水位表水管 的英文怎麼說

中文拼音 [shuǐwèibiǎoshuǐguǎn]
水位表水管 英文
water gage water pipe
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : Ⅰ名詞1 (外面;外表) outside; surface; external 2 (中表親戚) the relationship between the child...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 水位 : stage; water level
  • 水管 : waterpipe; water carrier; aqueduct; water conduit; water pipe; syphon; siphon (消防) 水管車 hos...
  1. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供一千二百五十萬加侖,已降到低於排口。都市監察官兼道局技官土木工程師斯潘塞哈蒂奉道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的,除了飲用外,下令一律禁止使用市裡供應的自來。尤其是南都柏林濟貧院,盡限定用六英寸的計量器,每個貧民每日配給十五加侖,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查證實,每夜要浪費兩萬加侖,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  2. Proper and active habitat management work is essential to maximize the ecological values of these freshwater ponds and our reserve staff at mai po have cautiously managed these habitats by controlling the water levels, clearing invasive water plants as well as removing exotic fish in the systems, said samson so, wwf hong kong training officer. exuviae of dragonfly

    世界自然基金會培訓主任蘇毅雄示:適當的生境理工作,對于提高淡池塘的生態價值至為關鍵,保護區的員工透過控制清理外來生植物和生態系統中的外來魚類,仔細而謹慎地理生境,令生境成為不同野生生物的理想居所。
  3. Government ' s monopoly of capital market also leaded to the " shell " value of listed company which is irrelative to the company ' s invest value, which made the higher general price in the market. in addition to, the structure of investors which is consisting of many individual investors and few institution investors lets it easy to manipulate the stock market for the institution investors. according to the origins of the systematic risk, it is necessary to improve the market mechanism and market efficiency to eliminate the system root of the risk to decrease the risks

    突出地現在:資本市場服務于國企轉制,造成上市公司股權結構存在缺陷,致使公司治理失效,上市公司缺乏持續發展的能力,公司經營風險轉化為市場的系統性風險;政府對資本市場準入的行政性壟斷,形成上市公司「殼」價值,虛高股票市場價格,引發系統性風險;金融市場分割,特別是貨幣市場資金缺乏進入資本市場的正常渠道,利率市場化平低,影響金融資產定價,導致違規融資盛行,加大了市場風險;而由於市場監不到,以散戶為主的投資主體結構,則易導致機構大戶利用內幕信息操縱股價,機構投資者的發展不僅沒有成為穩定市場的力量,反而成為操縱市場的主力,加劇了市場波動。
  4. Based on consider hereinbefore, this dissertation discusses several aspects on the problem of the sustainable and optimum exploitation of groundwater resources as follows : ( 1 ) reviewed entirely the origin and evolvement of the concept " sustainable development ", stated and commented the study status in queue on " sustainable development " around national and international range, thorough discussed the science connotation about the concept " sustainable development " ; ( 2 ) looked back and commented across - the aboard some furthest basic concept and proposition related to groundwater resources, put forward self opinions on a few existent mistake points of view and chaos understandings ; ( 3 ) expatiated entirely on the content and meaning of the theory of changeable groundwater resources system, contrast with the traditional methods of groundwater resources calculation and evaluation, combined example to show the application of this theory ; ( 4 ) thorough analyzed the difficult and complexity to forecast the groundwater resources, fully stated the traditional methods of groundwater resources forecasting, pointed out the characteristic and applying condition of these forecasting method, introduced the main ideas and methods of wavelet analysis developed recently, and the matlab software be known as the fifths era computer language, and its accessory wavelet analysis toolbox, applied these methods and tools to analyze the groundwater dynamic curve, adopted the b - j method and morte - carlo method, combined with the theory of changeable groundwater resources system, discussed the new view on the forecast of groundwater resources ; ( 5 ) synthetically analyzed the characteristics and limitations of the present all kind of groundwater manage model, combined mathematical programming mathematical statistics random process and the theory of variation system of groundwater resources on the unite optimum attempter of surface water and groundwater, emphasized how to make the model more nicety, more simple, more practicality ; ( 6 ) analyzed the inside condition and outside condition to assure the sustainable and optimum exploi tation of groundwater resources, the inside conditions are the follows : correct resources idea, scientific methods of resources calculation and evaluation, credible forecast methods of resources, exercisable measures of resources management, the outside conditions are the follows : the development idea of high layer, the transform of manage system, the matched policy and rule of law, the adjusted of economy lever, the improve of cultural diathesis, the boosting up of water - saving consciousness and detail measures, the control of population rising, the prevention and cure of water pollute, the renew and rebuild of ecology ; ( 7 ) scan the sustainable and optimum exploitation of groundwater resources from the high level of metagalaxy, earth system science, and philosophy ; lint out the more directions on groundwater resources

    基於以上考慮,論文主要從以下幾方面對地下資源可持續開發問題進行了比較深入的探討:全面回顧了「可持續發展」概念的由來與演變,對國內外「可持續發展」的研究現狀進行了述評,並對「可持續發展」概念的科學內涵進行了深入探討;對涉及地下資源的一些最基本的概念和命題進行了全面的回顧和評述,對目前仍然存在的一些錯誤觀點和混亂認識提出了自己的見解;全面闡述了地下資源變值系統理論的內容和意義,並與傳統的地下資源計算評價方法進行了對比分析,結合實例具體說明了方法的應用;深入分析了地下資源預測預報工作的極端重要性和復雜性,對傳統的地下資源動態預測方法進行了全面的評述,指出了各類預測預報方法的特點及適用條件,對最近二十多年剛發展起來的小波分析技術的主要思想和方法及其應用范圍,以及號稱第五代計算機語言的matlab軟體和附帶的小波分析工具箱進行了介紹,並應用於地下動態過程線的分析,採用時間序列中的b ? j法,蒙特卡羅方法,與地下資源變值系統理論相結合,探討了地下動態資料分析和地下資源預測預報的新思路;綜合分析了現今各類地下理模型的特點及缺陷,將數學規劃、數理統計、隨機過程等與地下變值系統理論相結合進行地地下或多源的聯合優化調度,使模型更準確、更實用;對保證地下資源可持續開發的內部條件和外部條件進行了分析,內部河海人學博卜學論文前言、摘要、目錄條件主要是正確的資源觀,科學的資源計算與評價方法,可靠的資源預測預報技術,可操作的資源理措施,外部條件主要是高層發展思路、理體制的變革、配套的政策法規、經濟杠桿的調節、人文素質的提高、節意識的增強及具體節措施、人口增長的控制、體污染的防治、生態的恢復和重建等;從宇宙科學、地球系統科學及哲學的高度審視地下資源的可持續開發;指出了地下資源可持續開發的進一步研究方向。
  5. In fact, it is the special system of our country that increase the incoherence and unconditionally of all the stockholders and the lack of the true investors. these two elements increase the stockholders " dissimilated behavior. in dividend policy, the difference of payment level resulted from the variance of the controlling degree embodies not the difference of stockholders " decision making to increase the company " value but the particular preference of the nonnegotiable shareholders and the management

    而最根本的原因是由於我國特定製度安排導致了股東群體的非一致性和非制約性的強化以及真正投資主體的缺,兩個因素的共同作用加劇了股東行為的異化,現在股利政策上,由股權控制度變化產生的支付平差異主要體現為非流通股股東及理層的特殊偏好,而從質的角度,以公司價值為目標的真正股東化主體的決策差異分析無效。
  6. But in the new situation, our shipping industry does n ' t fit for our nation development and the main problems the waterage industry has are as followed : ( 1 ) transport ability structure is not proper, and vessels are very old. transport ability is overmuch, also the type of ship is not standard. average tonnage of the shipboard is small

    目前航運業存在的問題主要現在: ( 1 )運力結構不合理,船舶老齡化,內河運力過剩,船型雜亂,平均噸小; ( 2 )航運企業組織結構不合理,經營機制不活,從業人員素質較差,平低; ( 3 )理體制不順,宏觀調控力度不夠,政企不分,各自為政,市場競爭秩序難以有效維護。
  7. When soil antecedent condition is dry and the initial rainfall intensity is high, peak surface runoff also considerably lag behind that of rainfall, because of the formation of temporary relative impermeable top layer ; b ) surface runoff is controlled primarily by infiltration - excess runoff mechanism under unsaturated condition ; the major fraction of surface runoff are dominated by saturated infiltration - excess runoff response, only a small fraction by return flow mechanism when soil is saturated ; c ) subsurface flow is dominated by saturated runoff mechanism, and the duration of subsurface post the rainfall end is dependent upon rather the soil properties than the rainfall characteristics ; d ) subsurface flow intensity in cultivated soil layer ( 0 ~ 20cm ) is high up to 35mm / h when rainfall intensity is up to 120mm / h, indicating the existing of macropores and pipe flow in cultivated layer

    2 )耕作制下紫色土的產流主要機制是: 1 )當雨前土壤含量未達到飽和狀態時,面產流起始時間有明顯滯后現象,這與紫色土的快吸性和較多非毛孔隙密切相關;當雨前土壤較乾燥,降雨初期雨強較大時,易形成臨時相對不透層,面產流峰也有明顯滯后現象。 2 )面徑流的產流方式主要是超滲產流,當土壤達到飽和狀態后,有四川大學博士學論文小部分回歸流發生,但主要是飽和超滲產流發生,因為紫色土的相對不透層和其它透障礙層不明顯。 3 )壤中流主要是飽和產流,與降雨過程有明顯的滯后,而且雨停后的壤中流產流歷時與降雨特徵無關。
  8. The oil loading system and the management of oil bin in the oil - bin area is intensive and the measurement method is under - developed at present time. in order to resolve this problem and realize the automatic management, this thesis analyzed the demands of the system, and then integrated the optical fiber sensing technology, the advanced computer technologies of hardware and software, the technologies of intelligent instrument, auto - control and communication ; finally a distributed and intelligent monitoring system of the automatic oil - loading system was developed. the thesis contains hardware design, software design and communication design

    為了解決罐區裝車手動付油與油罐手工檢尺測量勞動強度大,方法落後以及油庫安全性要求非常高的問題,提高油庫自動化和信息化平,本文從監控系統用戶需求與功能分析入手,結合當前飛速發展的光纖傳感技術、計算機軟體、硬體技術、智能儀技術、自動控制技術和通訊技術,開發了一套用於石化行業的基於光纖傳感技術的集自動付油理及儲油液、溫度等安全檢測功能於一體的油罐庫區自動付油理系統。
  9. Gunagzhou panyu rongxiang faucet co., ltd. was opened in 1998, the new factory locates in shiji town panyu district guangzhou city, the area is 1, 5000 square meters. it has more than 800 staff and 18 professional workshops now. they are founding workshop, forging workshop, punching workshop, cnc workshop, claming workshop, soldering workshop, polishing workshop, assembling workshop, mould workshop, polishing workshop, electroplated workshop, test workshop etc. we have the ability to work in pineline from casting, forging machining step to polishing and plating step

    廣州市番禺榮祥暖器材有限公司創建於一九九八年,廠區於廣州市番禺區石基鎮,佔地15000平方米,主要以生產陶瓷閥芯和暖器材配件為主,現有員工八百多名,擁有鑄造車間(分為引鑄和砂鑄) 、鍛壓車間、沖壓車間、數控車間、鉗工車間、焊接車間、拋光車間、彎車間、模具車間、新產品試制車間、電鍍車間、試驗車間、檢測車間、裝配車間等十八個專業車間,具備了從鑄造、鍛沖壓、機加工到外層拋光電鍍一條龍的生產能力。
  10. With a field survey of aas, a car rental service business in the suzhou, those theories and methods of job satisfaction were put into practice. a system of measurement aiming at aas staff was designed from aspects of job itself, rewards, support, peer group, corporation management and operation. apart from the above mentioned, some variables, such as staff gender, age, education background and position were also taken into account in the analysis of job satisfaction

    本文第二部分是員工滿意度實證分析,在實地走訪和調研蘇州aas汽車租賃企業的基礎上,將工作滿意度調研分析的有關理論與方法運用到實踐中,設計了一套針對aas員工的工作滿意度量,從工作本身、工作回報、工作支持、工作群體、企業理、企業經營等六個維度來調研分析aas員工工作滿意度狀況,並對員工性別、年齡、教育平、職職務等變量對工作滿意度的影響進行了分析。
  11. It includes : dynamic show of technics flow, real time data acquirement and show, history data save and print, fault alarm, etc. the plc control system mainly accomplishes the wastewater technics flow control, harmonizes the logical relationship among local intelligent control instruments and transmits the state of each local equipment to the industrial computer simultaneously, the plc control station receives the control commands from the industrial computer ; the local intelligent units take charge of the correlated parameters measure, disposal and control, and it will transmit the related parameters to the computer, etc. in this thesis, introduced municipal wastewater treatment technics, the integrated application program development of computer, the design method of plc control station, the communication between plc control system and computer, and the network of wastewater treatment with profibus - dp was also discussed

    計算機主要實現遠程監測和理功能,具體包括:工藝流程動態顯示、實時數據獲得及顯示、歷史數據存儲與列印、故障報警等功能plc控制系統主要完成工藝流程式控制制以及協調現場各智能儀之間的邏輯關系,將現場各設備的運行狀態通過通訊網路傳輸到上計算機,並接收上計算機的控制指令;現場各智能儀單元負責各相關參數的監測和處理、控制,並將有關參數送往上監控計算機進行處理、保存等。本文以莎車污處理項目為例,介紹了城市污處理工藝、上監控計算機的綜合應用程序開發、城市污處理自動控制系統plc控制站的設計和採用profibus系列中廣泛應用於現場設備的profibus - dp總線。
  12. Experimentation of sewage pumping station based on predictive control with vvvf is carried out. the experimentation result shows that the sewage pumping station predictive control system can be running under the condition of high water level. by using this control mode, inflow sewage is pumped out entirely

    在模擬研究基礎上,搭建了模擬試驗系統,在實驗室條件下,對污泵站排放系統進行了結合變頻調速的預測控制模擬試驗,試驗結果明,採用預測控制,可以使系統運行在高低揚程的工況下,使流入泵站網的污等量排出,實現了節能無污的控制目標。
  13. On the basis of repeated analyses and verifications, the construction techniques of shed - pipe grouting etc. are adopted therein, with which the tunneling in low - cemented sandy soil is successfully carried out under the condition of higher ground water level, and then both the design and construction are demonstrated to be reasonable and reliable through the actual water delivery operation

    在反復分析論證的基礎上通過採用注漿棚等施工技術,成功地在高地下低膠結度的砂性土中開挖隧洞,實際過應用明設計施工是合理可靠的。
  14. The cause of vacuum degree formation under groundwater table is discussed in the paper. the testing results show that vacuum degree above the groundwater table is produced directly by pumping air, and that vacuum degree below groundwater table is produced mainly by dewatering and by escaping of sealed air from the end of flexible pipe. based on the bernoulli equation, the limit lowering of groundwater table is analyzed, which is about 5 ~ 7m. the effective influence depth of vacuum preloading has relationship with pvds depth and can be more than 10m

    對地下線以下的真空度成因進行了分析,結果明,地下線以下測到的真空度是由於測試軟下降或部分封存氣體從軟末端逃逸引起的,與地下線以上的真空度由抽氣直接形成在成因上存在不同;根據伯努俐方程,對地下下降的極限深度進行了分析,得出真空預壓中地下的極限下降深度為5 7m ;對有效影響深度的分析結果明,真空預壓的有效影響深度與塑料排板的打設深度具備一定關系,有效影響深度可以超過10m 。
  15. On the other hand for four main vegetation typies, which are picea crassifolia, forests sabina przewalskii forests, bushes and pastureland, whose soil permeability function was analyzed from angle of its physics, capacity of water, storing water in it. the results show as follow : permeability function of soil is controlled by quality of soil hole. the quality and quantity of soil hole under picea crassifolia forests are the best, and the permeability also is the best

    另外,從土壤物理性質、蓄量、貯量等角度對祁連山苔蘚雲杉林、祁連圓柏林、亞高山灌叢林、牧坡草地4種主要植被類型的土壤滲透功能進行分析,結果明:土壤的滲透功能主要由土壤非毛孔隙度的質和量決定的,苔蘚雲杉林土壤非毛孔隙度的質和量最好,它的滲透也最好;雖然亞高山灌叢林的滲透功能次之,但由於它所處的置和面積大,現實貯量在祁連山四種主要植被類型中最大。
  16. The test study change of the soil pressure, the touch pressure between pipe and soil, pore pressure, the movement of depth soil, the underwater level and the deformation of earth surface in process of pipe jacking

    研究了頂施工過程中引起的土壓力、土體與壁的接觸壓力、孔隙壓力、深層土體移、地下的變化以及地變形等的影響。
  17. The ankle in question is the same one on which he had reconstructive surgery in may, although brown said the knee felt worse than the ankle

    他腳踝受傷的置就是他3月動手術的同一置,盡示他感覺膝蓋比腳踝更糟糕。
  18. After the transformation, the wall temperatureof the sampling tubes was obviously descended, their radiating performance improved, andthe measuring accuracy of the water gauge ensured

    改造后,計正負壓取樣壁溫明顯下降,正負取樣的散熱性能改善了,儀測量的準確性得到了保證。
  19. The break was assumed to be a single tube double - ended and three - tube double - ended shear break. the diameter of the break orifice is 0. 876mm and 1. 518mm respectively. the characteristic responses of main thermal - hydraulic parameters, such as primary pressure, secondary pressure, break flow rate, pressurizer level, secondary side level of steam generator and so on, were presented in this thesis

    試驗再現了核電廠蒸汽發生器單根傳熱雙端斷裂事故和三根傳熱雙端斷裂事故發生后的熱工力現象,給出了事故過程中一次系統壓力、二次系統壓力、破口流量、蒸汽發生器二次側、穩壓器、元件面溫度等主要參數的瞬態響應。
  20. The results indicate that the flow velocity is lower and the pressure is high in majority of the step cylinder, the distinct variations of the flow field occur in the threshold of the step cylinder at the bottom and the abrupt transition sections, the holes in the inner and outer tubes and the exhaust hole

    結果明:步進缸內大部分區域流體流速較小,壓力較高,且變化不大,發生明顯變化的部主要分佈在步進缸底部入口及截面突變處、內外套對孔處和排氣孔處。
分享友人