水傳播性流行 的英文怎麼說

中文拼音 [shuǐzhuànxìngliúháng]
水傳播性流行 英文
water-borne epidemic
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 傳名詞1 (解釋經文的著作) commentaries on classics 2 (傳記) biography 3 (敘述歷史故事的作品)...
  • : 播名詞(姓氏) a surname
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • 傳播 : 1 (廣泛散布) disseminate; propagate; spread; (over); diffuse; transmit; run 2 [物理學] propag...
  • 流行 : prevalent; popular; fashionable; rage; run; in vogue
  1. According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river

    根據小浪底下游各站沙峰均滯後於洪峰的35場洪,對沙峰滯後於洪峰的特了剖析,建立了小浪底、花園口、夾河灘、高村、孫口、艾山、利津各河段沙峰滯后時間與上站洪峰量、沙峰含沙量、洪速度、懸移質泥沙群體沉速之間的回歸方程,可以用來查補延長沙峰滯后時間,為下游各站沙峰時間的準確預報提供依據。
  2. These laboratory test results together with the spatial and temporal distribution of cases in amoy gardens and the epidemiological picture argue against airborne transmission or transmission through contaminated water

    這些化驗結果、淘大花園個案的時序及空間分佈、及病學分析,均推翻了經由空氣或食的可能
  3. These laboratory test results together with the spatial and temporal distribution of cases in amoy garden and the epidemiological picture argue against airborne transmission or transmission through contaminated water, " dr yeoh said

    化驗結果、淘大花園個案的時序及空間分佈、及病學分析,均推翻了經由空氣或食的可能
  4. In the end, in view of the fact that boussinesq - type equations and the mild slope equations are deduced from different hypothesis conditions and behave differently in simulation of wave propagation, the numerical results of wave propagation effected by strong non - linearity are given by the nonlinear three - dimensional mathematical model which was established for the calculation of 3 - d wave particle velocity and wave pressure and suitable to small size waters of arbitrarily varying depth

    最後,鑒于boussinesq型方程和緩坡方程是在不同的假設條件下推導而來,應用於描述近岸域波浪的變形時具有不同的特點。本報告根據作者所建立的可以對任意深點場與波動凈壓力場進求解、適宜深任意變化域非線的數學模型,提供了在較強非線作用下波浪的數值模擬結果。
  5. Based on analyzing discharge data in guide, xunhua, tongren hydrologic station and river course character, propagation time of different discharge in different river course is presented, and prediction period of interval flood, main stream flood during construction and operation period are acquired

    通過對貴德、循化、同仁文站量資料以及河道特的分析研究,得出不同量在不同河道上的時間,歸納出區間洪和幹在施工期和運期的預見期。
  6. This paper discusses on meanings and characters of knowledge ' s control, inquires into structure and process of knowledge management on the basis of control, and sets up control model of knowledge management

    摘要本文對知識的內容傾向控制、平層次控制、控制、發展創新控制等問題進了研究和分析,進而探索了知識管理的控制模式。
分享友人