水力建築物 的英文怎麼說

中文拼音 [shuǐjiàn]
水力建築物 英文
hydraulic structures
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  1. 1 sedimentation anyslys of soil under the action of deadweight ; 2 sedimentation anyslys of structure in using ; 3 endogen force anyslys of structure in using ; 4 soil remolding type anyslys ; 5 homogenous flush works anyslys ; 6 anyslys of the structure sedimentation effects of different flushing amount at the same place ; 7 anyslys of the structure sedimentation effects of different flushing places ; 8 anyslys of the structure sedimentation effects of different horizontal flushing places ; 9 anyslys of the structure sedimentation effects of different vertical flushing places ; getting the different between the endogen force of common structure and that of slant structure. the rule of stricture sedimentation and the effect of different soil remolding type were also gained

    對掏土糾偏過程做了以下9個方面的分析: 1 、土體在自重作用下的沉降分析; 2 、在使用階段的沉降分析; 3 、在使用階段的內分析; 4 、土體受擾動類型分析; 5 、均勻沖施工過程分析; 6 、同一個地方沖量大小不同對沉降影響分析; 7 、不同沉井沖沉降影響分析; 8 、進深不同的土層沖沉降影響分析; 9 、不同埋深土體沖沉降影響分析。
  2. Technical regulation of modelling for hydraulics of navigation structures

    通航學模擬技術規程
  3. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發設項目,從地下空間靜結構穩定性分析角度出發,針對在該項目中涉及的高層和多層以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應矢量圖、位移分布圖( ux 、 uy )以及應等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同平與垂直剖線的應_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同平或垂直剖線的應_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層地下開挖硐室時的工程設計和工程施工提供參考依據。
  4. Intake tower, as a sort of waterpower engineering, have complicated figure structure, boundary conditions and load situation

    塔是一種體型結構、邊界條件和受情況比較復雜的
  5. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河庫供工程取頭部由引渡槽、節制閘、進閘、泄閘等組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上與泄要求,對其過流能也要經試驗確定,為碧流河庫增旁通管設計提供依據。
  6. So the topic for farther discussion will be developed on the ground of soil - foundation - structure interactions, and em phasizes particularly on the investigation for dynamic effects on interaction of pile - supported structures subjected to lateral seismic load at layered - soil media. it will provide engineering application with practical and concise computational method, but also provides the aseismatic design for pile - supported structures with proper theory foundations and schemes to some extent on condition that definite codes are absent at present. the full article is divided into six chapters, as follows : 1

    本論文工作將圍繞地基-基礎-上部結構共同作用這一課題作進一步探討,側重於平地震作用下層狀地基土中的樁基-的動相互作用的研究,為實踐應用提供了適合於工程目的的、比較簡捷的實用計算方法,亦擬為沒有明確規范指導的樁(土)基礎-結構抗震設計提供一定的理論依據和設計議。
  7. The environmental protection type emulsion paint that this enterprise developed has absorbed foreign latest technology. it is used on various kinds of building s interior walls and outer walls for painting and coating. it has very good binding power with cement and concrete basis material, the color is refined and gorgeous

    本企業研製出的環保型乳膠漆吸收了國外最新技術,成功使用於各種的內墻、外墻塗裝,與泥、混凝土基材具有很好的結合,顏色典雅,艷麗。
  8. Moreover, there are drawbacks like difficulties in stimulation, complexity of calculation and heavy work in all these models because of many other factors. for example, the complexity of the dam structure, difficulties in measuring the physical and mechanical parameters of building materials and subgrade soil, stimulating the geologic structure of subgrade, predicting effects of loads, construction and environment on the dam and so on

    此外,由於大壩結構復雜,材料和地基巖土的學指標難以測定,復雜地基的地質構造還很難模擬,荷載、施工及環境因素對的影響還很難準確預測,應用各種模型都存在著模擬困難、計算復雜、工作量大等不足。
  9. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流的等級、工布置。通過學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝利樞紐工程採用圍堰擋汛后時段洪導流方案的合理性和經濟性,為施工決策提供理論依據。
  10. Through a systematic research, the author enter to provide the theoretical basis for selecting reasonable index of normal frozen - heave forces and the technology for preventing and controlling frozen damage

    通過系統研究,渴望為季節凍土區涵閘類基礎板的設計部門提供法向凍脹值的設計指標,以便做到基礎的合理淺埋和進行抗凍脹設計。
  11. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國電事業也迎來了迅猛發展的大好時機,一批高壩電站正在設或規劃之中,其泄孔口及頭愈來愈大,常規混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的作用,隨著預應技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  12. This paper gives a review on the five analysis approaches of fluctuation pressure on the hydraulic structures and hydromachines : the method of probability and random process, the method of time - space correlation, the method of fitting data, the method of distribution hypotheses on the data of test survey stations, and the hydromechanics method

    摘要綜述了利機械上脈動壓的五種分析方法:概率和隨機過程法;時空相關法;數據擬合法;根據實驗測點數據分佈假設法;流體學方法。
  13. Ordinary it takes over 30 % cost of total irrigation buildings. in seasonal frozen soil area, frozen heave produces frozen - heave forces on the slab - foundation. it often make the slab - foundation damage due to bending, twisting and growth - up if the construction is build following non - frozen soil design methods

    季節凍土區涵閘工程是利工程設中常見的一種結構,一般占工程造價的三分之一以上,在季節凍土區由於土凍結后產生的凍脹,對板基作用有凍脹,所以按照融土壓設計的板基經常發生彎曲、扭轉、上抬等破壞。
  14. The improper excavating will bear capacity, water permeability, natural structure and geological structure worsenning the base rock of foundation., this ca n ' t be allowed to the water conservancy project building, especially to block water building. lt will not only increase the expenses happened of the remedy measure, but also lengthen building straight line time limit for a project of construction

    開挖不當將降低基巖的承載能、增大基礎的透性、惡化基巖的天然結構和地質構造,這對於,特別是擋是不能允許的,同時將會增加採取補救處理措施所發生的費用,延長施工直線工期。
  15. 5 ) to solve the uncertain modeling problem about hydraulic buildings, a new modeling method named aggregation modeling based on graph object technique is put forward. as a result, the graph model of solid gravity dam is designed. the graph object of water _ proof dam section taken as an example, the design and implement of self defined graph object is discussed

    5 )根據不定型模的特點,提出一種基於圖形對象技術的聚合模方法,詳細討論了聚合模法的基本原理;設計了實體重壩的圖形對象模型,並以擋壩段圖形對象的設計為例,研究了自定義圖形對象的設計和實現;基於objectarx的通知? ?反應機制,採用數據庫反應器和對象反應器,立了圖形對象的互動操作機制;以擋壩段斷面優化設計為例,研究了圖形對象和分析、計算功能的集成方案。
  16. By analysing the experimental research results and original observation data, the influences of sands contained stream flow to the lateral pressure and uplift pressure on the hydraulic structures, which provided foundations for hydraulic structure design in unclear water situation is demonstrated

    通過實驗研究成果和原型觀測資料,分析論證了含沙流對側壓和揚壓影響,從而為渾情況下設計提供了科學依據
  17. Failure of hydraulic structure by ice pressure and protective measures

    冰壓的破壞及防護措施
  18. Dtu 65 - 10. building works. private contracts. piping used for cold and hot pressure water and piping for evacuation waste water and rain water inside buildings. general rules of execution. part 2 : special clauses

    Dtu 65 - 10 .工程.專門合同.用於冷和熱壓內排廢和雨的管道的鋪設.施工一般規則.第2部分:特殊條款
  19. In collaboration with its sister company in hong kong, fugro technical service limited ( ftshk ), ftsgz is able to provide a one - stop service of data acquisition and interpretation from soil and rock, concrete, steel, asphalt, water and architectural items, with activities covering physical and chemical testing, pile testing, inspection, environmental monitoring and equipment calibration

    廣州市輝固技術服務有限公司,聯同香港的兄弟公司:輝固土工程及檢測有限公司(簡稱ftshk ) ,能提供一站式服務予客戶,業務范圍涵蓋理和化學測試、椿基測試、料檢驗、環保監控及儀器校正等,我們能對土壤、巖石、混凝土、鋼筋、瀝青、料進行準確的檢測和分析。
  20. As a project financed by yunfeng and ming tomb hydroelectric power station, the study on " mathematical model for dam safety monitoring and dynamic inverse model for underground power house " was conducted. according to the data observed in - situ, the under - fitting problems in regression models for dam safety monitoring were discussed, and the computational parameters and boundary conditions of underground structures were determined on the base of dynamic inverse mathematical model

    本文利用大壩運行監測資料和電站廠房結構的振動測試數據,對的正反分析模型中的相關問題進行了探討,分析了大壩安全監測回歸模型存在的欠擬合現象,立了通用的結構動最優化反分析模型,實現用戶優化演算法對復雜結構的直接調用和優化計算,在計算模型方法的基礎上對雲峰寬縫重壩的安全狀況和十三陵抽蓄能電站的動反演問題進行實例分析。
分享友人