水力機械化施工 的英文怎麼說

中文拼音 [shuǐxièhuàshīgōng]
水力機械化施工 英文
hydro-mechanisation construction
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : machineengine
  • : 名詞1. (器械) tool; instrument 2. (武器) weapon 3. [書面語] (枷和鐐銬之類的刑具) fetters, shackles, etc
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  • 機械化 : mechanize
  • 機械 : 1. (利用力學原理組成的各種裝置) machinery; machine; mechanism 2. (死板; 刻板) mechanical; inflexible; rigid
  • 施工 : be in the process of construction; be under construction; build; construction
  1. Abstract : this paper analyzes causal factors of flood in the middle reaches of changjiang river. due to neglection of environmental management, soil erosion in the upper and middle reaches of the changjiag river, lake sedimentation, large - scale reclamation of marshes, the flood regulation capacity of the lake was descended, and flood stage was risen and prolonged. consequently more and more river levees and lake dikes were reinforced almost every year to prevent the disasters, which made flood level go up and flood period last for more days. the frequency of flood and waterlogging disasters rose and their damage was enlarged. several proposals for flood prevention including agricultural modernization are put forward

    文摘: 1998年長江大洪后開始實的「平垸行洪,退田還湖」的土地利用調整方案,從長遠來說應尋求農業安全且收入逐漸提高條件下的土地利用,長江中游地區應積極推進農業現代,提高農業勞動生產率,轉移,減少分蓄洪區的人口,移民建鎮,對區內的土地要促進其規模經營,由優秀的有文的農民經營,平時只有少量的直接從事農業生產的經營管理人員,農忙時則大量地使用季節性合同或實現,大洪時退田還湖,減輕長江幹流大洪的壓,減少分洪與特大洪災時的損失,這樣還可促進避洪、冬季農業等的發展,也有利於長江中上游地區陡坡耕地的退耕還林,還可在糧食充足時進行休耕,在旱災、糧食緊張時擴大糧食生產?
  2. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元發展戰略,集團公司的業務范圍除程總承包外,還將業務擴展到各類土木程、市政程、海事程的設計、設備和金屬結構製造安裝等,核心競爭進一步得到擴展和增強,形成了年完成土石方開挖15000萬立方米、混凝土澆注1500萬立方米、發電組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合
  3. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽程的科研項目,綜述三峽程開以來的主要科研成果及程應用情況,包括:一期土石圍堰基礎處理與技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要選型;混凝土的原材料和耐久性優試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電組的科學研究。
  4. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽程的科研項目,綜述三峽程開以來的主要科研成果及程應用情況,包括:一期土石圍堰基礎處理與技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要選型;混凝土的原材料和耐久性優試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電組的科學研究。
  5. Based on the reality of zhangye oasis water resources utilization, and supported by the environmental economics theory, this paper is to research and analyze the agriculture water utilization in the oasis, including sunan, minle, shandan, zhangye, linze, gaotai sincel970s. to analyze the economic benefit of the unit provision output effected by the labor - flooding water volumes based on both the real collected data and the statistical data provided by the stat. dept in the past years ; the checking standard for output benefit is the unit provision out put the input parameters are water, fertilizer, power - supply and the cone - erned factors occurred during the agriculture production

    經過大量的實地考察,對甘肅的武威、張掖和酒泉三大綠洲的自然、經濟情況,尤其是農業生產情況和用情況進行了深入的調查和研究,在獲取實際資料的基礎上,結合統計部門提供的歷年統計數據,以糧食單產為產出效益衡量標準,以農業生產涉及的灌溉量、天然降量、肥農藥用量、農業生產用電量、農業總動以及自然災害情況等各相關因子為投入參數,利用sas 、 spss等統計分析軟體對數據進行處理和分析,分別採用實物量指標和價值量指標,分析人灌溉量這一投入要素,對糧食單產這一產出的總效益、邊際效益和平均效益。
  6. Integrate with construction building and design, municipal and governmental building, steel structure, installation of water, power, heating and rest room, premaking parts, hoist, decoration, fitting and making of aluminum alloy with comprehensive service. the company has power machinery equipment to build

    公司集建築、設計、市政、鋼結構、電暖衛、裝飾裝修、鋁合金製作安裝等為一體,實行一條龍服務,公司設備量雄厚,擁有與之配套的各種設備。
  7. Rock - fill dam is the one chief type of soil - rock dam, there are much virtue of safety function, adaptability used the local material, be benefit to mechanical building, be short in building time and low in cost, being simple in the building during closure and diversion, etc. it suit the condition of our nation and the environment where the water conservancy works and hydroelectric power plant located, we accumulate the ample practical experience and a series of achievement in scientific research and become a model of having ample competition in the construction and development of piled rock clam

    堆石壩是土石壩的主要壩型之一,它具有適應性強,就地取材,便於期短,造價較低等優點,在利樞紐設計中被廣泛應用,而且已經積累了豐富的實踐經驗和成套的科研試驗成果,在利樞紐的壩型選擇中具有很強的競爭。就堆石壩而言,根據築壩方式和築壩材料的不同,也有多種壩型。
分享友人