水力測功器 的英文怎麼說

中文拼音 [shuǐgōng]
水力測功器 英文
hydraulic dynamometer
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 名詞1 (功勞) exploit; merit; meritorious service [deed]: 戰功 military exploits; 立功 render me...
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  1. It is necessary to control the mechanical stimuli precisely in the studies of cardiac mechano - electrical feedback ( mef ). in the present study a ventricular pressure - clamping system has been developed, which can be applied to isolated - perfused rabbit hearts. controlled by a computer, this system not only can make the left ventricle follow a command defining the same pressure wave as that during a beating cycle under physiological condition, but also deliver mechanical stimuli with a proper waveform to the ventricle at a particular time phase. this system integrates multiple functions, including perfusing, pacing, recording of electrocardiogram and monophasic action potentials, and clamping and measuring of ventricular pressures in isolated - perfused hearts. thus, it is a distinct system for investigating the phenomena and mechanisms of cardiac mef at organ level

    在心臟機械電反饋的研究中準確控制機械刺激是非常重要的.本研究室構建了一套適用於離體家兔心臟的心室壓鉗系統.該系統通過計算機控制壓鉗,不僅能模擬正常生理條件下左心室的壓波形,還能在心室活動周期的特定時相、以適當波形對心室施加機械刺激.該系統集心臟灌流與起搏、表面心電圖記錄、單相動作電位記錄、心室壓鉗制與定等多種能於一體,特別適用於平上觀察機械電反饋現象並探討其機制
  2. Abstract : it is necessary to control the mechanical stimuli precisely in the studies of cardiac mechano - electrical feedback ( mef ). in the present study a ventricular pressure - clamping system has been developed, which can be applied to isolated - perfused rabbit hearts. controlled by a computer, this system not only can make the left ventricle follow a command defining the same pressure wave as that during a beating cycle under physiological condition, but also deliver mechanical stimuli with a proper waveform to the ventricle at a particular time phase. this system integrates multiple functions, including perfusing, pacing, recording of electrocardiogram and monophasic action potentials, and clamping and measuring of ventricular pressures in isolated - perfused hearts. thus, it is a distinct system for investigating the phenomena and mechanisms of cardiac mef at organ level

    文摘:在心臟機械電反饋的研究中準確控制機械刺激是非常重要的.本研究室構建了一套適用於離體家兔心臟的心室壓鉗系統.該系統通過計算機控制壓鉗,不僅能模擬正常生理條件下左心室的壓波形,還能在心室活動周期的特定時相、以適當波形對心室施加機械刺激.該系統集心臟灌流與起搏、表面心電圖記錄、單相動作電位記錄、心室壓鉗制與定等多種能於一體,特別適用於平上觀察機械電反饋現象並探討其機制
  3. The improvement system is made up of the pressure sensor, flow sensor, displacement sensor, electro - hydraulic proportional flow control valve, power amplifier, data gathering board and computer. the platform can carry out testing the hydraulic parameters, processing the tested data, saving the processed data and drawing, adjusting the pressure automatically

    改造后的控系統主要由壓傳感、流量傳感、位移傳感、比例節流閥、率放大、數據採集卡和計算機組成。改造后的實驗臺具有自動採集實驗數據、自動處理實驗數據、自動保存實驗數據、自動調節液壓系統負載壓能,大大提高了實驗臺的工作效率、試精度和智能化平。
  4. The main function of a governor is to monitor the speed deviation of a hydro turbine unit and convert it into the displacement deviation of the servomotor according to a specific characterisic. it is used to control the opening of the guide apparatus and to ensure the unit run steadily at fixed speed under a given load

    調速的主要用是檢機組轉速偏差,並將它按一定特性轉換成接的行程偏差,藉以調整機組導結構的開度,使機組在給定的負荷下以給定的轉速穩定運行。
  5. In order to guarantee the normal operation of hydroelectric generator unit, it is necessary to make a thorough test of the performance and characteristics of a governor before it is installed or after it is overhauled. to facilitate the test of the governor, a real - time dynamic simulator based on pcc for water turbine governing system was developed. it has three functions : simulating controlled objects ( pressure water conveying system, water turbine, generator and electric grid ), simulating governor " s electro - hydraulic servo system and working as a real - time measuring system for governor

    輪機調速輪發電機組一個很重要的自動化調節設備,它由調節和電液隨動系統組成,在調速安裝或者大修后都要對其性能和特性進行全面試,為了方便對輪機調速試,特開發機組調速系統實時動態模擬儀,該模擬儀具有三種能:對調速調節對象(有壓引系統、輪機、發電機和電網)進行模擬、對調速電液隨動系統與調節對象進行模擬和作為實時試系統監調速的工作是否正常。
  6. A simulative analysis of assembly process for hydraulic dynamometer rotors

    水力測功器轉子裝配過程模擬分析
  7. On the countermeasures of match for marine diesel engine and hydraulic power detector

    柴油機與水力測功器配合問題及對策研究
  8. Two klimov tv3 - 117v turboshafts provide a top speed of 250 kmh and a range of 800 km. upto 2000 kg of disposable stores can be carried in a lower - fuselage weapon bay, and generally comprise two torpedoes or depth charges

    裝置為2臺tv3 - 117v渦軸發動機,單臺率1660千瓦,可安裝吊掛聲納聲納浮標磁異探雷達告警接收機紅外干擾,並可載魚雷深炸彈等。
  9. Accordingly this thesis conducts research on the design and management of swimming pools from the running management of its disinfection, reasons and precautionary measures of its water quality mutation in summers and autumns and its water - saving and energy saving. through the participation of the field running management, the literature search, the actual running experience and the theoretical analysis, this thesis forwards drainage & water supply optimization rules for swimming pools. based on field investigation and research on the filtration speed improvement in pressure filters, it is pointed out that there is a wide filtration speed improvement range in pressure filters

    鑒此,該課題從消毒殺菌的運行與管理、夏秋季游泳池質突變的原因及防治措施以及運行過程中節節能措施等三個方面對游泳池的運行管理模式進行了研究;通過參與現場管理與文獻資料的研究,結合實踐經驗,進行理論分析,提出了游泳池給的優化設計原則;經現場試,對壓過濾提速進行了研究,指出相對于目前規范值有較大提速潛;討論分析設計了大型多能游泳場館處理間自動化控制管理系統。
  10. 4, by making use of micro pore and permeability apparatus and optopn multifunction microscope etc. advanced reservoir testing equipments, the ability to show heterogeneity from micro to macro has been improved largely. k - level / k is more than 1. 4 in south region reservoir, that is to say, the permeability in section is worse comparing to that of level direction, which is caused mainly by mud layers : different stone facies results in different micro feature, and in the south region, fluvial sandstone has cementation, compaction, corrosion and exchanging diagenesis, which occurred in b stage of early period

    4 、應用微孔滲儀和opton多能顯微鏡等先進的儲層試儀設備,大大提高了從宏觀到微觀表徵儲層非均質的能;南區儲層中k _ (平) k _的比值一般大於1 . 4 ,即垂向上滲透率相對於平滲透率差,這主要是砂巖中泥質紋層造成的;不同巖石相的微觀特徵不同,南區河道砂儲層主要有膠結、壓實、溶蝕和交代等成巖作用,成巖階段屬早成巖b期。
  11. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文試內容相當多,概括地說就是四個工況的試,即夏季製冷工況的試、冬季供熱工況的試、夏?冬過渡季試和冬?夏過渡季試;另外在夏季工況的試中還進行了變流量試,在冬季工況的試中還進行了熱平衡試。本文對試數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱量、熱泵空調供熱量(製冷量) 、熱泵空調輸入率、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋管進出溫度變化情形,得出地下二層埋管換熱能優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱泵系統停機一周內地溫恢復特別快。
  12. This paper presents a method of test, estimation and predication of some state parameters of the power unit in power and electric equipment, these parameters can be temperature, voltage, current and so on ; when attaining the values of these parameters at the next state, whether the power unit will go into the malfunction or not can be knew, according to the result, some measures can be made ; by controlling the values of correlative parameters, the unit could be maintained in its optimal running status ; so the damage to the power unit can be prevented, the running quality of the driving system can be guarantied, and the optimized control level of the system can be improved

    本論文提出了一種利用預估計的方法,對電電子設備中的件的某些主要狀態參量(如:溫度、電壓和電流)進行試、估計並預,從而得出未來的運行狀態;然後據此判斷該件是否已進入故障范圍,以便提前採取措施,通過對相關參數的調整來保證件始終工作在最佳狀態;這樣,既避免了件損壞的發生,又避免了驅動系統故障狀態的出現,明顯地提高了系統優化控制的平。
  13. From aspects of the principles and components of the water - supply system, the configuration of the water - supply system, and the pipeline pressure detecting equipment, etc., this paper introduces the design of the software and hardware of a new - type multifunctional constant - pressure water - supply system composed by the one - chip computer and converter

    從供系統的原理及構成、供系統的配製、管網壓裝置等方面,介紹了一種由單片機與變頻組成的新型多能變頻恆壓供閉環自動控制系統的軟硬體設計。
  14. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的設計製造經驗,擁有多項專利技術,生產的同步發電機永磁機技術工藝先進,製造精良,能滿足與各式輪機配套的不同技術條件要求。目前公司已製造投產的發電機容量范圍為0 . 120mw ,具備生產單擊容量50mw的能,發電機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高電壓達13 . 8kv ,公司製造的甘肅永昌東河電站34500kw輪發電機組,海拔為2868 . 5m ,成解決了高原防暈等難題。公司擁有電機試驗站絕緣材料試驗室等先進的實驗室設施和試手段,使產品從原材料進產,到成品出產的各項電性能試均能滿足設計要求。
  15. In light of cheng ' s balance container for measuring boiler barrel water - level, a new type instrument is introduced from its principle, characteristics and system composition etc. this new instrument has self - correcting funcion of water - level based on drum pressure ; and is of a high precision instrument for monitoring water - level of boiler barrels

    摘要針對成氏平衡容,從工作原理、特點、系統組成等方面,介紹了一種新型的汽泡控儀,它具有汽包位壓自動校正能,是一種高精度的汽泡位監控儀。
分享友人