub - surface movements, earth pressures, pore water pressures, underground water levels, spt, stresses of pipes and pipe - soil contact stresses. in addition, the total jacking forces, deviations in line and level of the pipe line and earth pressures in the earth pressure balance machines ( epbm ) are also recorded. the results of field - testing are analyzed, and the variety of testing datum include earth pressures, pore water pressures and underground water levels during the course of the shield through it are studied
現場測試內容包括地面變形、深層土體變形、土壓力變化、孔隙水壓力變化、地下水位變化、土體標準貫入試驗、管道內力變化、管土接觸應力變化以及頂管施工現場記錄(包括頂力、土壓力、平面偏差、高程偏差等) 。Third, five schemes based on the combination different precipitation and pumping quantity is applied to the model prediction to predict the water laver in springs zone and high - point groundwater quantity exploited in 2010
本通過對多種巖溶地下水開采方案預報對比,協調處理互為矛盾的「保泉」和「供水」目的,最終預報濟南市泉群地下水位標高,確定巖溶地下水的開采方案。分享友人