水位測量室 的英文怎麼說

中文拼音 [shuǐwèiliángshì]
水位測量室 英文
gauge chamber
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 水位 : stage; water level
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  1. The sage, gno and gallex all used gallium for the detection. another one was the super - kamiokande which was 30 times larger than kamiokande ii and used highly purified water. the sudbury neutrino observatory, built at a depth of 2 km in ontario in canada, used heavy water d

    各個不同的太陽中微子實驗在八九十年代如雨後春筍般興建,例如利用鎵原素的sage gno及gallex ,比神崗2號大30倍,利用高度純的超級神網號,以及於加拿大安大略省地底2公里,利用重的sudbury neutrino observatory 。
  2. Chapter two ascertains main technological factor of dong gou lock reconstructing, including forecast the cargo and volume through the lock to reason about representative type of vessel designed for through the lock and its operation organize. chapter three design the renovate engineering through ascertaining the main technological factor scale of the lock, dimension, designed water level and altitude, including design of structure of the lock, lock chamber and lock gate, and select the main technological factor and pattern of headstock gear. chapter four draws a comprehensive compare of the two design scheme of the renovate project with engineering project economy evaluation method, and makes out the recommended scheme, and furthermore, to calculate the economic evaluation index of the recommended scheme and makes the economic sensitivity analysis of the scheme and finally demonstrate economic feasibility of the scheme

    本論文共分四章:第一章主要介紹了原東溝船閘的地理置和營運現狀,說明了船閘在航道建設和資源綜合利用中的作用及東溝船閘改造的必要性;第二章東溝船閘改造的主要技術因素確定其中包括東溝船閘過閘貨種和貨運發展的預,並確定東溝船閘的設計代表船型及營運組織;第三章東溝船閘改造工程設計本章通過船閘改造工程主要技術參數:船閘規模、尺度、設計和高程等的確定,設計了二個船閘改造方案,包括鋼筋混凝土整體塢式閘首結構、閘和閘門的設計,並選定了啟閉機的主要技術參數和型式;第四章採用了工程項目經濟評估方法對東溝船閘改造工程二個設計方案進行全面綜合比較后,確定了推薦方案。
  3. Length, diameter, density, fresh weight, dry weight, water content, osmotic potential and element concentrations ( ca, mg, na, k, cl ) were determined for each. seedling of b. gymnorrhiza and a. corniculatum were cultured for 60 days on various salinity of seawater ( 0, 5, 10, 15, 20, 30, 40, 50 ) in green house. samples were taken at 3, 7, 11, 15, 22, 30, 45 and 60 days after planting, separated into root, hypocotyl, stem and leaf

    本文研究了福建九龍江口木欖和桐花樹胎生繁殖體從果實形成到發育成熟過程中形態、生物、含、胚軸密度、滲透勢、五種主要礦質元素( ca 、 mg 、 na 、 k 、 cl )等的變化和溫內人工鹽度梯度栽培下木欖和桐花樹成熟繁殖體長成幼苗( 0 60d )過程中形態、生物、含、滲透勢、光合蒸騰特性、五種主要礦質元素( ca 、 mg 、 na 、 k 、 cl )等的變化;並且在野外自然條件下,跟蹤調查不同灘塗置下秋茄成熟繁殖體定居成活、自然死亡狀況以及定幼苗生長過程中( 1年)形態、生物、含、光合蒸騰特性等的變化。
  4. The contents of this paper include the following several aspects : ( 1 ) a model of the fractures leakage is built through counting and analyzing the wealthy geological records of hae field, and a model of the fracture water transporting is also built according to the fracture water condition of its recharge and its runoff and its discharge in hae field ; ( 2 ) this paper studies the chemical behavior and the migration parameters of the elenent sr2 + in ground water in hae field, the main contents include : the presence form of the element sr in ground water is analyzed by way of the rmodynamics ; the absorption mechanism that granite and sand stone absorbs sr element is analyzed based on theory and experiment test the diffusion parameters of the element sr in water and in granite and in sand stone are researched with laboratory experiment test ; the partition coefficient of sand stone and granite to sr is tested by the batch way

    其研究內容包括以下幾個方面: ( 1 )通過對我國hae預選處置場豐富地質資料的大統計和分析,建立了該處置場的基巖裂隙滲透模型。再根據hae預選處置場基巖裂隙的補給、徑流、排泄條件及動態特徵,建立了預選處置場基巖裂隙運動模型。 ( 2 )對高毒性鍶元素在我國hae預選處置場地下中的化學行為和遷移參數進行系統的研究,其中主要包括運用熱力學方法分析了鍶元素在地下中的存在形態,利用理論分析與實驗試相結合的方法分析了花崗巖和砂巖對核素鍶的吸附機制,採用內實驗裝置研究了核素鍶在地下中的擴散參數以及在花崗巖和砂巖中的本徵擴散參數,採用靜態批式法研究了鍶在砂巖和花崗巖中的分配系數。
  5. Experimentation of sewage pumping station based on predictive control with vvvf is carried out. the experimentation result shows that the sewage pumping station predictive control system can be running under the condition of high water level. by using this control mode, inflow sewage is pumped out entirely

    在模擬研究基礎上,搭建了模擬試驗系統,在實驗條件下,對污泵站排放系統進行了結合變頻調速的預控制模擬試驗,試驗結果表明,採用預控制,可以使系統運行在高低揚程的工況下,使流入泵站管網的污排出,實現了節能無污的控制目標。
  6. There are three difficulties and key problems in this papaer : : the first problem is what is the dominance bearing of the leakage fractures, and how the bedrock fracture water distribute, the second is how to test the complex chemical behavior in experiment way and quantify the relative parameters, the last question is how to number the transportation of the element 90sr and its pollution to solve the three problems, this paper does lots of work and come to the prospective order, the creativities in this thesis as follow : ( 1 ) the dominance bearing of the leakage fractures and the distribution feature of the fracture water are ascertained based on rich geological data, these basal researches are very important, which are the premises to build the transport model of the fracture water in hae field

    本項研究工作的難點和關鍵問題有三個: hae處置場基巖裂隙系統中,導裂隙的優勢方是什麼,基巖裂隙活躍帶分佈情況如何;怎麼對核素遷移的復雜化學行為進行實驗試並取得有關定化參數;怎樣數值化表現出溶質的遷移行為和污染情況本論文在解決以上三個問題上做了大的工作,達到了預期的目的,其創新之處有以下三點: ( 1 )通過地質資料的分析,首次提出了hae預選處置場基巖裂隙導的優勢方和基巖裂隙活躍帶的大致分佈特徵。它是一個很重要的基礎性研究成果,是建立hae處置場運動模型的前提。
  7. The institute is a geological prospecting organization with independent legal person qualification, integrated with the solid minerals prospecting, geological investigation of hydrological engineering environment, survey construction, rock mineral appraisal and testing, topography, engineering survey, geotechnical survey, foundation construction, geological disaster disposal, risk assessment, mine reclaiming and management etc ; now it has the geological prospecting qualification certificate approved by ministry of land and resources, surveying & mapping qualification certificate approved by hebei bureau of surveying and mapping, accreditation and metrology certification qualification approved by committee on state accreditation and approval, geotechnical engineering survey qualification certificate and foundation construction qualification certificate approved by ministry of construction ; now it has 435 staff with specialized technician 21 % ; advanced geological prospecting equipment and construction machinery and equipment, testing instruments, suitable for large - scale geological prospecting projects ; it has undertook several national and hebei, shanxi provincial largesize minerals prospecting projects, and won many awards such as science & technology progress, and geological prospecting etc

    中化地質礦山總局河北地質勘查院是集固體礦產勘查、工環地質調查、勘查工程施工、巖礦鑒定與試、地形、工程、巖土工程勘察、基礎工程施工、地質災害勘查治理、危險性評估、礦山恢復與治理等為一體的具有獨立法人資格的地質勘查單;現擁有國土資源部認定的地質勘查資質、河北省繪局認定的繪資質、國家認證認可監督管理委員會認定的計認證合格實驗資質,建設部認定的巖土工程勘察資質、基礎施工資質;現有職工435人,專業技術人員占職工總數的21 % ;擁有先進的地質勘查裝備和施工機械設備、實驗儀器,能夠滿足大型地質勘查項目的施工要求;曾承擔多項國家和冀晉兩省的大型礦產勘查項目,並獲科技進步、地質找礦等獎項。
  8. To measure the rate of rainfall, the jardi rate - of - rainfall gauge operates on the principle that the position of the float in a collecting chamber is proportional to the rate of inflow of water

    天文臺以查迪型jardi降雨率器來度降雨率。該器的操作原理在於集雨內浮子的置高低與的注入率成正比。
  9. Regarding the food and water pathway, hko, with the assistance of other government departments, routinely collects representative air, water, soil and food samples figure 2 and analyzes them at hko s radiation laboratory at king s park figure 3

    至於監食物及食的照射途徑方面,天文臺在其他政府部門的協助下,定期收集空氣泥土和食物中代表性的樣本圖2 ,並在於京士柏的輻射進行分析工作圖3 。
  10. Regarding the food and water pathway, hko, with the assistance of other government departments, routinely collects representative air, water, soil and food samples ( figure 2 ) and analyzes them at hko s radiation laboratory at king s park ( figure 3 )

    至於監食物及食的照射途徑方面,天文臺在其他政府部門的協助下,定期收集空氣、、泥土和食物中代表性的樣本(圖2 ) ,並在於京士柏的輻射進行分析工作(圖3 ) 。
分享友人